mis SRS (policg Lym Saira C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : HALCROW INTERNATIONAL PARTNERSHIP DEWA App.No : 11003352 Client : Etihad Rail Revision : Project No.: C0306 Date : 13.12.2020 Application Type : Electrical Sub-Contractor Approval ( Cable Diversion work) Project Type jeneral Projects, Project : ETIHAD RAIL PROJECT # C0306 PACKAGE 2C ‘Subje : PREQUALIFICATION OF M/S ARAR UTILITY CO. (LLC) FOR DEWA (ED) 33 KVWORKS With reference to your application regarding the above mentioned subject, your appl the following comments: ion has been approved subject to Comments: * No Objection for M/s ARAR UTILITY CO.LLC. P.0.BOX # 231740, Dubai UAE. to work as the electrical ‘subcontractor for DEWA (ED) 33kv cable Diversion works in the above project only. * Shop drawing NOC application for the HV cables diversion work to be submitted by the above electrical subcontractor only. The same should be submitted as per DEWA standard to enable DEWA to issue the Estimate cost for the supervision, testing and commissioning charges prior to start the work. This is for your information and necessary action, Issued By :Eng. Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : Prem Kumar Ramamurthy Page tof 1 ‘Dasha Electricity & Water Authority 2) pensar TT | at onece mis SRS (policg Lym Saira C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : HALCROW INTERNATIONAL PARTNERSHIP DEWA App.No : 11003026 Client : Etihad Rail Revision : Revision 2 Project No.: C0306 Date : 28.07.2020 Application Type : Electrical Sub-Contractor Approval ( Cable Diversion work) Project Type jeneral Projects, Project : ETIHAD RAIL PROJECT # C0306 PACKAGE 2C Subject : Prequalification of M/s ARAR UTILITY CO. (LLC) for DEWA (ED) 11kvWorks- Subcontractor. With reference to your application regarding the above mentioned subject, your appl the following comments: ion has been approved subject to Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.0.80X - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) 11KV Power Cable laying works in the above project only. * Shop drawing NOC application for the HV cables diversion work to be submitted by the above electrical subcontractor only. The same should be submitted as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work. This is for your information and necessary action, Issued By :Eng. Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : Sameh Abd Allatif Amin Page tof 1 ‘Dasha Electricity & Water Authority 2) pensar TT | at onece KE SESS grotto cLypasotia ‘covétnwent oF Duta Dil Becteye eter Arty Facsimile Transmission Date: 21" Aug 2019 No. of Pages (including this sheet) Page 1 Of 1 To CDM Smith Our Ref: PTD-R1020/1B-0002-2019 Fax No: 043242057 R1020/1B:-132kV Cable Diversion for Dubai Al ‘Ain Road upgradation project. Mr.Walid Hasan - Sr. Resident Subject: Attn: Approval of proposed 132KV Cable Diversion Engineer works Contractor, Reference to your letter (Ref NO;-R1020-1B/CDMS/19/DEW-MK/0003 dated 29.06.2019) on the subject matter please be informed that Main contractor (M/s GUNAL Construction LLC) proposal of M/s ARAR Utility for execution of 132kV Cable diversion works for the cited project is acceptable. However, CDM Smith to ensure that Cable diversion works are carried out in line with DEWA specification & requirement. This is for your information & further action. Najla Hassan Ali Al Mazmi Project Manager - Projects Transmission (Ged on 21-08-2019 084238) cowry A gba leading sustain ee oliegyasaiia Ccovimsuent OF DUDA Dubeidectickye uate thor 17% Mar 2019 PTD-G2-1160-2019 Mr. Shahab Lutfi Chief Executive Officer M/s The Galleria Investments LLC ‘Sub: 132kV Cable Diversion Works (EMRT-HLDY): Approval of Cable Contractor M/s ARAR Utilit Company LLC With reference to developer letter Ref. No.: GI17-04/0046 dated 14/02/2019 and above-mentioned subject, please refer to the below table for the approval status of the proposed cable contractor for EMRT- HLDY 132kV Cable Diversion Project