A B C D E F G H I J K L M N

62.50

3.00 5.00 5.00 5.00 5.00 10.00 5.00 5.00 5.50 5.50 5.45 3.06

F1 F1 F1 F1 F1 CF5
F3A
C1 C1 C1 C1
TB1 TB1 TB1 TB1 TB1 TB1
1

5.00
TB1

TB1

TB1

TB1

TB1

TB1
SW3
F1A CF4
F1 F1 F1 F1 F1 F1 F1 F2
C1 C2 C2 C2 C2 C2 C2 F3A
CF3 SW2 C1 C1 C1
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
2

3.50
TB1
F3
C1
SW1
7.00

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1
7.40

CF1 CF1 CF1 CF1 CF1 CF1A CF1A CF1 CF1 CF1 CF1 CF1A
C1 C2 C2 C2 C2 C2 C2 C2 C2 C2 C2
C1
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
3
16.00

3.00

TB1

C1 F3
C1 C2 C2 C2 C2 C2 C2 C2
C1 C1 C1 C1
TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1 TB1
4
4.00
3
S-26
TB1

TB1

TB1

TB1

TB1

TB1

TB1

TB1
1.65
6.00

F1 F1
CF2 C1 CF2 C2 CF2 C2 CF2 C2 C2 C2 C2
CF2 C1 C1
TB1 TB1 TB1 TB1 TB1 TB1
6.30

4.65
C1 C1 C1 C1 C1 C1 C1
TB1 TB1 TB1 TB1 TB1
6

7.00

5.00 5.00 5.00 15.00 5.00 5.00

40.00

1 FOUNDATION PLAN
S-8 Scale 1 : 100
TRANSVERSE
REINFORCEMENT
W (SEE SCHEDULE)

SEE COLUMN
4000 psi; GRADE 60
W SCHEDULE
TIE-BEAM SCHEDULE
SEE COLUMN SIZE LONGITUDINAL REINFORCEMENT
SCHEDULE SEE COLUMN
RC SLAB SCHEDULE BOTTOM TOP
ON-GRADE REINFORCEMENT REINFORCEMENT
"B" "D" WEB STIRRUPS REMARKS
L

FFL BEAM
(WIDTH) (DEPTH) CONT. ADD. CONT. ADDITIONAL BARS
0.30 NO.
mm mm BOTTOM BOTTOM TOP TOP BARS
BARS BARS BARS
NGL
0.00 100 mm THK. "C" "D" "A" "B" "B"
COMPACTED
GRAVEL BED TB1 300 450 3 - Ø20 - 3 - Ø20 - - N.A. 1 - Ø10; 9@50mm; 11@100mm; REST @ 200mm 1 - LAYER REBAR
LONGITUDINAL

D
PLAN REINFORCEMENT TIE-BEAM
(SEE SCHEDULE)
LENGTH

L
VARIES
RC SLAB SEE COLUMN SIZE "B"

T
ON-GRADE SCHEDULE
TOP REINF. "A"
FFL

SIZE "D"
0.30 100mm THK. SECTION
COMPACTED WEB BARS
GRAVEL BASE
NGL @TOP BARS @BOTTOM BARS BOT. REINF. "C"
TRANSVERSE TRANSVERSE

SIZE "D"
0.00 100 mm THK.
COMPACTED REINFORCEMENT REINFORCEMENT
GRAVEL BED
@TOP BARS @BOTTOM BARS
TIE-BEAM LONGITUDINAL LONGITUDINAL
D

REINFORCEMENT REINFORCEMENT

L
T

PLAN
3 TYP. TIE-BEAM DETAIL (TB1)
2 TYP. COMBINED FOOTING DETAIL (CF1, CF2) S-9 Scale 1 : 50
100mm THK.
COMPACTED W S-9 Scale 1 : 50
GRAVEL BASE
SECTION
2.00 2.00
Ø25mm @ 100mm O.C Ø25mm @ 150mm O.C
1 TYP. ISOLATED FOOTING DETAIL
S-9 Scale 1 : 50 0.10 0.15

