GRIDLINE
TB2
AT GRIDS 1 AND 6
LINE OF SYMMETRY GRIDLINE
B
TB2 TB2
GRIDLINE
1 FOUNDATION PLAN (8) 16mmØ VERTICAL
REINFORCEMENT BAR
(2) 10mmØ TIES
S-1 SCALE 1 : 200MTS.
100mmTHK. CONC. SLAB 1 @ 50mm, REST @ 150mm
REINF.W/ 10mmØ DSB
SPACED @ 1.0M O.C.
PROVIDED BOTHWAYS
N.G.L.
TB2
4 TIE-BEAM SECTION 1
S-1 SCALE 1 : 25MTS. 5 TIE-BEAM SECTION 2
S-1 SCALE 1 : 25MTS.
T
STA E UN ENGINEER LICENSE NO. PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: REVISION: R0 SHEET NO.
N 1924 I
O
VE
1
BUK IDN
S
COMPLETION OF COVERED COURT JJC, JDC
PTR NO. : 1908276
DATE : 01-14-2022 (MALITBOG CAMPUS) DATE DRAWN:
RUTHCELLE A. BACTALAN, RCE ROSANNA S. GENERATO MR. DANTE S. VICTORIA JR. DR. OSCAR B. CABAÑELEZ FEB. 23, 2022
2
N
CIT
NO
K OF
BU MA L A RESIDENT ENGINEER CHIEF ADMINISTRATIVE OFFICER VICE PRESIDENT FOR ADMINISTRATION, BukSU PRESIDENT CHECKED BY:
Y BA LAY , TIN: 914 508 236 000 LOCATION: BukSU MALITBOG CAMPUS, MALITBOG, BUKIDNON PLANNING AND DEVELOPMENT AR. JASON C. CERIALES, uap