You are on page 1of 63
VINCI “ Qacciona Title: Similar Contracts SIMILIAR CONTRACTS OF BIDDER Package: Geotechnical Investigations Services Dated 15" July, 2019 Bidder: Construction Corporation No.1 — JSC (CC1) Effective! Finish INo.| Project | The Owner | Scope of works bea ohn date of | date of ¢ Contraet| Contract ‘an Phong I ' BOT Tneemal boa — es stigation & 1 Power Plan see spibecisadiae 12,635,900,000. | 02/2019 | 12/2019 {company [Topographic (soomwx = fey a Pit) imi urvey worl TTC No.02 iat (Investigation Solar Power [PTC Green Value: c 2 bproject iEnergy JSC ro civ | 209844,700) 99/2018 | 02/2019 S50MWac) : 142,462,808,822 works TTC No.01 (investigation Solar Power [ITC Green Value: 5 Project [Energy JSC Pe val Civil | _907:949,955) DARREN | SERS (48MWac) ee 212,05 1,083,564 works (Site Development] Krongpa Solar |... ne OF Gia Lai General Civil value: ° 2 : Cow IElectricity SCWworks 30,669,879,129) | 04/2018 | 10/2018 151,223,515,478 /a» Package: Geotechnical Investigations Services 4 \ Title: Financial Situation ow VAN PHONG 1 BOT THERMAL POWER PLAN Subcontract for Soil Investigation and Topographic Survey Work of Van Phong 1 BOT Thermal Power Plant Project Between Doosan Heavy Industries and Construction Co., Ltd. And Construction Corporation NO.1 JSC 13 ae SUBCONTRACT AGREEMENT ‘This SUBCONTRACT [Subcontract No. DHIC-VP1-CB-01(Rev.0)] is made on February 11, 2019] (Effective Date") between: (1) Doosan Heavy Industries and Construction Co., Ltd., a company duly organized and existing under the laws of the Socialist Republic of Vieinam, with its registered office at Van Phong 1 BOT Thermal Power Plant Project in Van Phong Economic Zone, Ninh Phuoe ‘Commune, Ninh Hoa Town, Khanh Hoa Province, the Socialist Republic of Vietnam (the “Contractor’); and (2) Gonstruction Corporation No.1 JSC, a company duly organized and existing under the laws of the Socialist Republic of Vietnam, with its registered office at 8",0" floor, Salling Tower 111A Pasteur, Ben Nghe Ward, District 1, HCMC, the Socialist Republic of Vietnam (the “Subcontractor’) ‘The price of this Subcontract is 12,638,900,000 VND (Twelve Billion, Six Hundred Thirty Five Million Nine Hundred Thousand Vietnam Dong only) based on re-measurement price in consideration of the Subcontractor’s implementation of all the Works according to the Subcontract The period of this Subcontract is from the Effective Date to Final Completion Date (Expected December 31, 2019) and the Guaranteed Completion Date of the Work is December 31, 2019. “The Warranty Reried forthe Wotks-for the warranties-shall-commence-at-the Substantial Completion Date (Expected December 34,2018). WITNESSETH WHEREAS, the Subcontractor, afler reviewing and understanding the complete description of the requirements of the Contractor stated in this Subcontract, has assured that it has full capabilities and capacities required to complete the Works without any problem in every aspect of the Works including but not necessarily limited to manpower, factities and know-how, financial abilities, and has expressed ils desire and preparedness (0 carry out all the required Works as requested in this ‘Subcontract in strict compliance with the torms and conditions, and all of the appendices in this ‘Subcontract as well as the Contract specifications between the Owner and the Contractor including but ‘not necessarily limited to the Owner's drawings relevant to this Subcontract 213 By NOW THEREFORE, in consideration of the premises and mutual understandings, both Parties have hereto entered into this Subcontract as per tho provisions hereinafter described in the terms and conditions of