for Plot Nos. 3350213 and 3356237. No. Contractor Approval Status 1 M/s. ARAR Utility Company LLC Approved Please note that above approval is subjected to provision of dedicated resources for the project. This is for your information and necessary action, please. HAIFA ISMAIL MOHAMMAD SHARIF Projects Manager - Projects Transmission PR 22682 (Signed on 17-03-2019 1253.00) grog yasaiia Ccovenxsent oF DUB, Dubai ectctyaleter Puthory Facsimile Transmission Date: 23% Apr 2018 No. of Pages (including this sheet) Page 1 Of 3 To M/s. AECOM Our Ref; PTD-R1048/4-0003-2018 FaxNo: | 044391000 1048/4 - Improvement _of EXPO “Resi Subject: 2020 Road Networks: Subcontractor Attn: tngneer nem Resident roval With reference to your letter [ref SDX-EX4-CIV-LTR-BAH-Y18-00397 dated 08.04.2018], the proposed subcontractor M/s. ARAR Utility Co.LLC, Dubai is approved as 132kV Cable Laying contractor for the subject Cable diversion works for 132kV GRDN-DADM Cable circuit. Contractor should follow all DEWA specification & working procedure throughout the execution of thie cable diversion project. Contract details to be provided as per the template attached. For your informat ye sderhge Vadivelu Elavalagan n and necessary action. Deputy Sr. Manager - Projects Transmission (Signed on 23-08-2018 102627) (CCM RTA Eng. Adel Mohammed Al Marzoog~ Director of ROW Dept) Our Vision s Susaitabie iioneore DDO Beroree Fd NEES polyog yo siina nine cI ube eecrckuloterruthory ELECTRICAL SUB CONTRACTOR APPROVAL DEWA Ref No : 11000124 Date :03.112016 To: ‘SAEED&.MOHAMMED(ALNABOODAH ENGINEER! Application Type: Electrical Sub-Contratcor Approval ( Cable Diversion work ) Project: ‘SATWA ZONE’S DEVELOPMENT-ROADS AND INFRASTRUCTURE Subject: PROPOSED 132 KV DEWA-ED APPROVED CONTRACTOR Reference to your application regarding the above mentioned subject. Your application has been approved ‘subject to the following comments: Comments: * We have No Objection for lis ARAR UTILITY CO. LLC. P.0.BOX - 281740, Dubai, U.AE to work as electrical subconiractor for DEWA (ED) EHV 132kv able Diversion works in the above project orly. * Mis. ARAR shall submit a separate decicited organization chat specific to this project for DEWA review/approval at DEWA - Warsan Complex - First floor - ProjectsTransmission Department (PTD). * Mis. ARAR shall confirm that this will nt kave any impact on the running DEWA projects schedule due to resource assignment by Mis ARAR. esses 2:80, anna a satan jor Manager: nrastuctrelnformatn and Pars Prepared by : SAMEH ABD ALLATIF AMIN ‘orgs out terete Aonty co ong lng a obese, cu ne eg a58t op Te eoieso age ax seri 200m servansent Sear saa ce desntevaoe vase 23 xt Aseatwat Cy ere erred sn, geen epee nih nina oy ena gai oe neater teats eo “ARES ae ay polieg peso CconinwsenT oF DUB SiositecietysLter ratory [eer eae A pr ieee we Deters: Bil Michorrad tis Prequalification Document for M/s. | ‘enatractor for 11, 33,132 kv Works Reference to your letter re: 206/R777/3C2/15R0004 dated 18% March 2015, which was received bby DEWA on 22% March 2015, regarding the abave subject please be Informed that, we have Ng ‘Objection for M/s ARAR UTILITY CO. LLC. P.0.80X ~ 231740, Dubal, UAE to work as electrical subcontractor for DEWA |ED) Electrical Cabling works in the above project only. Note: Al works sal Be executed as per DEWA work instruction for arate cable lying Works. Noted: As bul drawing tobe submitted fr DEWA approval after completing the diversion work Notes: Works of 132K0 for slewing plot cables ony ‘This is for your information & necessary action please rag Amina Ali Hashem ‘SM - Infraptructure Information & Permits Dubai lecticity & Water Authority" 036: wee [PROJECT: 2625 - EXTERNAL ACCESS ROADS TO PROPOSED COMMERCIAL BUILDING [PIE-20201002- JON PLOT NO.4237988 AT AL WARGA THIRD, DUBAI, UAE : PQN-0007 RO1 se & PREQUALIFICATION SUBMITTAL pon aslo RECEIVED PYEZOa0100 x cons Road PROSCAPE We submit the following Preq 19 MAR 2020 | Suomitted by (Contractor): = Bate: 