You are on page 1of 13

A B C D E F G H A B C D E F G H

28.00 28.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00

C1F1 C1F1 C1F1 C1F1 C1F1


C2F2 FTB2 C2F2 FTB1 FTB1 FTB1 FTB1 RB1 FB FB FB FB
1 1
CONFERENCE

FTB1

FTB1
FTB2

FTB2

+ 0.60 m ELEV.

FTB1
4.00

4.00
WF1

4.00

4.00
- + 0.60 m ELEV.

RB1

RB1
SLAB ON FILL -

FB

FB

FB

FB

FB
ROOM FS1 FS1 FS1 FS1
SLAB ON FILL + 0.60 m ELEV.
- AREA
C1F1 C1F1 C1F1 C1F1 C1F1
FTB2 FTB1 RB1 FB FB FB FB FB
2 C2F2 C2F2 2
+ 0.525 m ELEV. C1F1
-
+ 0.60 m ELEV.
SLAB ON FILL
FTB1
- SLAB ON FILL
FTB2
FTB2

FTB1

FB
4.00

4.00
3.50

4.00

4.00
RB1

RB1
FTB1
WF1
WF1 WF1 OFFICE OFFICE
WF1

FS1 FS1 FS1 FS1 FS1

FB

FB

FB

FB

FB
SLAB ON FILL AREA AREA
+ 0.60 m ELEV.
-
C1F1 C1F1 SLAB ON FILL C1F1
FTB1 FTB1 WF1 FTB1 FTB1 FTB1 FTB1 WB FB FB FB FB FB FB
3 FTB1 3
C1F1 C1F1 C1F1 C1F1 C1F1

19.00
FTB1

FTB1
FTB1
3.00

3.00
FTB1

19.00

19.00
3.00

3.00
+ 0.60 m ELEV. + 0.60 m ELEV.

WB
- + 0.60 m ELEV. SLAB ON FILL - FS1 FS1 FS1 FS1

FB

FB

FB

FB

FB
-
20.83

C1F1 C1F1
FTB1 FTB1 FTB1 FTB1 FB FB FB FB
4 4 OPEN
C1F1 C1F1 C1F1 C1F1 BELOW
WF1

SLAB
ON
SLAB ON FILL
WF1
FTB1
FTB1

FILL
FTB1

FTB1
WF1
4.00

4.00

WB

FB
4.00

4.00
FB

FB

FB
SLAB ON FILL STAIRWELL FS1 FS1 FS1
+ 0.60 m ELEV.
WF1 - + 0.60 m ELEV.
-

FTB1 FTB1 FTB1 FTB1 WB WB FB FB FB


5 5
C1F1 C1F1 C1F1 WF1
C1F1 C1F1 C1F1
+ 0.60 m ELEV.
- SLAB ON FILL
FTB1
4.00

4.00
FTB1
WF1

4.00

4.00
FTB1

FB

FB

FB

FB
SLAB ON FILL FS1 FS1 FS1

FTB1 FTB1 FTB1 FB FB FB


6 6
1.83

C1F1 C1F1 C1F1 C1F1

4.00 4.00 4.00 4.00 4.00 4.00 4.00

28.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00

28.00

FOUNDATION PLAN SECOND FLOOR FRAMING PLAN


SCALE 1:200 METERS SCALE 1:200 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC: AutoCAD by: S1 13
CONSTRUCTION OF A TWO-STOREY MARINE
PTR: FOUNDATION PLAN Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
SECOND FLOOR FRAMING PLAN

Place:
12 24
A B C D E F G H

2" X 3" WOOD PURLINS SPACED @ 600mm O.C.


29.95

2.88 1.13 2.88 2.00 2.00 2.00 2.00 2.00 2.00 2.88
A B C D E F G H
5.95
28.00
4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.93
ROOF LINE OF CONFERENCE ROOM ROOF LINE OF CONFERENCE ROOM
& OFFICE AREA & OFFICE AREA