this Subcontract IN WITNESS WHEREOF, the Parties have hereunder set their respective signatories to be executed on the date and year first above written, For and on behalf of Contractor: For and on behalf of Subcontractor: aetna ae fA Doosan Heavy Industries Name: Mr- Nguyen Due Dung ilo: Deputy Genera Director ‘This Subcontract Agreement is formed together with the documents listed below, 1. Part A: Special Terms and Conditions Part B : General Terms and Conditions Part G : Appendices Appendix A: Special Requirement forthe Site Work Appendix B : Scope of Work Appendix G : Bill of Quantities and Price Breakdown Schedule Aopendix D : Construction Schedule - Appendix E : Drawings and Technical Specifications Appendix F : Doosan EHS Requirements ~ Appendix G : Doosan Quality Requirements ~ Appendix H : Non-lisclosure Agreement ~ Appendix! : Form of Bonds: = Aopendix J: First Class Bank Listin the Country 3/8 Package: Geotechnical Investigations Services Title: Financial Situation {acciona TTC NO.2 SOLAR POWER PROJECT (EA uG6 Viernam Go., t7d. Uni 1709, 17, Keangna Fano! Londo Tower Lote eau Gay Now Uber Aen, Ale Ta Ware, No Tu Lem Ost, Hon “et 84a) 37949320 Fae #844) 3708 0522 msi oatetae6aD PURCHASE ORDER ob con G8 400000 crete. | evosnrsnooanta ‘ORDER TO MESSRS: Mr. Le Huu Viet Duc ~ General (Job Code Dirootor ‘Order N | CONSTRUCTION CORPORATION NUMBER 1 - JSC (C1) Issue Date | Address: 111A, Pastour, Ben Nghe Ward, Distt 1, Ho Chi Es = ‘Minh City “Total Amount 62: 62,390,375 “Tel: (+84) 003803681 Fax: (+648) 39290500 Manufacturer: NIA a Saal Path varIo% ‘ORDERED ITEM: SITE INVESTIGATION WORK | oterar Construction Corporation Number 1 - JSC (hereinafter caled “CONTRAGTOR’) is requested to supply the following works. (hereinaiter called the "Works") andlor services on the terms and conditions indicated in this Purchase Order. JGC Vietnam, Co.,Ltd. ¢hereinafter called “JVO") poe Tre No,02 Solar Power Plant Project Final Delivery Date | 10-Aug-2018 Reauion No. ya Proposal No Trade Terms Ryosuke Hoshijima GC Vietnam Co,, Ltd Unit 1709, 17F, Keangnam Hanoi Landmark Tower, Lot ES Cau Giay New Urban Area, Me Tri Ward, ‘Address of Involee am Tu Liem Distt, Hane! Torms of Paymont | Seo Note item No.1 | Other Conditions (¥) | CONTRACTOR shall nol assign or pledge this Order or any pari hereof or any amounts due thereunder without prior writen consent of JV Other Conditions (2) | See Note Remark: (1) Please confirm your acceptance of this Purchase Order by signing the attached Acceptance of Purchase Order ang returning to us. 2) The Order No. and item No. must appear on all correspondence. Dy. @)_ Applicable documents to the Order are shown inthe“ NOTE off Buchs Order Form ic we ua Goneral Director ESA UGE Vietnam Go., Ltd. ACKNOWLEDGEMENT AND ACCEPTANCE OF ORDER Vendor: CONSTRUCTION CORPORATION NUMBER 1-J8C (6¢1) Attention: — Mr. Le Huu Viet Duc J General Director Address: ‘111A, Pastour, Ban Nghe Ward, District 1, Ho ‘Chi Minn City. | Telephone number: Fax numbe ‘Order Item: SITE INVESTIGATION WORK To: JGC Vietnam Co., Ltd. Sheet No, | Job Code | c-vose-so-an00 Requisition No | NIA CONTRACTOR’s Quotation Rev? ProposalNo | sent via email dated: 19-Jul-2018, ‘Order No. G-VO046-P-5800-001-A PO Issue Date | 20" Jul 2018 * Note: Within 03 days from PO received date, this form shall be confirmed acceptance with signature and return to GC Vietnam Co, Lid by fax. Unit 1709, 17F, Keangnam Hanol Landmark Tower, Lot E6 Cau Giay New Urban Area, Mo Tri Ward, Nam Tu Liom District, Hanol, Vietnam Tol: (#84) 511 3707 425 Fax: (#84) 511 3826 604 Attn: Nobuaki Hoshino - General Director - CONSTRUCTION CORPORATION NUMBER 1 - JSC (CC1) is in receipt of the order as contained in the attached purchase order No; G-V046-P-5800-001-A - Hereby return the form with stamp and signature, CONSTRUCTION CORPORATION NUMBER 1 - J§C {CC1) confirm acceptance to implement fully and on time all scope of work mentioned on the Purchate order. ACCEPTANCE Date By Name Title Signature Stamp 3VS-F-200-0008 Rev.2 AE UGC Vietnam Go., Ltd. ACKNOWLEDGEMENT AND ACCEPTANCE OF ORDER AMENDMENT No.01 Sheet No. Job Code @-Vo46-40-0000 Vendor: CONSTRUCTION CORPORATION NUMBER 1-486 (601) Requisition No | NIA Attention: Mr. Le Huu Viet Duc General Director = CONTRACTOR’s Quotation Rov2 sent via email dated: 19-Jul-2018. = Monthly Progress Report approved by JVC's Site Manager ‘Address: Proposal No 111A, Pastour, Bon Nghe Ward, District 1, Ho Chi Minh Ciy. eo Otter No. G-V046-P-5800-001-A ‘Amendment r er ‘Telephone number: 26" October 2018 [Faenumber Issue Date z (Order tem: * Note: Within 03 days from PO received date, this form shall bo contizmed acceptance with signature and return to SITE INVESTIGATION WORK IGE Vietnam Co, Ltd by fax. To: JGC Vietnam Co., Ltd. Address: Unit 1709, 17F, Keangnam Hanoi Landmark Tower, Lot E6 Cau Giay New Urban Area, Me Tri Ward, Nam Tu Liom District, Hanol, Vietnam Tet: (#84) 511 3707 425 Fax: (+84) 511 3826 604 Attn: Nobuaki Hoshino - General Director - CONSTRUCTION CORPORATION NUMBER 1 - JSC (CC1) is in receipt of the order as contained in the ‘attached Amendment No.01 of Purchase Order No: G-V046-P-5800-001-A = Hereby return the form with stamp and signature, CONSTRUCTION CORPORATION NUMBER 4 - JSC (CC1) confirm accaptance to implement fully and on time all scope of work mentioned on the ‘Amendment. ACCEPTANCE Date By Name an signature NY Stamp TL. TONG GIAM DOC JNS-f-200-0008 Rev.2. ravine PHOwG QUAN LY DU AN 1 Cuin Ci Keén LuGG Vietnam Go., Lid. Oh 1709.17. Reangam ae ander Tower tales au Gey Rew ison Aon eT PURCHASE ORDER | rie far Tu Lam Bate Hove SEND RENT | @ricoa Tel. +84(4) 3794-0520 Fax ¥64(4) 378 822 (Amendment No, :04) Sheet No.1 of 2 sr. 0302149650 I | Job Code. G-v048-40-0000_ Diroctor Minh City ORDER TO MESSRS: Mr. Le Huw Viet Due — General CONSTRUCTION CORPORATION NUMBER 1 - JSC (C1) ‘Address: 111A, Pasteur, Ben Nghe Ward, Distt 1, Ho Chi re cages | Ta ease ‘Amendment Issue Date: 28" October 2018 Total Addition: 47,773,260 without VAT1O% Balance of Cons. Tax “Toll Deduction Batence : : Fe Previous Toalamauit’ | -628808,760| Curent Total Aunt 641.67,000 ‘Construction Corporation Number 1 - JSC (hereinafter called “CONTRACTOR? is requested to supply the following works, (hereinafter called the "Works") and/or services on the terms and conditions indicated In this Purchase Order. JGC vata Co,, Lid. (hereinafier called "JVC") i ‘Current Total Con. Tax 467.700, ORDERED ITEM: SITE INVESTIGATION WORKS “Total VATIO% curent | co Grand Tota 1 70 (included 10% VAT) Feast, 00 cones CHEE Project "TTC No.02 Solar Power Plant Projec “Final Delivery Dale | 10-Aug-2 | inspect Address of Invoice Requstion No. yg ~~) CONTRACTOR's Guotaion Reve sen vie ema dated O-Jul20%8 : Propoea No Monty Progress Report approved by JVC's Site Manager Hiede Teme [Na ee = = Ir. Ryosuke Hoshijima IGC Vietnam Co., Lid, Unit 1709, 17F, Keangnam Hanoi Landmark Tower, Lot E6 Cau Giay New Urban Area, Me Tri Ward, Nam Tu Liem District, Hanoi Remark: [Other Conditions (@) | See Note ‘Seo Note ltam No.1 Eee CONTRACTOR shall not assign or pledge this Order or any part hereof or any amounts due hereunder without prior written consent of JVC. ee (1) This Amendment No.1 of the Purchase Order shall be valid from the date of Acknowedgement and Acceptance