SHEAR WALL

Ø25mm @ 150mm O.C


SEE DETAIL
FOOTING SCHEDULE

Ø25mm @ 100mm O.C


RC SLAB
DIMENSION (mm) REINFORCEMENT ON-GRADE

3.00
REMARKS

0.15
BOTTOM TOP

3.50
THICKNESS LENGTH WIDTH DEPTH min. FFL
MARK
(T) (L) (W) (D) TRANS. LONG. TRANS. LONG. 0.30

0.10
F1 450 3000 3000 2500 20-20mmØ 20-20mmØ ISOLATED FOOTING NGL @TOP BARS
0.00 100 mm THK. TRANSVERSE
COMPACTED REINFORCEMENT
F1A 550 3000 3000 2500 20-25mmØ 20-25mmØ ISOLATED FOOTING GRAVEL BED
@TOP BARS
LONGITUDINAL

D
REINFORCEMENT
F2 450 3200 3200 2500 21-25mmØ 21-25mmØ ISOLATED FOOTING

Ø25mm @ 150mm O.C

Ø25mm @ 200mm O.C


F3 450 2500 2500 2500 16-20mmØ 16-20mmØ ISOLATED FOOTING
9.00

2.00

9.00

0.20

3.00

T
0.15
F3A 550 2500 2500 2500 16-20mmØ 16-20mmØ ISOLATED FOOTING

@BOTTOM BARS 2.00


CF1 550 6000 3000 2500 40-20mmØ 20-20mmØ 30-20mmØ 15-20mmØ COMBINED FOOTING TRANSVERSE
REINFORCEMENT W

CF1A 550 6000 3000 2500 40-25mmØ 20-25mmØ 30-20mmØ 15-20mmØ COMBINED FOOTING @BOTTOM BARS
LONGITUDINAL
REINFORCEMENT

Ø25mm @ 100mm O.C


CF2 450 4000 2000 2500 26-20mmØ 13-20mmØ 20-20mmØ 10-20mmØ COMBINED FOOTING

Ø25mm @ 150mm O.C


SECTION
- 3.50 -

450 --- ---


CF3 9000 2000 2500 SEE COMBINED FOOTING CF3 DETAIL COMBINED FOOTING

0.15

3.00
CF4 550 8000 3500 2500 SEE COMBINED FOOTING CF4 DETAIL COMBINED FOOTING
0.10

4 COMBINED FOOTING 3 DETAIL (CF3)


CF5 550 8000 3000 2500 SEE COMBINED FOOTING CF5 DETAIL COMBINED FOOTING
S-9 Scale 1 : 50

MF1 550 REFER MF1 FOOTING 2850 SEE MAT FOOTING MF1 DETAIL MAT FOOTING (ELEVATOR)
DETAIL
BOTTOM REINFORCEMENT TOP REINFORCEMENT
PLAN
4.00 3.00
3.50 3.50

Ø25mm @ 150mm O.C


Ø25mm @ 100mm O.C Ø25mm @ 150mm O.C
3.00 1.00
0.10 0.15
Ø25mm @ 150mm O.C Ø25mm @ 100mm O.C

0.65
0.15 0.10

Ø25mm @ 100mm O.C

Ø25mm @ 150mm O.C

0.14
SHEAR WALL
SEE DETAIL 1.00

0.10

3.00

3.00
Ø25mm @ 100mm O.C

1.65
RC SLAB

0.15
ON-GRADE

0.10
Ø25mm @ 100mm O.C
0.10

Ø25mm @ 100mm O.C


FFL
0.30

1.00
@TOP BARS

1.00
NGL

0.10
TRANSVERSE
0.00 100 mm THK.

Ø25mm @ 150mm O.C

Ø25mm @ 200mm O.C


REINFORCEMENT
COMPACTED
GRAVEL BED @TOP BARS
LONGITUDINAL

0.20

6.30
D
REINFORCEMENT
8.00

0.15

2.00

8.00

2.00

Ø25mm @ 150mm O.C


0.15

4.65
T

3.65
- -
--- ---
Ø25mm @ 100mm O.C

Ø25mm @ 150mm O.C


@BOTTOM BARS 3.50
TRANSVERSE
REINFORCEMENT W
3.00

3.00
@BOTTOM BARS
0.10

LONGITUDINAL

0.15
REINFORCEMENT SECTION

0.15

2.00
Ø25mm @ 150mm O.C
7.00
BOTTOM REINFORCEMENT TOP REINFORCEMENT
1 COMBINED FOOTING 4 DETAIL (CF4) BOTTOM REINFORCEMENT
PLAN
S-10 Scale 1 : 50

