SCORING GUIDE
CANDIDATES REGISTRATION NUMBER
MAX SCORE
ASSESSMENT
S/N SCORING GUIDE
CRITERIA PROCESS PRODUCT (
(P) (R) (P) (R) (P) (R) (P) (R) (P) (R)
(P) R)
Observed Health,
1 Safety & Put on overall, gogles & Shoes 2
Environment
Selected the right Tools &
2
Prepared for the Equipment
2
Test
Organised the working area 2
Angle Line
Measured and Marked the
2
Angle Line
Measured and Marked the
Angle Line as 3Ft Width and 2
height 7Ft
Hollow Section 40x40x1.5mm
Measured and Marked the
2
Hollow Section
Measured and Measured and Marked the
3
Marked Hollow Section 40x40x1.5mm 2
35 1/2 Inches by 83 Inches
Mild Steel Plate
Measured and Marked the
2
steel plate partitions
Measured and Marked the
steel plate partitions 26 inches 2
by 32 1/2 inches
Measured and Marked the
steel plate partitions 25 1/2 2
inches by 32 1/2 inches
SCORING GUIDE
CANDIDATES REGISTRATION NUMBER
MAX SCORE
ASSESSMENT
S/N SCORING GUIDE
CRITERIA PROCESS PRODUCT (
(P) (R) (P) (R) (P) (R) (P) (R) (P) (R)
(P) R)
Angle Line
Cut the Width and Height of
the door frame from the 2
Angle Line
Cut the Width of 35" and
Height of 7 Ft from the Angle 2
Line
Hollow Section 40x40x1.5mm
Cut the Hollow Sections 2
Cut the Hollow Section
40x40x1.5mm as per
measurements and marking at 2
4 Cut 45 Degrees angle using the
square tool
Cut the Hollow Section
40x40x1.5mm partitions as
per measurements and 2
marking at 90 Degrees angle
using the square tool
Mild Steel Plate
Cut the steel plate 2
Cut the steel plate partitions
as per markings and
2
measurements i.e. 25 1/2
inches by 32 1/2 inches
SCORING GUIDE
CANDIDATES REGISTRATION NUMBER
MAX SCORE
ASSESSMENT
S/N SCORING GUIDE
CRITERIA PROCESS PRODUCT (
(P) (R) (P) (R) (P) (R) (P) (R) (P) (R)
(P) R)
Angle Line
Joined the Angle Line as per
specifications with Tack 2
welding
Hollow Section 40x40x1.5mm
Joined the Hollow Section
40x40x1.5mm as per
2
specifications with Tack
welding
Tacked partitions at 90
2
degrees
5 Joined Confirmed right squares and
2
diagonals
Joined the Frame to the Door
2
with Hinges with Tack welding
Mild Steel Plate
Joined the steel plate
2
partitions with Tack welding
Confirmed proper fitting of
2
the plate
Full Welded the assembled
2
parts
Grinded the door 2
Cleaned/ Sanded the Door 2
Painted the Door 2
Cleaned the work Pieces and
6 Finished 2
Handed over the Work
Organised and Cleaned the
2
workplace and stored the tool
Total Score Process + Product 60
SCORING GUIDE
CANDIDATES REGISTRATION NUMBER
MAX SCORE
ASSESSMENT
S/N SCORING GUIDE
CRITERIA PROCESS PRODUCT (
(P) (R) (P) (R) (P) (R) (P) (R) (P) (R)
(P) R)
Marks out of 100 = X/60*100 100
Assessor Name Signature
Name of Institution Date