of ‘Amendment with stamp and signature of CC1 @2)_Thi Amendment No.1 ofthe Purchase Orde shal be mado into (2) dupcate copies wth te same egal value, CC4 shall keep one (1) copy and the remaining one (1) copy shall be kept by JVC. ons eeu Nobuaki Hoshino General Director L1VS.6-200:000 Rev 1 VINCI oo A Xie Package: Geotechnical Investigations Services | , q ‘acciona Title: Financial Situation Ne TTC NO.1 SOLAR POWER PROJECT EEO UGG Vietnam Go. Lid, ‘Unit 1708, 17, Keangnam Hanoi Lander Tower, {ot E® Cau Gay New Urban Aa, eT War Nam Tu em Geta ane eee Tel v54ia So4-0820, Fax *84(4) 3794-0522 (Priced) lust ogoeseee20 é ‘Sheet No.1 of 5 PURCHASE ORDER Job Code : G-V032-20-0000 Order Wo, | ORDER TO MESSRS: Mr. Le Huu Viet Due - General Director ‘Job Gade | 6-V032-40-0000 - CONSTRUCTION CORPORATION NUMBER 1 - JSC (C1) ‘Order No, | G-V032-P-3100-002.8 Aadress: 1114, Pastour, Sen Nghe Ward, District 1, He Chi Minn Issue Date | 14 July 2018 Cty, = (Total Amount — Tel (+24) soae03se1 without VATION Fax (+848) 29290500 VAT 10% Manufacturer: NIA Ta Raa ORDEREDITEM: —_SiTE NVESTIORTION WORK SO VATIOS SEED Construction Corporation Number 1 - JSC (hereinafter called ‘CONTRACTOR’? is requested to supply the following works (herennatter called the "Works" andlor services on the terms and conditions indicated in tis Purchase Order. JGC Vietnam Co, Ltd. (hereinafter called SVC") Pole ‘TTC No.01 Solar Power Plant Project Final Delivery Date P39 juiy.2018 Inspection ‘See Note ltem No.6 Requstion Neg Miata CONTRACTOR’s Quotation Ref 645 TCTIQLDAt dated 09 May 2018 ‘Trade Terms NA Mir, Ryosuke Hoshijima GC Vieinam Go., Lid ‘Address of tnvice | Ui 1708, 7 Kesngnam Hanc Landmark Tower, Lol ES Cau Giay New Liban Ae, Me T War Terms of Payment | See Note Item No.1 ‘Other Conditions (7) | CONTRACTOR shall noi assign oF pledge this Order or any part hereof or any amounts due hereunder without prior written consent of JVC Other Conditions (2) | See Note Remark: (1) Please confirm your acceptance of this Purchase Order by signing the altached Acceptance of Purchase Order and retuming it tous, (2) The Order No. and Item No, must appear on all correspondence. (@) Applicable documents tothe Order are shown in the "NOTE" of this Pur JNS-F-200-0001 Rev 4 ET UGG Vietnam Go, Li. UOnL709, 17, Keangnam Hanol Lander Tower, Lot ES Cou Gay Non Urban Aves, Me TH Wad, Narn Tu lem Distt anol “el: 84s) 3794.0520 Fax. s644) 3796.0522 Mgr: 0202149830 Sheet No. 2 of 6 PURCHASE ORDER Job Code : G-Vos2-40-0000 OfeENo. ae | G-V002-P-3100-002-A 7 PRICE BREAKDOWN Wo. Tiamm description ~ Amount (VND) Remarks => 7 Sle invesigaton work 102,008,500 See Cost breskown ir ‘tachment 2 ~ Contractor's quotation ‘oie This amounts excluding VAT 10% (1) The CONTRACTOR shall be responsible for necessary legal proceedings, application to central and local government, tax decorations, etc. required in connection with the execution of the Works. (2) Costs and expenses, whether director indirect, incurred by the CONTRACTOR in perfonming the Works shall be deemed {abe included in tis Purchase Order Amount. (8). The Purchase Order price is a fixed lump sum and inclusive of all compensation for accomplishing the Works; any and all coete and expenses for labor, supervision, surveyors, material, tools, consumable supplies, equipment requited for the Works . .NS-F-200.0001 Rew (EG us6 Vietnam Go., Lid. [Un1705,17F, Keangram Hanoi Landmark Tower, Lots Cau Gay New Urban Area, Me Ta Wa, Nom Tu Liem Dist Hart ‘et vba) S7o4.0620 Fax B44) 3794-0522 {Priced) wet ci240630 Shoot No.:3 of 5 PURCHASE ORDER Job Code : G-V032-40-0000 -V032-P-3100-002-A, ‘APPLICABLE DOCUMENTS: ‘This Purchase Order shall consist of the folowing documents which, in the event of any inconsistency, shall rank in priory in the same order in which they appear below, unless otherwise started herein: c (2) “Attachment + — Request for quotation RFO-VS08-$100-00-F, ) The lex of this Purctase Order (@) Attachment 2 Contractor's quotation Ref 645 TCTIQLDAM dated 08 May 2018. (4). Attachment 3 Form of Certiicate of Completion othe Works. 