HTRUSS 12
HTRUSS 12
RB2 RB2 RB2 RB2 RB1 RB2 RB2 RB2 RB2
1

2.88
HTRUSS 15

2.00

RB2
RB2
RB2

RB2

RB2

RB2

RB2
4.00

4.00

RB2

RB2

RB2
5

HT
HTRUSS 15 HTRUSS 12 SS HTRUSS 12

RU
RB1

TRUSS 6

TRUSS 6
RB1
RU

2.00

2.00
SS
HT

5
HTRUSS 12

TRUSS 5

TRUSS 4

TRUSS 4
RB2 RB2 RB2 RB2 RB1 RB1 RB2 HTRUSS 7 RB2 HTRUSS
RB2 6
2

5
HTRUSS 14 RB2

RB2
S
1.88

2.00
US

5
RB2
8

RB1

RB1

S
R
S

HTRUSS 9
HTRUSS 7

US
HT
US

RB2

RB2
5
RB2
RB2

RB2

RB2

RB2

RB2

RB2

TR
4.00

4.00
R HTRUSS 12

S
HT

HTRUSS 12 H
US
HT

RB2
HTRUSS 14 HTRUSS 12

TR
1.88

RU

H
8

SS

2.88
SS

HTRUSS 4
HTRUSS 13

2
RB2 RB2 RB2 RB2 RB2 RB2 RB2 HTRUSS 14 RB2 RURB2 RB2 RB2 RB2

3
T
3 H

SS
2.63
RB2 RB2

RU
HTRUSS 7 HTRUSS 7

RB2 HT
RB2

20.75
19.00

19.00

RB2

RB2

RB2
RB2

RB2

RB2

RB2

RB2

1.50 1.50 1.13


OPEN
3.00

3.00

19.88
BELOW TRUSS 3

HT

HT
HTRUSS 13

RU

RU
1.75

SS

SS
RB2 RB2 RB2 RB2 RB2 RB2
4

10

10
TRUSS 9
TRUSS 1

TRUSS 8
HTRUSS 11

RB2
1.75

RB2
10 10

TRUSS 7
SS SS

RB2
RB2

RB2

RB2

RB2

RB2
OPEN
4.00

4.00

TRUSS 7
BELOW RU RU
HT HT TRUSS 3

RB2
RB2
HTRUSS 13

2.00
HTRUSS 13
2.63
RB2 RB2 RB2 RB2 RB2 RB2 RB2 HTRUSS 7 RB2 HTRUSS 6
5 RB2 2 RB2

HT
RB2

2.00
RB2
S
US

RU
1.13
R

HTRUSS 1

SS
HT
RB2

RB2

RB2

RB2

HTRUSS 12 HTRUSS 12
4.00

4.00

2
RB2
HTRUSS 6

HTRUSS 6
HTRUSS 12

HTRUSS 12
RB2
2.88

2.88
RB2 RB2 RB2 RB2 RB2 RB2
6

4.00 4.00 4.00 4.00 4.00 4.00 4.00 2.63 1.75 2.25 1.38 2.88 2.00 2.00 2.00 2.00 2.88 1.13 2.00 2.00 2.88

28.00 29.75

ROOF BEAM PLAN ROOF FRAMING PLAN


SCALE 1:200 METERS SCALE 1:200 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE
AutoCAD by: S2 13
PTR: ROOF BEAM PLAN Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: ROOF FRAMING PLAN Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT Place:
13 24
SPACED @, 4- 0.05m., 5- 0.10m.,
6- 0.15m.,REST @ 0.20M. O.C.

FIN. FLR. LINE


A B C D E F G H

0.60 M.
29.75 N.G.L.

0.40 M.
0.80 4.15 0.80 6.25 0.80 16.15 0.80

0.80 M.
0.80

0.80
1

0.40 M.
FTB FTB

1.80 M.
7.20

8.15
2

0.70 M.
BOTHWAYS SPCD AS SHOWN
0.80

0.30 M.
3

0.80
20.75

20.75
4 ELEVATION GRAVEL BED @ 10mm thk
7.15

2.00 M.

10.20
0.50 M.
5
0.80
3.20

(FROM FOOTING TO SECOND FLOOR)


6
0.80

0.80
(FROM SECOND FLOOR TO ROOF BEAM)

5 SPCD @ 0.10, 6 SPCD@ 0.15 REST @ 0.20m O.C

2.00 M.

0.40 M.
0.80 7.20 0.80 12.15 0.80 7.20 0.80

29.75

BED BARS BOTHWAYS SPCD


AS SHOWN

ROOF PLAN
SCALE 1:200 METERS
PLAN
DETAIL OF C1F1
SCALE 1:30 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE
AutoCAD by: S3 13
PTR: ROOF PLAN Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: DETAIL OF C1F1 Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT Place:
14 24
SCHEDULE OF COLUMNS
SPACED @, 4- 0.05m., 5- 0.10m.,
6- 0.15m.,REST @ 0.20M. O.C. C1 C2
FIN. FLR. LINE
0.60 M.

