The Main | Evanston 150 North Riverside 110 North Wacker
•
AMTRUST RE
•
•
local team
2 320 South Canal 1900 Lawrence | Denver
BLUE STAR PROPERTIES (16’ on Center)
Thalia Hall | Pilsen | 2014 Revival Food Hall | The Loop | 2017 The Salt Shed | Goose Island | 2022
1 7
2 3
5
4 7
6
1
13 12 11 10 9 8 8
135
South
LaSalle
13 12 11 10 9
6
The Field Building
A Living Landmark
8
9 The Field Building | A Living Landmark
SAMPLE of HISTORIC INTERIORS at GRADE
Interior Amenity
L43
Outdoor Amenity
• L43-L44:
• L27-L42:
L25
• L25-L26
• L16-L24:
• L5-L15 L15
• L3-L4:
• L2-Lower Level L5
L3
12 | A Living Landmark
LOWER ARCADE
NEW RESIDENTIAL
GARAGE EXIT SERVICE VESTIBULE
Marble Place GARAGE ENTRY
TBD FUTURE LOBBY
LOBBY 5 6
10' x 22' 10' x 22' 10' x 22' 10' x 22'
or RETAIL
LOWER LEVEL S STOR
FREIGHT LOADING
S MOVE IN
LOBBY
ROOM
22 STAIR TO
MANAGEMENT
LEASING
OFFICE DN LOWER ARCADE
STORAGE
RESTAURANT
DN RAMP FROM L3 7'-0" TO UNDERSIDE 10'-0" TO UNDERSIDE
17.5% SLOPE OF RAMP OF RAMP
MAIL ROOM RESIDENTIAL SEVICE LOBBY OF RAMP OF RAMP 16.7% SLOPE PACKAGE
RESIDENTIAL ROOM RESIDENTIAL
ENTRY ENTRY
CONCIERGE HISTORIC FINISH CONCIERGE
TRASH SECURE LOBBY
SECURE LOBBY ROOM
STREET
STREET TRASH
R LOBBY
LOBBY
R BOILER STACK
CHUTE SERVICE
VESTIBULE
MAIL ROOM
LaSalle Street
R S O O O O R
PACKAGE S
ROOM
Clark Street
O 2 O O 2 O 2
2 A
F
E P O O S O A O O P E
RESIDENTIAL STAIR DOWN STAIR DOWN RESIDENTIAL
ENTRY ENTRY
ARCADE MAIN ARCADE ARCADE
ENTRY ENTRY
ESCALATOR ESCALATOR RETAIL
RETAIL UP 88
UP
ENTRY
ENTRY
RT
1
ADAMS
STREET
ARCADE
2,812 SF
STAIR
UP
OPEN
TO
BELOW
RETAIL
RETAIL RETAIL ESCALATOR
11,200 SF RETAIL
11,150 SF ENTRY
DOWN
ENTRY
**
Adams Street
13 GROUND FLOOR PLAN The Field Building | A Living Landmark
Project is targeting a 15,000-25,000 fresh
market grocer concept across multiple levels,
enabled by significant on-site parking and
new vertical transportation
EVENT
EVENT STORAGE
UP RAMP TO L3
16.7% SLOPE SPACE
SPACE 10'-0" TO UNDERSIDE
OF RAMP
5,000 SF
5,100 SF
CORRIDOR
BOILER
R STACK
TRASH
CHUTE SERVICE
VESTIBULE
R
R S O O O O R
S
O O O A O
F
E P O O O A O O P E
S
OPEN
TO
BELOW
OPEN OPEN
TO TO
BELOW BELOW
ESCALATOR
ESCALATOR #1
ESCALATOR
DOWN
LOGGIA DOWN ESCALATOR #2
STAIR
DOWN
RETAIL
22,640 SF
28'-11"
478 SF 459 SF
542 SF 520 SF 520 SF 521 SF 557 SF SMOKE SHAFT
622 SF 597 SF 497 SF
EFF EFF
7'-6"
7'-6"
FHC
DN
599 SF 599 SF
STAIR B
UP
8'-0"
JAN.
1 BED EFF R SMOKE
STACK
TRASH
CHUTE TRASH ROOM SERVICE
VESTIBULE R EFF 1 BED
ST 2000M
847 SF 579 SF 579 SF 847 SF
R S O O O O S R
EFF EFF
645 SF O O O A O 645 SF
F
O O O A O O
S
WOMEN
MEN EXISTING
EFF EFF
8'-0"
700 SF 700 SF
DOWN DOWN
30'-5"
778 SF
UP
STAIR A 815 SF 648 SF 648 SF 807 SF
STAIR C UP
778 SF
EFF EFF
2 BED EFF 580 SF 580 SF EFF 2 BED
1,080 SF 648 SF 648 SF 1,080 SF
7'-6"
7'-6"
2 BED 1 BED 1 BED 2 BED 2 BED 1 BED 1 BED 2 BED
1,171 SF 785 SF 786 SF 1,191 SF 1,191 SF 786 SF 785 SF 1,171 SF
# Market
Unit Type % Units Average SF Total Units
Units Units
EFF
2 BR
17 Total/Average 100% 722 301 129 430 The Field Building | A Living Landmark
PROJECT COSTS AND TIMELINE
TIMELINE
SOURCE/USE % $ $/Unit •
Debt
Sponsor / 3rd Party
•
HTC
TIF •
TOTAL SOURCES 100% $258,481,510 $601,120
Land • Building open 1Q 2025
Hard Cost
•
and cultural space
•
t
ee
La s Str
Sa am
lle Ad
Str
ee
t
19 The Field Building | A Living Landmark
CONCLUSION