2. PAYMENT TERMS Payment shall be madé by T.T. remittance within 30 days after VC's receipt of CONTRACTOR'S duly signed original invoice together with al the other required spectied and milestone payment as beiow. (1) Final payment: One hundred percentage (100%) ofthe offered price subject to the following document ~ Lotter of payment request = VAT tnvoies ~ Certicate of completion of the Works 3. INVOICING PROCEDURE 2.4 ‘Address of invoice Invoice shall be addressed to: IGE Vietnam Co, Ltd Unit 1709, 47F, Keangnam Hanoi Landmark Tower, Lot Eé Cau Giay New Urban Area, Me Tri Ward, Nam Tu Liem District, Hanoi ‘Attontion : Mr, Ryosuke Hoshijima E-mal — : hoshiiime.ryosuke@jgcvietnam vn TelNo : ¥84 (24) 3794-0820, Ext. 1100 2.2 Invoices for Payment Invoice for payment must be duly signed by CONTRACTOR’s representative and maid to the addressee 08 ‘mentioned in item 2.1 together wit al requred documents specified in ‘Payment Terms! 2.8. Further information required with invoize for payment ‘Special care should be taken that each invoice cles includes at least the following information. JVC reserves {the right to disregard invoices submitted with insufficient information ~ Purchase Order Number = Project Name Job code 200-0001 Rei. PURCHASE ORDER NO. G-V032-P-3100-0002-A, [AMENDMENT NO. G-V032-P-3100-002-A-AMD-01, AMENDMENT NO.1 OF THE PURCHASE ORDER BY AND BETWEEN CONSTRUCTION CORPORATION NO.01 J.S.C (CCI) AND JGC VIETNAM COMPANY LIMITED (JVC) FOR SITE INVESTIGATION WORK PROJECT: TTC NO.1 SOLAR POWER PLANT PROJECT Page L of PURCHASE ORDER NO. G-V032-P-3100-0002-A, AMENDMENT NO. G-V032-P-3100-0002-A-AMD-01 The Purchase Order (PO) No. G-V037-P-3100-0002-A was issued on 14th of July 2018 by and between Construction Corporation No.O1 J.8.C (CC1) which has its registered office at 111A, Pasteur, Ben Nghe Ward, District 1, Ho Chi Minh City and JGC Vietnam Co., Ltd. (:VC") which has its registered office at Unit 1709, 17F. Keangnam Hanoi Landmark Tower, Lot E6 Cau Giay New Urban Area, Me Tri Ward, Nam Tu Liem Distriet, Hanoi On 15" of October 2018, in accordance with additional requirement from JVC, CCI and IVC hereby agreed to amend the said Purchase Order as follow Article: Price Breakdown The total amended PO price: 907,949,955 VND (including VAT) (In words: Nine hundred and « Seven million, Nine hundred Forty - np — om | eee | ot ewes Previn | amcunt | Unnoon | Saerpsr | “Kuna CODE DES CRETION: ico BQ (VND) (vNDIBQ) Approved | (Noy, = ii ach Sel fe) _ si | ei ne 100 | soitvestiaion renal ‘Onshore (08 hole x 20.0mvhole + 03 hole | 24,00 | siern_| eoantoS} Z sto | zenon| ssszscoo Undisturbed Sample (a sample / 4m Iss tm [oti % 2300] 13400| — s.08z.000 [5 ‘tite Sale nls ng rain : eal wm) exvo| ao] | he ‘Standard Penetratn (SPT Value test , a 5 NC sroan_| Sina Peta ver] sn] szmoo| sane | atco| veins traxe_| SP eey aa] aon] arawzso0| 2sszs00| —2100| ersszs00 i ff t = vrzun | S2ecicGovty Tromwonarina | wos| 2400] 7705000 arson] rox00| x.705000 vray _| Mose comer tatoo] zoaow| srs] 0000] r7a5e00 sraxg)_| 80 Aras Tran pn a vo | toro] zzos000| sravo| avon] 7oscoo trap _| Hiv ina Ger nen cin na | om | oman | sim] eco] siaag_| PaBiLnt (ino ee ree| oe) 632500 | srsoo| 10400 aur | BWR