0.40
N.G.L.
0.40 M.

0.50
0.80 M.
0.40 M.

FTB FTB
1.80 M.

0.95 M.

BOTHWAYS SPCD AS SHOWN


SIZE : AS SHOWN
0.25 M.

VERT BARS :
TIES :

ELEVATION GRAVEL BED @ 10mm thk

1.20 M. 0.40 0.30

0.30 M.

0.50

0.40
(FROM FOOTING TO ROOF BEAM)

5 SPCD @ 0.10, 6 SPCD@ 0.15 REST @ 0.20m O.C


0.40 M.
1.20 M.

BED BARS BOTHWAYS SPCD


AS SHOWN

SIZE : AS SHOWN SIZE : AS SHOWN


VERT BARS : VERT BARS :
TIES : TIES :
PLAN
LAT. TIES :
4 PCS SPCD AT 50mm, 5 PCS SPCD AT 100mm,
DETAIL OF C2F2
SCALE 1:30 METERS 6 PCS SPCD AT 150mm AND REST AT 200mm O.C. UP TO H/2

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE
AutoCAD by: S4 13
PTR: DETAIL OF C2F2 Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: SCHEDULE OF COLUMNS Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT Place:
15 24
0.25 0.25

0.40

0.40
0.25 0.25 0.20 0.20

0.40

0.40
@ MID - SPAN

0.40

0.40
@ SUPPORT
FTB1
@ MID - SPAN @ SUPPORT
@ MID - SPAN @ SUPPORT

0.20 0.20 WB RB2


0.40

0.40
0.30 0.30
@ MID - SPAN @ SUPPORT

FTB2

0.45

0.45
0.20 0.20

@ MID - SPAN @ SUPPORT


0.35

0.35

FB
@ MID - SPAN @ SUPPORT

RB1

SCHEDULE OF BEAMS
STEEL REINFORCEMENT ( mm )
SIZE MID. BAR
MID - SPAN SUPPORT STIRRUP REMARKS
MARK LENGTH ( mm ) ( mm )
(m) TOP BOTTOM TOP BOTTOM
FB 4.00 / 3.00 300 x 450 A
FTB1 4.00 / 3.00 250 x 400 A
FTB2 4.00 200 x 400 A
RB1 4.00 200 x 350 A
RB2 4.00 / 3.00 200 x 400 A
WB 4.00 / 3.00 250 x 400 A

STIRRUPS
- 3 PCS SPCD AT 0.05, 4 PCS SPCD AT 0.10, 6 PCS SPCD AT 0.15, AND REST SPCD AT 0.20 M O.C. UP TO MID-SPAN
- 2 PCS SPCD AT 0.05, 3 PCS SPCD AT 0.10, 5 PCS SPCD AT 0.15, AND REST SPCD AT 0.20 M O.C. UP TO MID-SPAN

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE
AutoCAD by: S5 13
PTR: Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN SCHEDULE OF BEAMS
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT Place:
16 24
L

L/4 L/4
R.C. BEAM

SECTION L/5 L/5


STIRRUP

R.C. GIRDER

TYPICAL DETAIL OF BEAM SHOWING ADDITIONAL


STIRRUPS AT THE INTERSECTION OF BEAM AND GIRDER

MID SPAN TOP BARS

EXTERIOR SPAN INTERIOR SPAN RIGHT SUPPORT TOP BARS

L1 L2 L3
B B L1/4 L1/4 L2/4 L2/4 L3/4
D

L1/5 L1/5 L2/5 L2/5 L3/5 MIDDLE BARS


( AS SPECIFIED )
@ SUPPORT @ MID-SPAN
RIGHT SUPPORT BOTTOM BARS

MID SPAN BOTTOM BARS

TYPICAL CONVENTIONAL BEAM DETAIL

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE TYPICAL DETAIL OF BEAM
AutoCAD by: S6 13
PTR: SHOWING ADDITIONAL STIRRUPS Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
TYPICAL CONVENTIONAL BEAM DETAIL
Place:
17 24
L3 L2 L1
L 2/5 L 2/5 L3/5 L3/5
B B
LEFT SUPPORT MID-SPAN RIGHT SUPPORT
TOP BARS TOP BARS TOP BARS

