Low Ht Storage Betwn Bunker

2 Unit - Sqmt.
Beds 1200X900X450
Nos Unit Qty Rate Amount Rs.

1 6mm Backing Ply 1 SMT 1.08 430.40 464.83


2 19mm Side Ply
Door 1 SMT 1.08 1269.68 1371.25
Sides 3 SMT 0.41 1269.68 1542.66
Top, Bottom and Self 5 SMT 0.54 1269.68 3428.14
3 Laminate on in Sides
6mm Backing Ply 2 SMT 1.08 208.26 449.84
19mm Side Ply
Door 1 SMT 1.08 201.75 217.89
Sides 4 SMT 0.41 201.75 326.84
Top, Bottom and Self 8 SMT 0.41 201.75 653.67
Laminate on Both Sides
Door 1 SMT 1.08 546.41 590.12
Sides 2 SMT 0.41 546.41 442.59
Top, Bottom and Self 1 SMT 0.54 546.41 295.06

4 Bidding Patti 1 RMT 55.00 10.00 550.00


5 Polish 1 RMT 55.00 10.00 550.00
6 Labour 1 Nos 1.00 5229.36 5229.36
7 Material hardwer 1 Misc 1.00 2000.00 2000.00

Profit 15% 2716.84

Round off 20,829.08 24

Low Ht Storage Betwn Bunker


2 Unit - Sqmt.
Beds 1200X900X450
Nos Unit Qty Rate Amount Rs.

1 6mm Backing Ply 1 SMT 1.08 322.80 348.62


2 19mm Side Ply
Door 1 SMT 1.08 622.14 671.91
Sides 3 SMT 0.41 622.14 755.90
Top, Bottom and Self 5 SMT 0.54 622.14 1679.79
3 Laminate on in Sides
6mm Backing Ply 2 SMT 1.08 208.26 449.84
19mm Side Ply
Door 1 SMT 1.08 201.75 217.89
Sides 4 SMT 0.41 201.75 326.84
Top, Bottom and Self 8 SMT 0.41 201.75 653.67
Laminate on Both Sides
Door 1 SMT 1.08 546.41 590.12
Sides 2 SMT 0.41 546.41 442.59
Top, Bottom and Self 1 SMT 0.54 546.41 295.06

4 Bidding Patti 1 RMT 55.00 10.00 550.00


5 Polish 1 RMT 55.00 10.00 550.00
6 Labour 1 Nos 1.00 3486.24 3486.24
7 Material hardwer 1 Misc 1.00 2000.00 2000.00

Profit 15% 1952.77

Round off 14,971.24 24


736.41

499,897.91 19,286.18 1,792.40

736.41
359,309.74 13,862.26 1,288.31