ore Fm ves] a400] rzosan0| ersen| x00] rrescoo | Uncontined compression test (TN nén ae] Pt He +1246 _| nant) me _|__ sri] t2400 | r708000 | 1125 | Tar es OO ene saneoao | iamman® | aon | — soa 1126 | Constant nin ob ree [ 00 | aratoom | — e250 Prokerester cy sal De ire TN | ~ a rior | Pres oy se Die | 120 2zon00 | 230000 UU tet cy safe fing GNU 7 [vas [Woe sstt wea] 400 | expo | 725000 Otormaton f poe ya ae | cating west| 100] 1728000 sco) 1.725000 {tac 68 ny co a a ce | Page 2 of 4 PURCHASE ORDER NO. AMENDMENT NO, G-V032- 5-V032-P-3100-0002-A, -3100-0002-A-AMD-O| { See I ‘BO formation Cam. | | | T cont | grees, Ananda res | Provisional | Amount UnitCost | BOs per yes DESCRIPTION owe | Pega | AGN | i8a) | Apgoved | “ney He Te | a ei ior Fl vane tet (i pgm ct anh, wi | tit 15m). ‘hd ch nv gh 1190 zsersaco| "787300, eon 25012800 uae Thinghiém eB rh hien waong | 5 ‘] Coes >? (Co Ramee norpeea Omer ——] T-GRGANRTATION CHART J manPoweR SCHEDULE fs Constauction equewent i. SCHECALE OF ESTHAATED UTUES CONSUMPTION 5 SeMrORARY FACILTES AKER REQURENENT PROPOSED CONSTRUCTION METHOD -ORMATION ON QUALITY ASSURANCE INFORMATION ONPEATH SAFETY, SECURITY AND rueoRMENT Job Code: G-V020-40-0000 Project: Krong Pa Solar Power Project Owner: Gia Lai Electricity Joini Stock Company TABLE OF CONTENTS ~ CONTRACT No. A-V020-40-CC1-0001 ‘ t+] GENERAL CIVIL WORKS a Description Volume a | Agreement Volume-1 2 | General terms and Conditions | Volume-1 3 | JVC HSSE Policy 1 Volume-1 4 | JVC Quality Policy { Volume-1 § | Clarification Volume-1 Annex 1 - Scope of Work and Supply Volume-1 Volume-1 7 | Annex 2- Specifications ‘Annex 3 - Contrac t | rice, Bil of Quantities and Unit | \ | l 8 Volume-2 Rates 9 | Annex 4- Time Schedule of Work Volume-2 10 | Annex § - Drawings Volume-2 11 | Annex 6 - Planning Documents Volume-2 | VOLUME 1 ay n sub-conlracl agreement_RM_CC! (Civil Work} AGREEMENT BETWEEN JGC VIETNAM CO., LTD. AND CONSTRUCTION CORPORATION NUMBER 1 ~ JSC FOR GENERAL CIVIL WORKS Page 1/30 JVS-F-168-021 ~ Rov 0 | | onlracl ageeement_RM_CC1 (Civil Work) , CONTENTS ARICLEL. _cowitnex BocuMeNTATON AICIE2 SCORE OF Wor AND SURLY ARNCLES —_CONIRACI PRICE -OMPENSATINTO CONTRACTOR ARNE, Tees OF PAYMENT ARICIES, Me FOR COMPLETON ARICIES —_-ACCEMANCE ARICIE?. _ GUARANIE ARICIE®. CHANGE N HE WORKS ARICIE®, _peioaMance stcuRIY ARICIEYO, — NoNces ARTE, Ucuace Amicle 12. Govesninc iw § ARICIENa, —eFECIVEDATE ‘ i BHIBTA, —_ FORKOF CERIFICATE OF COMPAETON OF HE WORKS LxNTE, FORM OF AFIOAVI OF REEASEOF ENS AND CLAS ExNBTC, —_FORKOF CONFRNAATON OF HE RNAL ACCOUNT Exo, FORM OF CERIFICATE OF PROVISONAL ACCEPIANCE Ext, FOR OF CERTFCATE OF FNAL ACCEPTANCE Exh, FORMOF BANK GUARANTEE REFINDMENI BOND] ext. FORMOF BANK GUARANTEE PERFORMANCE BOND) EXHIBIT, FORM. OF PARENT. COMPANY. GUARANTEE (Nat applicable) Page 2/30 IVS-F-168-021 ~ Rev 0, | Sub-conliacl agreement_RM_CC! {Ci This cgreement [heteinaller colled "Agreement" is made ang enieted info os of this 04" day of Apr, 2018 in Hanoi - (Vielnom) belween JGC Vielnom Co., Lid, @ corporation of Vietnam having Jstered olfice at Unit 1709, 17 Floor Keangnam Kano! Londmork Tower. ES. Cau Giay New Urban Area, Me Tii Ward, Nam Tu Liem Disticl, Hanoi, Vielnam {hereinalter called "VC") and Construction Corporation Number 1 - JSC(CC1) having his registered office of 1114. Pasteur, Ben Nghe Ward, Distfict 1. Ho Chi Minh City. Vieinam (hereinatter called the “Contractor \WITNESSET! WHEREAS, Gia Lai Electricity Joint Slock Company {hereinafter called the "Owner’) established under the laws of Vietnam is desious that Krong Pa Solar Power Project (hereinatter called the Plant’ should be consttucted in Krong Pa