18.93.2020 ern, te 7 [Prequalification Document for ARAR UTILITY Go, LLC For (Electrical Works) [Scope 192 KV Protection Works Cable Lowering Duct Laying & Backfling a2], if PEE a CN ROS [Received by (Constants Date im [Approval Status. z = Approved a yrres 5 Noted Rejected (Comments: A/Q) TION, FON 7 VO SIQIKT COMPURTA R argon CEGIE HY B COAG GFR YULRTOV DUD YEE 1, $160 SCT TO ero rox we COMMA KEOUMEYONIT E ENGINE'S QE RECY: LIN. oy TE < Lier & Signature: Distrbution co Suneyor Ty inspector mis SRS (policg Lym Saira C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : PARSONS OVERSEAS LIMITED (DUBAI BRANCH) DEWA App.No : 11002678 Client : DUBAI ROADS & TRANSPORT AUTHORITY Revision : Revision 1 Project No.: R1060/18 Date : 12.03.2020 Application Type : Electrical Sub-Contractor Approval ( Cable Diversion work) Project Type toad Projects Project : DEVELOPMENT OF SHEIKH RASHID BIN SAEED CORRIDOR (NAD AL HAMAR I/C TOE311) ‘Subject : Prequalification of M/s ARAR UTILITY CO. (LLC) for DEWA (ED) works With reference to your application regarding the above mentioned subject, your appl the following comments: ion has been approved subject to Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.0.80X - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) 11KV & 33KV Cable Diversion works in the above project only. * Shop drawing NOC application for the HV cables diversion work to be submitted by the above electrical subcontractor only. The same should be submitted as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work. This is for your information and necessary action, Issued By :Eng. Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : Khadija Mohamed R. Banihammad Page tof 1 ‘Dasha Electricity & Water Authority 2) pensar TT | at onece SSS gpoliog cya sdiza C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : CDM SMITH INC DEWA App.No : 11002101 Client : DUBAI ROADS & TRANSPORT AUTHORITY Revision : Project No.: 1020/18 Date : 30.06.2019 Application Type : Electrical Sub-Contratcor Approval ( Cable Diversion work) Project Type toad Projects Project : R1020/18 - UPGRADE OF DUBAI ALAIN ROAD, CONTRACT 18 ‘Subje : REQUEST FOR APPROVAL OF SUB-CONTRACTOR M/S ARAR UTILITY FOR 6.6KV, 11KV AND. With reference to your application regarding the above mentioned subject, your application has been approved subject to ‘the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC P.0.BOX - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) 6.6, 11 & 33KV Cable Diversion works in the above project only with the following, condition, * Submit shop drawing for relocation of cables as per DEWA standard to enable us to issue the estimate cost for ‘the supervision, testing and commiss ‘charges prior to start the work. This is for your information and necessary action. Issued By : Eng, Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : IMRAN SHAHID. NOTE Tse acamuter gerd doce and maya ea sgt Page 1 of 1 For generations to come gaoliog Lym Séira GOVERNMENT OF DUBAL Dubai electricitusUlater Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : PARSONS OVERSEAS LIMITED (DUBAI BRANCH) Client : MERAAS ESTATE (LLC) Project No.: MHO021 Date : 17.02.2020 Application Type : Electrical Sub-Contractor Approval (Cable Diversion work) Project Type : Road Projects Project : MH0021 - CONSTRUCTION OF JEBEL AL! LABOR CITY ROADS ‘Subject : APPROVAL OF SUBCONTRACTOR (ARAR UTILITIES) FOR 11. KV WORKS With reference to your application regarding the above mentioned subject, your application has been approved subject to the following comments: Comments: * No Objection for M/s ARAR Utility Company to work as the electrical subcontractor for DEWA (ED) 11kv ‘able Diversion works in the above project only. * Shop drawing NOC application for the HV cables diversion work to be submitted by the above electrical ‘subcontractor only. The same should be submitted as per DEWA standard to enable DEWA to issue the Estimate cost for the supervision, testing and cummissioning