D
D

D
L2/4
L2/4 L3/4 L3/4
@ SUPPORT @ MID-SPAN LEFT SUPPORT RIGHT SUPPORT MID-SPAN
BOTTOM BARS MIDDLE BARS
BOTTOM BARS BOTTOM BARS
( AS SPECIFIED )

TYPICAL FOOTING TIE BEAM (FTB) DETAIL

8.48

0.30 7.88

0.30 6.38 1.50

100mm THK CONC. SLAB ON WELL


COMPACTED GRAVEL FILL. REINF.
1.45

O.C. BOTHWAYS

ENTRANCE STEPS & PWD RAMP FOUNDATION PLAN


0.30

SCALE 1:75 METERS


0.30
2.35
5.58

1.75
1.78

7.03 1.53 4.85

13.40

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE
AutoCAD by: S7 13
PTR: TYPICAL FOOTING TIE BEAM DETAIL Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
ENTRANCE STEPS & PWD RAMP
FOUNDATION PLAN
Place:
18 24
SCHEDULE OF FLOOR SLABS
R E I N F O R C E M E N T ( MM )
EXTRA BARS REMARKS
MARK THICKNESS BARS PARALLEL TO SHORT SPAN BARS PARALLEL TO LONG SPAN
( MM ) FLOOR LINE
TOP AT SUPPORT BOTTOM AT MID-SPAN TOP AT SUPPORT BOTTOM AT MID-SPAN
FLOOR BEAM
FS1 125 TWO-WAY

Y
3 SETS TIES

FLOOR HEIGHT (H2)


NOTES :
1. IN TWO- WAYS SLABS, THE BARS ALONG THE SHORT SPAN BE AT THE LOWER LAYER FOR

SPLICED
BOTTOM BARS, AND AT THE UPPER LAYER FOR TOP BARS SO THAT THE BARS ALONG SPLICING SHOULD
THE SHORTER SPAN SHALL HAVE THE BIGGER EFFECTIVE DEPTH, UNLESS OTHERWISE BE LOCATED AT
DETAILED OR NOTED DUE TO THE CONTINUITY OF BARS FROM ADJOINING SPAN.
MID-HEIGHT OF
COLUMN OR AT
1/3 OF COLUMN
2. IF THE TOP BARS REINFORCEMENT OVER A COMMON SUPPORT OF TWO ADJACENT SPAN ARE HEIGHT
DIFFERENT, THE SMALLER SPACING SHALL BE FOLLOWED OR ADAPTED ON BOTH SLAB
PANELS AT THE COMMON SUPPORT.

Y
3. BARS SHALL BE SPLICED ONLY WHERE INDICATED ON DETAILS OR AS APPROVED BY THE
STRUCTURAL ENGINEER. STRAIGHT CONTINUOUS BARS IN SLAB MAY BE SPLICED FLOOR LINE
( LAPPED OR WELDED ) AT SUPPORT FOR BOTTOM BARS AND AT MID SPAN FOR TOP BARS.
FLOOR BEAM

3 SETS TIES

Y
FLOOR HEIGHT (H1)
L2
NOTE :
L3/4 L2/4 L2/4 L3/4 " Y " - CLOSER SPACING
OF COLUMN TIES PER
TOP BARS AT SUPPORT SET AS SPECIFIED IN
THE COLUMN SCHEDULE
W2/4 W3/4

Y
FLOOR LINE

SHORT SPAN ( W )

Y
W2

Y
W1/4 W2/4

TOP BARS AT SUPPORT


ELEVATION OF TIED COLUMN
LONG SPAN ( L ) (SHOWING TIE OR HOOP SPACING)
BOTTOM BARS AT MID-SPAN

TYPICAL DETAIL OF TWO-WAY SLAB

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
CONSTRUCTION OF A TWO-STOREY MARINE SCHEDULE OF FLOOR SLABS
AutoCAD by: S8 13
PTR: Date Started: SHEET NO.
TYPICAL DETAIL OF TWO WAY SLAB
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
ELEVATION OF TIED COLUMN
Place:
19 24
0.40

4" THK. CHB W/ 12mm TRANS.BARS


3 LAYERS SPACED @ 0.30M.O.C
4"THK CHB
FIN. FLR. LINE
FIN. GRADE LINE

0.60
0.15 SPACED @ 0.30m O.C.

