This document provides a safety report for the maintenance work of the Second Vivekananda Bridge Tollway Project in West Bengal for October 6th. It details that there were 414 safe man hours worked on October 6th, bringing the total to 3,106 man hours for the month. No safety incidents, accidents, or medical cases were reported. Good safety practices emphasized included safe manual material handling.
This document provides a safety report for the maintenance work of the Second Vivekananda Bridge Tollway Project in West Bengal for October 6th. It details that there were 414 safe man hours worked on October 6th, bringing the total to 3,106 man hours for the month. No safety incidents, accidents, or medical cases were reported. Good safety practices emphasized included safe manual material handling.
This document provides a safety report for the maintenance work of the Second Vivekananda Bridge Tollway Project in West Bengal for October 6th. It details that there were 414 safe man hours worked on October 6th, bringing the total to 3,106 man hours for the month. No safety incidents, accidents, or medical cases were reported. Good safety practices emphasized included safe manual material handling.
Project Management and Engineering Services for Routine, Periodic and
PROJECT: Specialised Maintenance Work of Second Vivekananda Bridge Tollway Project on NH-2 in West Bengal. DATE: 6-Oct-20 6-Oct Cumulative Items Remarks Till previous day For the day For Oct-20 Till Date 1 Safe Man Hours 2602 414 3106 3016 2 Tool Box Meeting 1 1 2 2 3 Fire and Abandon Drill/Mock Drill 0 0 0 0 4 Safety Meeting/Training 0 0 0 0 5 Safety Induction 0 0 0 0 6 No of Inductees 0 0 0 0 7 Safety Incidents 0 0 0 0 8 First Aid Cases 0 0 0 0 9 First Aid Training 0 0 0 0 10 Risk Assessment 0 0 0 0 11 Safety Walk 0 0 0 0 12 Pre-Start Meeting 0 0 0 0 13 Transport Accident 0 0 0 0 14 Fire Incidents 0 0 0 0 15 Medical Treatment Cases 0 0 0 0 SITE SAFETY ACTIVITIES AT SVBTC PROJECT GOOD PRACTICES