You are on page 1of 1

1 2 3 4 5 6 GRIDLINE

GRIDLINE

FC1 FC1 FC1 FC1 FC1 FC1


TB1 TB1 TB1 TB1 TB1
A
D B D B
TB1

TB2

AT GRIDS 1 AND 6
LINE OF SYMMETRY GRIDLINE

B
TB2 TB2

2 FC1 & PEDESTAL DETAILS TB1 TB1


S-1 SCALE 1 : 40MTS.

FC1 FC1 FC1 FC1 FC1 FC1


C BETWEEN GRIDS 2 TO 5
TB1 TB1 TB1 TB1 TB1
3 TIE-BEAM DETAIL
S-1 SCALE 1 : 40MTS.

GRIDLINE
1 FOUNDATION PLAN (8) 16mmØ VERTICAL
REINFORCEMENT BAR
(2) 10mmØ TIES
S-1 SCALE 1 : 200MTS.
100mmTHK. CONC. SLAB 1 @ 50mm, REST @ 150mm
REINF.W/ 10mmØ DSB
SPACED @ 1.0M O.C.
PROVIDED BOTHWAYS

N.G.L.

COMPACTED GRAVEL BEDDING


COMPACTED GRANULAR TB1 (1) 10mmØ TIES, 1 @ 50mm, 4 @100mm
FILLING MATERIALS 4 @ 150mm, REST @ 200mm
TB2 (1) 10mmØ TIES, 1 @ 50mm, 10 @100mm
10 @ 150mm, REST @ 200mm

COMPACTED GRAVEL BEDDING

TB2

TB1 COMPACTED GRAVEL BEDDING 11 - 16mmØ RSB


PROVIDED BOTHWAYS

4 TIE-BEAM SECTION 1
S-1 SCALE 1 : 25MTS. 5 TIE-BEAM SECTION 2
S-1 SCALE 1 : 25MTS.

T
STA E UN ENGINEER LICENSE NO. PROJECT TITLE: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: REVISION: R0 SHEET NO.
N 1924 I
O

VE

1
BUK IDN

PRC REG. NO. : 104273 DRAFTED BY:


RS ITY

S
COMPLETION OF COVERED COURT JJC, JDC
PTR NO. : 1908276
DATE : 01-14-2022 (MALITBOG CAMPUS) DATE DRAWN:
RUTHCELLE A. BACTALAN, RCE ROSANNA S. GENERATO MR. DANTE S. VICTORIA JR. DR. OSCAR B. CABAÑELEZ FEB. 23, 2022
2
N

CIT
NO

PLACE: MALAYBALAY CITY


ID

K OF
BU MA L A RESIDENT ENGINEER CHIEF ADMINISTRATIVE OFFICER VICE PRESIDENT FOR ADMINISTRATION, BukSU PRESIDENT CHECKED BY:
Y BA LAY , TIN: 914 508 236 000 LOCATION: BukSU MALITBOG CAMPUS, MALITBOG, BUKIDNON PLANNING AND DEVELOPMENT AR. JASON C. CERIALES, uap

You might also like