BOT. OF FOOTING
PLAN
0.40

4" THK. CHB


SPACED @ EVERY
3 LAYERS
FIN. FLR. LINE
FIN. GRADE LINE CORE FILLED WITH
MORTAR FOR LATERAL 12mm dia. HORIZONTAL BARS
STABILITY AND SEALANT
0.60

CEMENT PLASTER

0.15
SPACED @ 0.30m O.C.
0.15

BOT. OF FOOTING
ALTERNATE LAYING OF 4" THK.
0.40 CHB WALL @ INTERSECTION

SECTION
0.35 0.60
DETAIL OF WALL FOOTING
SCALE 1:20 METERS DETAIL OF WALL INTERSECTION
SCALE 1:10 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC: AutoCAD by: S9 13
CONSTRUCTION OF A TWO-STOREY MARINE DETAIL OF WALL FOOTING
PTR: Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN DETAIL OF WALL INTERSECTION
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT Place:
20 24
10mm dia. STIRRUPS
SPACED @ 0.15m O.C.
0.20m (min.) 0.20m (min.)
L/4
2ND FLR. FIN. FLR LN CHB WALL

0.30
0.10

0.20
1-12mm dia. VERTICAL
BARS TYPICAL
HEIGHT

STAIR LANDING

0.10
F.F.L.

WB
ELEVATION
nosing ALTERNATELY BENT-UP @ L/4

FLOOR LINE FLOOR LINE

( DOWEL )
0.40
DOWEL BARS TO
MATCH VERTICAL BARS
150MM THICKNESS
1.45

2- 12mm dia. TOP BARS

0.20
2- 12mm dia. BOTTOM BARS
250

SECTION
NTS
600

TYPICAL DETAIL OF LINTEL BEAM AT CHB WALL OPENING


STRUCTURAL DETAIL OF STAIRS SCALE 1:40 METERS
SCALE NTS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC:
STRUCTURAL DETAIL OF STAIRS
AutoCAD by: S10 13
CONSTRUCTION OF A TWO-STOREY MARINE
PTR: Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN TYPICAL DETAIL OF LINTEL
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
BEAM AT CHB WALL
OPENING
Place:
21 24
3
2.7
3
7.5
2 10.2

7.5
2
1.10
2.93

2.93
2.93
1.82

0.70 0.90 0.90 0.90 0.90 0.90 0.90 0.90 1.75 0.62 1.43 2.82 0.90 0.90 0.90 0.90 0.90 0.98
0.63 1.68 0.90 0.90 0.90 0.90 0.98
9.38 9.72
6.88

TRUSS 1 (1 UNIT)
HTRUSS 1 (1 UNIT) HTRUSS 2 (3 UNITS)

5.96
7
4.3 4.4
2
7.5
2

1.88
1.77

1.88

2.93
2.93

2.93

1.05
1.16

1.05
0.98 0.90 0.90 1.23
1.30 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 1.75 0.62 0.98 0.90 0.90 0.90 0.90 1.08
4.00
10.87 5.66

HTRUSS 3 (1 UNIT) HTRUSS 4 (1 UNIT)


TRUSS 2 (2 UNITS)

2 5.3
5.3 2
4.3
6
5.3
2
1.74
2.01

2.01

0.27

0.63 1.55 0.90 0.90 0.90 0.90 0.90 0.90 1.55 0.63 1.30 0.90 0.90 0.90 0.90 0.90 0.90 1.55 0.63

9.75 8.88

TRUSS 3 (2 UNITS) TRUSS DIAGRAM


TRUSS 4 (1 UNIT) SCALE 1:100 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: Sheet Contents: CONCEPTED by:
PRC: TRUSS DIAGRAM: AutoCAD by: S11 13
CONSTRUCTION OF A TWO-STOREY MARINE
PTR: TRUSS 1, HTRUSS 1, HTRUSS 2
Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN TRUSS 2, HTRUSS 3, HTRUSS 4
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
TRUSS 3, HTRUSS 4, TRUSS 3,
TRUSS 4 Place:
22 24
8
2.1 7.20

5.3
2

0.87
2.01

2.01
1.14
1.10 0.90 0.90 0.90 0.90 1.55 0.63 0.96 2.26 0.90 0.90 0.90 0.98

6.88 6.89

TRUSS 5 (2 UNITS) HTRUSS 5 (5 UNITS)

