Schedule of Parameters of the Service Reservoir Tank (RCC - Circular)

Name of Project : Phidim Water Supply Project Scheme-2

Tank Radius of the Tank Thickness of the Tank Depth of the Tank Footing of the Tank
Capacity
1 in Cu.m. R1 R2 R3 R4 R5 R6 Ts Tp Db Dt Wt Wd FB Dh B D h H1 S (%) H2 F1 F2 F3 F4
2 1 2 3 4
3 50 2.50 2.65 2.89 2.96 3.11 3.26 0.20 0.10 0.21 0.10 0.15 2.60 0.40 1.50 0.15 0.15 0.90 1.00 10.00 1.67
4 75 3.05 3.20 3.44 3.54 3.69 3.84 0.20 0.10 0.24 0.10 0.15 2.60 0.40 1.50 0.15 0.15 0.90 1.00 10.00 1.73
5 100 3.50 3.65 3.92 4.02 4.17 4.32 0.30 0.10 0.27 0.10 0.15 2.60 0.40 1.50 0.15 0.15 0.90 1.00 10.00 1.79 0.27 0.10 0.15 0.45
6 150 4.30 4.45 4.78 4.88 5.03 5.18 0.30 0.10 0.33 0.10 0.15 2.60 0.40 1.50 0.20 0.21 0.90 1.00 10.00 1.88
7 200 4.95 5.10 5.47 5.57 5.72 5.87 0.30 0.15 0.37 0.10 0.15 2.60 0.40 1.50 0.25 0.25 0.90 1.00 10.00 1.96
8 300 5.70 5.90 6.35 6.45 6.60 6.75 0.30 0.15 0.45 0.10 0.20 3.00 0.50 1.75 0.25 0.33 1.05 1.00 10.00 2.06
9 400 6.35 6.55 7.05 7.15 7.30 7.45 0.30 0.15 0.50 0.10 0.20 3.20 0.50 1.82 0.30 0.35 1.11 1.00 10.00 2.13
10 600 7.40 7.65 8.26 8.36 8.51 8.66 0.30 0.15 0.61 0.10 0.25 3.50 0.60 2.05 0.38 0.38 1.23 1.00 10.00 2.27
11 800 8.55 8.80 9.50 9.60 9.75 9.90 0.35 0.15 0.70 0.10 0.25 3.50 0.60 2.05 0.48 0.48 1.23 1.00 10.00 2.41
12 1000 9.55 9.85 10.63 10.73 10.88 11.03 0.35 0.15 0.78 0.10 0.30 3.50 0.70 2.10 0.56 0.56 1.26 1.00 10.00 2.53