District, Gia Lai Province, Vielnam and has contracted with JVC for the performance of the basic design and detailed design, the procurement of ‘equipment and materials, the construction and the commissioning work required to establish the Plant; AND WHEREAS, JVC dosires the Contractor to camry out cerlain works and services (hereinatter called the "Works"] necessary fo construc! Ihe Plant subject to the fetrns and conditions set forth herein: AND WHEREAS, the Contractor represents and declares that the Contractor has adequate statt ‘of competent and experienced personnel, all requisite statf resources and expertise in order to camry ou! the Works satisfactorily and in a timely manner and is willing 10 Cary out the Works in accordance with the terms and conditions provided for hereit AND WHEREAS, in consideration of poyments to be made by IVC 10 the Contractor os hereinafler mentioned, the Contractor hereby covenants with JVC fo cary out, complete and guarantee the Works in conformity in all respects with the terms and conditions set forth herein: AND WHEREAS, JVC hereby covenants lo pay the Contracto: in consideration of the conying out, completion and guaranteeing of the Works the Contract Price at the times and in the manner prescribed by the terms and conaitions set forth herein: NOW THEREFORE the parlies hereto agree as follows: Page 3/20 JVS-F-168-021 - Rev 0. Sub-conitact agreement RM_CCI {Civ Work} ARTICLE 1. CONTRACL DOCUMENT betINTION In the Contract. as nereinatter defined, the following meanings hereby assigned to tl (a) (0) o (a) (e th {a} (ny “a o (e) 0 (m) (ny 4s. and expressions shall have the nem, except where the context otherwise requites: “owner means the owner of the Plani named os such in the Agreement: IVC" means JGC Viel Nam Co., LId.. the company who is entering into the Contract wilh the Contractor for entrusting the Works: Contractor” means the company who is undertaking fo execute the Works under the Contract with IVC; “Works means the works and services as defined in ARTICLE 2 of this Agreement: “Contract” means the Agreement, the General Terms and Conditions and other documents referred to in ARTICLE 1.2 of this Agreement; “Provisional Contract Price”, “Contact Price” and “Final Contract Price" mean the sums named in ARTICLES 3.1, 3.4.2 and 4.5.2 of this Agreement; “Constiuction Equipment” means all appliances or things of whatsoever nature required in or about the execution of the Works (or the making good thereo! during the Guarantee Period) but does nol include Temporary Works, materials or other things intended fo form oF forming parl of the Plant; “Temporary Works’ means all temporary works, facies or materials of every kind required in or about the execution of the Works (or in the making good thereof during the Guarantee Period) but does not include Construction Equipment, materials or other things intended to form or forming part of the Plant: “Site” means the areas provided by the Owner on, under, in or through which the Works designed by JVC are fo be executed, and any other land and place provided by the Owner and/or IVC, for working space of any other purpose as may be specifically designated in the Conttact as forming part of the Site: Plant” means the plant to be constructed at the Site by JVC for the Owner: ‘Countty’ means the countty within which the sile is located; ‘Subcontractor’ means any person oF persons oF fim oF Company 1o whom any part of the Works is subcontracted under the responsibilty of the Contractor and includes any supplier of materials to be supplied by the Coniractor for use in the Works: “Completion of the Works", “Provisional