Brick masonry project inspection batch quality acceptance record

No:
Project name Item Name PM
Construction Parts of
organization Acceptance
Name and No. of
construction Engineer
execution standard
Construction
Sub-contractor Subcontract PM
Team Leader
Acceptance records of
Regulation of quality and quantity acceptance Self-inspection record of construction
supervision (construction)
regulations unit
units
Strength grade of Design
1 brick requirements
MU
Strength grade of Design
2 Mortar requirements
M
3 Inclined to rub 5.2.3
Main lien
control Teeth-shape wall
4 with pulling steel 5.2.4
items bar
5 Mortar Plumpness ≥80%

6 Axis displacement ≤10mm


Perpendicularity
7 ≤5mm
(per layer)
1 Method of 5.3.1
The thickness of
2 Horizontal mortar 5.3.2
joint
General
3 The top face height ±15mm within
control 4 Surface flatness 8mm
Window and door
items 5 ±5mm
holes
6 Window deviation 20mm
The flatness of
7 Horizontal mortar 10
joint
Operation basis
Quality and quantity check record

Construction unit
Quality inspector: Technical director:
inspection results
evaluation
Date:
Supervision (construction) Supervisory engineer:
unit acceptance
(The construction unit project professional technical person in charge)
conclusions
Date:
General plastering project inspection batch quality acceptance record
No:
Project Name Item Name PM
Construction Parts of
organization Acceptance
Name and No. of
construction Engineer
execution standard
Subcontract Construction
Sub-contractor
PM Team Leader
Regulation of quality and quantity acceptance Self-inspection record of Acceptance records of supervision
regulations construction unit (construction) units
1 Foundation
processing 4.2.2
Main
Material 4.2.3
2 requirements
control
3 Strength Measures 4.2.4
items Surface bonding
4 4.2.5
requirements
Ordinary
4.2.6(1)
Surface plaster
1
quality Senior
4.2.6(2)
plaster
The quality of the
2 plastered
surface
around the corner 4.2.7
hole and groove box
General
Plaster layer
3 4.2.8
requirements
control
4 Diving joint set 4.2.9
items 5 Drop line set 4.2.10
Perpendicularity ordinary
of facade plaster
Flatness of ordinary
Allowable surface plaster
deviation
6 Inside and outside ordinary
mm corner plaster
Straightness of
ordinary
latticed strip
plaster
(seam)
Operation basis

Quality and quantity check record

Construction unit inspection Quality inspector: Technical director:


results evaluation
Date:
Supervisory engineer:
Supervision (construction) unit (The construction unit project professional technical person in charge)
acceptance conclusions
Date:
Brick masonry project inspection batch quality acceptance record
No:
Brick
Project name Y complex project Item Name PM Wu hua
masonry
Construction China Decoration Group Parts of
B2F
organization (Myanmar)co.LTD Acceptance
Name and No. of
construction 《建筑装饰装修工程质量验收规范》GB50210-2018 Engineer liangweilong
execution standard
Construction
Sub-contractor Subcontract PM
Team Leader
Acceptance records of
Regulation of quality and quantity acceptance Self-inspection record of construction
supervision (construction)
regulations unit
units
Design
1 Strength grade of
brick requirements Meet a criterion
MU
Strength grade of Design
2 Mortar requirements Meet a criterion
M
Inclined to rub 5.2.3
Main 3 lien Meet a criterion
control Teeth-shape wall
4 with pulling steel 5.2.4 Meet a criterion
items bar
5 Mortar Plumpness ≥80% 85 85 90 90 90 95 95 95 75 80

6 Axis displacement ≤10mm 5 7 6 5 8 5 3 0 3 5

Perpendicularity
7 ≤5mm 2 3 2 3 4 5 0 5 6 3
(per layer)
1 Method of 5.3.1 √ √ √ √ √ √ √ √ √ √
The thickness of
2 Horizontal mortar 5.3.2 √ √ √ √ √ √ √ √ √ √
joint
General
3 The top face height ±15mm within 8 10 5 8 10 12 8 10 12 8
control 4 Surface flatness 8mm 5 3 2 5 3 2 3 4 3 4

Window and door


items 5 ±5mm 5 3 2 5 3 2 3 4 3 4
holes
6 Window deviation 20mm 8 10 5 8 10 12 8 10 12 8

The flatness of
7 Horizontal mortar 10 5 3 2 5 3 2 3 4 3 4

joint
Operation basis Complete
Quality and quantity check record Complete

Construction unit
Quality inspector:liuming Technical director:xiaohui
inspection results
evaluation
Date: 2019.11.5
Supervision (construction) Supervisory engineer:mmsan
unit acceptance
(The construction unit project professional technical person in charge)
conclusions
Date: 2019.11.5
General plastering project inspection batch quality acceptance
record
No:
Brick
Project Name Y complex project Item Name PM Wu hua
masonry
Construction China Decoration Group Parts of
B2F
organization (Myanmar)co.LTD Acceptance
Name and No. of
construction 《建筑装饰装修工程质量验收规范》GB50210-2018 Engineer liangweilong
execution standard
Subcontract Construction
Sub-contractor
PM Team Leader
Regulation of quality and quantity acceptance Self-inspection record of Acceptance records of supervision
regulations construction unit (construction) units
Foundation 4.2.2
1 processing Meet a criterion
Main
2 Material requirements 4.2.3 Meet a criterion
control
3 Strength Measures 4.2.4 Meet a criterion
items Surface bonding
4
requirements
4.2.5 Meet a criterion
Ordinary
plaster
4.2.6(1) Meet a criterion
Surface
1
quality Senior
plaster
4.2.6(2) Meet a criterion
The quality of the
2 plastered
surface
around the corner hole 4.2.7 Meet a criterion
General and groove box
Plaster layer
3
requirements
4.2.8 Meet a criterion
control
4 Diving joint set 4.2.9 Meet a criterion
items 5 Drop line set 4.2.10 Meet a criterion
Perpendicularity of ordinary
facade plaster
4 2 2 2 1 2 3 1 2 3 2
ordinary
Allowable
deviation
Flatness of surface
plaster
4 2 1 2 3 4 2 3 1 2 3
6 Inside and outside ordinary
mm
corner plaster
4 2 2 2 1 2 3 1 2 3 2
Straightness of ordinary
latticed strip (seam) plaster
4 2 1 2 3 4 2 3 1 2 3
Operation basis Complete
Quality and quantity check record Complete

Construction unit inspection Quality inspector: liuming Technical director:chenghua


results evaluation
Date: 2019.11.5
Supervisory engineer:maensm
Supervision (construction) unit (The construction unit project professional technical person in charge)
acceptance conclusions
Date: 2019.11.5