3.00 3.00

Ø25mm @ 200mm O.C


Ø25mm @ 100mm O.C Ø25mm @ 150mm O.C 4.00 3.00

0.10 0.15 3.00 1.00

0.65
Ø25mm @ 200mm O.C Ø25mm @ 150mm O.C

0.21 0.15
Ø25mm @ 100mm O.C

Ø25mm @ 150mm O.C

0.20
SHEAR WALL
SEE DETAIL 1.00
0.10

1.65
3.00

3.00

Ø25mm @ 150mm O.C


RC SLAB
0.15

ON-GRADE
0.15

0.15

Ø25mm @ 150mm O.C


FFL

Ø25mm @ 150mm O.C


0.30

0.15

1.00
NGL @TOP BARS

1.00
TRANSVERSE
0.00 100 mm THK.
Ø25mm @ 150mm O.C

Ø25mm @ 200mm O.C

REINFORCEMENT
COMPACTED
GRAVEL BED @TOP BARS

6.30
LONGITUDINAL

D
REINFORCEMENT
8.00

0.15

2.00

8.00

2.00
0.20

Ø25mm @ 200mm O.C

4.65
T

3.65
0.20
Ø25mm @ 100mm O.C

Ø25mm @ 150mm O.C

- - @BOTTOM BARS 3.00


--- --- TRANSVERSE
REINFORCEMENT W
3.00

3.00

@BOTTOM BARS
0.15

LONGITUDINAL
0.10

REINFORCEMENT SECTION
0.21

2.00
2 COMBINED FOOTING 5 DETAIL (CF5) 3 MAT FOOTING DETAIL (MF1)
Ø25mm @ 200mm O.C
S-10 Scale 1 : 50 S-10 Scale 1 : 50 7.00
BOTTOM REINFORCEMENT TOP REINFORCEMENT
PLAN TOP REINFORCEMENT
A B C D E F G H I J K L M N

62.50

3.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.50 5.50 5.50 3.00

C1 C1 C1 C1

1
WF WF WF WF WF WF WF WF

WF WF WF WF WF WF
WF

5.00
WF WF WF WF WF

SW3
WF

UP
WF WF

8.50
C1 C2 C2 C2 C2 C2 C2
WF WF WF WF WF C1 C1 C1
SW2
2
WF 100mm THK. RC SLAB
ON-FILL w/ 10mmØ
REBARS SPACED@

3.50
WF 500mm O.C. BOTHWAYS
WF WF WF WF WF WF
WF WF C1
SW1
7.00

UP
WF WF
WF
WF WF WF WF WF

C1 C2 C2 C2 C2 C2 WF C2 C2 C2 C2 C2
WF WF C1
WF
3
WF WF
17.00

3.00

WF WF WF
C1 C1 WF C2 WF C2 C2 C2 C2 C2 C2
C1 C1 C1 C1
WF WF WF WF WF
4
WF WF
WF

WF WF
WF
5.00

WF WF WF

WF
C1 C2 C2 C2 C2 C2 C2
WF WF WF WF C1 C1
UP
5
2.00

C1 C1 C1 C1 C1 C1 C1

5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.50 5.50 5.50

56.50

1 WALL FOOTING PLAN


S-11 Scale 1 : 100
COLUMN SCHEDULE (CONCRETE: 4000 psi)

150mm THK.
C1 C2 C1 C2 C3 (PLANTED COLUMN)
CHB WALL W/ 0.30
12mm THK. 0.40 0.40 0.40
PLASTER FINISH
100 mm THK.
RC SLAB-ON-GRADE
12mmØ VERT. 5TH FLOOR ROOF DECK

