750 mbar (P x 1.25)
600 mbar (P ) g
300 mbar (P g / 2)
Timing of Test: 1 Day for start to Satage 5 1 day for Stage 5 to Stage 11 6 day for Stage 11 1 day for Stage 12 to end of test
Stage 1: Stage 8:
Air shall be injected slowly into the tank until 138 mbar. A solution film shall be applied to Air shall be injected slowly to test when the PSV shall start to release air. (API 7.18.3.4)
all joints in the tank wall above the high liquid (capacity) design level. (API 7.18.2.6)
Stage 9:
Stage 2: Make last preparation for dewatering system to create vacuum, such as manometers, drain connections etc. The
Air shall be injected slowly into the tank until 300 mbar, the pressure in the vapor space is vacuum-relief valve must be set to open at a partial vacuum closer to the external atmospheric pressure than the partial
about one-half of the pressure Pg. (API 7.18.3.2) vacuum for which the tank is designed. The partial vacuum in the tank should never exceed the design value. It is setted
for -4 mbar. (API 7.18.5.1)
Stage 3:
After reached the maximum test pressure 750 mbar (1.25 times Pg), the tank shall be held Stage 10:
with this pressure at least one hour. (API 7.18.3.4) Withdrawal of water from the tank to create vacuum until -4mbar and when the PRV shall start to open. (API 7.18.5.1)