Acceplance” and “Final Acceptance” of the Works shall have the meanings respectively assigned fo them in ARTICLES § and 6 of this Agreement “Kick OHf Meeting" means a formal meeting to be held after aword of a letter ol intent or oward of the Conttact for the Works, in order 10 Confirm detailed execution manner of the Contactor before commencement of the Works. Page 4/30 IVS-F-168-021 ~ Rev 0. = en Sub-conlract agieement_RM_CCI {Civil Work} The Contract sha consis of the follewing documents which shall rank in priority in the some: Corder in which they appear below. uniess olnenaise stated herein: [1] This Agreement sms and Condilions (2) General (3) JVC HSSE Policy (4) IVC Quality Policy (8) Clatifications [6) ANNEX 1. Scope of Work and Supply 7) ANNEX 2. Specifications [8] ANNEX3. Contract Piice, Bil of Quantities and Unit Rates 9] ANNEX 4, Time Schedule of Work (10) ANNEX 5. Drawings (11) ANNEX 6, Planning Documents DOCUMENTS MUTUALLY EXPLANATORY. wea Subject to the document priority sel out in the ARTICLE 1.2 hereot, the several documents forming the Contract are to be token as mutually explanatory of one another, but in the ‘event that the Contractor discovers any e1rors, omissions, ambiguities or discrepancies in the Contract the Contractor shal immediately so inform JVC in wailing so thal the same shall be explained and adjusted by JVC who shall thereupon issue to the Contractor instructions thereon. Any work affected by such discoveries which is performed by the Contractor subsequent to discovery bul prior fo clarification by JVC shall be ol the Contractors sk and expense. 1.4 INTERPRETATION OF THE CONTRACT (1) The misplocement, addition or omission of @ word oF character shail not change the intent of any part of the Contract from that set forth by the Contract as a whole. 2) Where aifferent standards relative fo the same matler appear or are refered fo in any of the ANNEXES hereto, the mos| shingent [in JVC’s opinion) of such standards shall apply (3) Should any work or materials or equipment be required which are not denoted in the specifications, the diawings and/or bill of quantities and rules but which in the reasonable opinion of JYC are nevertheless necessary for the proper cantying out of the Contract, the Contractor shall perform this work or furnish these materials or Page 5/30 JVS-F-168-021 - Rev 0. Sub-contract agreement_RM_C' 18 it Wok) equipment as i so denoted. SINGULAR AND PLURA\ Words importing the singular only also include the plural and vice versa where the context requires, HEADINGS The headings used in Ihe Contract shall nol be deemed lo be part thereof or be taken into. consideration in the interpretation or construction thereat, NDMENT TO THE CONTRACT ‘Any amendment to the Contract which JVC and the Contractor have agreed to in waiting shall become par of the Contract, eu wa Page 4/30 IVS-£-168-021 ~ Rev 0. Sub-conlract agreement_RM_CCI (Civ Work) ARI 2. SCOPE OF WORK AND SUPPLY The Contractor shall perform, provide and supply all works. services, equipment and materials set forth in ANNEX | hereto and perform all other obligations required by the terms and conditions of the Contract ond shail be responsible for doing and providing all things of whatsoever nature or description which have not been specitically inclyded in ANNEX 1 herelo.but could reasonably be infeed {from inter_alia the appication of internationally accepted engineering and construction practice} as being necessary for the Completion of the Works, except for those: things which JVC expressly undertakes in this Contract to do or provide: Page 7/30 JVS-F-168-021 ~ Rev 0, sor WON

You might also like