0.70

0.70

0.70
BARS SPACED TO TO

0.60
@ 400mm O.C. 100 mm THK. ROOF DECK ROOF BEAM
GRAVEL BED
12mmØ
HOR. BARS
@ EVERY
2 LAYERS OF CHB F.F.L.
SIZE (mm) 400 X 700 400 X 700 SIZE (mm) 400 X 700 300 X 600
VERT. REINF. 16-20 mm Ø G60 16-20 mm Ø G60 VERT. REINF. 16-20 mm Ø G60 12-20 mm Ø G60
TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (5 PER SET) REST @ 150mm O.C. TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (3 PER SET) REST @ 150mm O.C.

0.30
CONFIN. REINF. (B) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C. CONFIN. REINF. (B) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (3 PER SET) @ 100mm O.C.
JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C. JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (3 PER SET) @ 100mm O.C.

N.G.L. 0.40 0.40

3-12mmØ
0.60

LONGITUDINAL
BARS 4TH FLOOR 0.10 B
0.80

0.70

0.70
TO ROOF DECK
12mmØ TRANSV. 5TH FLOOR
BARS SPACED @ 17.30 C
300mm O.C.
0.10 B=500mm
100 mm THK.
0.20

GRAVEL BED
SIZE (mm) 400 X 700 400 X 700

0.15
A
VERT. REINF. 16-20 mm Ø G60 16-20 mm Ø G60
0.60 TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (5 PER SET) REST @ 150mm O.C.
CONFIN. REINF. (B) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C. 0.10
5TH FLOOR LEVEL B=500mm
JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C.
13.90 C
1 TYP. WALL FOOTING DETAIL (WF)
0.40 0.40 0.10 B=500mm
S-12 Scale 1 : 15 NOTE:

SHALL BE STAGGERED
. BARS
SPLICES OF MAIN VERTICAL

600mm MIN
ADJACENT LAP
BARS SHOULD NOT BE
3RD FLOOR MORE THAN 33% AT ANY 1.00
ONE LOCATION A
0.70

0.70
TO
4TH FLOOR 0.15

4TH FLOOR LEVEL 0.10 B=500mm

10.50 C

SIZE (mm) 400 X 700 400 X 700 0.10 B=500mm


VERT. REINF. 16-20 mm Ø G60 16-20 mm Ø G60
TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (5 PER SET) REST @ 150mm O.C.
0.15
10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C. A
CONFIN. REINF. (B)
JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C.

3RD FLOOR LEVEL 0.10 B=500mm


0.40 0.40
7.10 C
2ND FLOOR 0.10 B=500mm
NOTE:

SHALL BE STAGGERED
. BARS
TO
SPLICES OF MAIN VERTICAL
0.70

0.70

3RD FLOOR

600mm MIN
ADJACENT LAP
BARS SHOULD NOT BE
MORE THAN 33% AT ANY 1.00
ONE LOCATION A

0.15

SIZE (mm) 400 X 700 400 X 700 2ND FLR. LEVEL 0.10 B=500mm

VERT. REINF. 16-20 mm Ø G60 16-20 mm Ø G60 3.70 C


TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 0.10 B=500mm
CONFIN. REINF. (B) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C.
JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C.
0.15 A
0.40 0.40

1st FLR. LEVEL 0.10 B=500mm

0.30
0.70

0.70

FOOTING
TO
2ND FLOOR 0.10
NEW N.G.L.
B
0.00

SIZE (mm) 400 X 700 400 X 700


VERT. REINF. 16-20 mm Ø G60 16-20 mm Ø G60
TIES (A) 10mmØ TIES (5 PER SET) REST @ 150mm O.C. 10mmØ TIES (5 PER SET) REST @ 150mm O.C.
CONFIN. REINF. (B) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C.
JOINT. REINF. (C) 10mmØ TIES (5 PER SET) @ 100mm O.C. 10mmØ TIES (5 PER SET) @ 100mm O.C. 2 TYP. COLUMN DETAIL
S-12 Scale 1 : 75