2.99
2.2
2
9
5.2 3
4.3

4.8

0.97
4 4

0.97
4.8
2.01

2.01

2.01

2.01

1.77
1.05

1.05
0.63 1.48 0.90 0.90 0.98 1.23 0.90 0.90 0.98 0.98 0.90 0.95 0.68 1.90 0.90 0.90 0.90 0.90 1.90 0.68
0.98 1.03
4.88 4.00 8.75
2.83
2.00

HTRUSS 6 (4 UNITS) HTRUSS 7 (5 UNITS) HTRUSS 8 (2 UNITS) HTRUSS 9 (1 UNIT) TRUSS 6 (2 UNITS)

4 1.6
2 3.8 1.6 4
3.8 2 6.48
0.65
1.77

1.77
1.77

1.12

1.70 0.90 0.90 0.90 0.90 1.70 0.96 1.56 0.90 0.90 0.90 0.98
0.60 0.90 0.90 0.60

7.00 6.19
3.00

TRUSS 7 (1 UNIT) TRUSS 8 (1 UNIT) HTRUSS 10 (4 UNITS)


TRUSS DIAGRAM
SCALE 1:100 METERS

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: CONCEPTED by:
PRC:
TRUSS DIAGRAM:
AutoCAD by: S12 13
CONSTRUCTION OF A TWO-STOREY MARINE
PTR: Date Started: SHEET NO.
MULTI-SPECIES HATCHERY BUILDING Dr. DILBERTO O. FERRAREN TRUSS 5, HTRUSS 5, HTRUSS 6
ARNEL G. AGRAVA Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN
Date: HTRUSS 7, HTRUSS 8, HTRUSS 9 Date Finished:

Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
TRUSS 6, TRUSS 7, TRUSS 8,
HTRUSS 10 Place:
23 24
8
4.7
9
3.0
2
2.8

1.77

1.05

0.92
0.63 1.28 0.98 0.68 0.98 0.98
0.68 0.93 0.90 0.90 0.98
2.88 2.63
4.38

HTRUSS 11 (1 UNIT) HTRUSS 12 (12 UNITS) HTRUSS 13 (4 UNITS)

9.08

1.43
3.10 0.90 0.98 0.78
TRUSS DIAGRAM
0.73 2.78 0.90 0.90 0.90 0.90 0.90 0.98 5.75
SCALE 1:100 METERS
8.98
HTRUSS 15 (2 UNITS)
HTRUSS 14 (3 UNITS)

2" x 6" WOOD KING POST


2" x 3" WOOD PURLINS 2" x 6" WOOD KING POST
2 - 2" x 6" WOOD 2 - 2" x 4" WOOD COLLAR PLATE 2" x 3" WOOD PURLINS
BOTTOM CHORD
RIB TYPE LONG SPAN ROOFING
B LE RIB TYPE ROOFING
RIA 2" x 4" WOOD WEB MEMBERS
VA W/ WOOD BRACES
2 - 2" x 6" WOOD
TOP CHORD
2" x 2" CEILING JOIST
WOOD FASCIA

1
4" THK. MARINE RB2
PLYWOOD

RB1 RB1 0.80


VARIABLE

TRUSS DETAIL
SCALE 1:50 METERS SPOT DETAIL OF EAVES

TIN: Design by: Project Title: Noted by: Checked by: Checked by: Conformed by: Approved by: CONCEPTED by:
PRC: TRUSS DIAGRAM: AutoCAD by: S13 13
CONSTRUCTION OF A TWO-STOREY MARINE HTRUSS 11, HTRUSS 12,
PTR: Date Started: SHEET NO.
HTRUSS 13, HTRUSS 14,
MULTI-SPECIES HATCHERY BUILDING ARNEL G. AGRAVA Dr. DILBERTO O. FERRAREN Engr. MARIO LILIO P. VALENZONA Dr. DANIEL LESLIE S. TAN Dr. EDGARDO E. TULIN HTRUSS 15
Date: Date Finished:
Place: Location: VSU Tolosa Campus, Tanghas, Tolosa, Leyte, Philippines HEAD, Office of the Planning &
Infrastructure Management VSU - Tolosa
OVPPRGAS DIRECTOR, GSD VP FOR FINANCE & ADMINISTRATION VSU PRESIDENT
TRUSS DETAIL
SPOT DETAIL OF EAVES Place:
24 24