charges prior to start the work ‘This is for your information and necessary action. Issued By: Eng. Amina Ali Hashem ‘Senior Manager- Infrastructure Information and Permits Prepared by: Prem Kumar Ramamurthy NOTE Tie sconpiter geen cman nd ray at agi yin Page 1 of 1 For generations to come DURVISION,Asustanale ovate wor cls uty, outcry ame vc Tasanemeaia onese | eal is SSS gpoliog cya sdiza C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : ARAR UTILITY CO. LLC DEWA App.No : 11001761 Client : ARARUTILITY CO LLC Revision : Project No.: NIL Date : 18.02.2019 Application Type : Electrical Sub-Contratcor Approval ( Cable Diversion work) Project Type jeneral Projects, Project : EXISTING CITY TOWER 1 ‘Subject : Prequalification of M/s ARAR UTILITY CO. (LLC) for DEWA (ED) works- Subcontractor. With reference to your application regarding the above mentioned subject, your application has been approved subject to ‘the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.0.BOX - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) HV 11 KV Cable Diversion works in the above project only. * You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior ‘to start the work. * For 132Ky cable dversion/ modification and outage related works, approval to be obtained from Transmission Projects (PTD). This is for your information and necessary action. Issued By : Eng, Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : SAMEH ABD ALLATIF AMIN NOTE Tsar gerade may ten ay spar Page 1 of 1 For generations to come SSS gpoliog cya sdiza C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : KEO International Consultants LLC DEWA App.No : 11002079 Client : DUBAI ROADS & TRANSPORT AUTHORITY Revision : Project No.: R1006 Date : 20.06.2019 Application Type : Electrical Sub-Contratcor Approval ( Cable Diversion work) Project Type toad Projects Project : UPGRADE OF AL KHAWANEEJ ROAD & MUSHRIF PARK CORRIDOR: ‘Subje /S. ARAR UTILITY CO FOR SUBCONTRACTOR OF HV 11 KV CABLE DIVERSION WORKS ONLY With reference to your application regarding the above mentioned subject, your application has been approved subject to ‘the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.0.BOX - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) 11KV, Cable Diversion works inthe above project only with the falowing conditions. * You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable Us to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work. This is for your information and necessary action. Issued By : Eng, Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : IMRAN SHAHID. NOTE Tse acamuter gerd doce and maya ea sgt Page 1 of 1 For generations to come rol Lym saipa GOVERNMENT OF DURA Bubal Electricitya eter Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL ‘Ty: DUBAI ROADS & TRANSPORT AUIHUKIIY. DEWA App.No: 11001380, ‘Company : PARSONS OVERSEAS LIMITED (DUBAI BRANCH) Date : 09.08.2018 Project : 81046 IMPROVEMENTS OF THE AL QUDRA ROAD INTERSECTION Project Type : Road Projects Application Type : Electrical Sub-Contratcor Approval ( Cable Diversion work) With reference to your application regarding the above mentioned subject, your application has been approved subject to ‘the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.O.BOX - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) 11KV, 33KV Power Cable cable Diversion works in the above project only with the following conditions. * Youare hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning cherges and depreciation cost prior ‘To start the work. “This Is for your informetion and necessary action. S RECEIVED 13 AUG 2008 Issued By : Eng. Amina Ali Hashem ‘Senior Manager- Infrastructure Information and Permits Prepared by: SAMEH ABD ALLATIF AMIN NOTE Tiss amgee ont dsmantand may iy ei Page 1 of 1 For generations to come ‘ URIS Rearmed sce ecrceytnateratnerty | re] pnsoe se nraeueseee en © gpoliog eLymsaira GOVERNMENT OF DUBAL Dubai Electricity& Water Authority ELECTRICAL SUB CONTRACTOR APPROVAL DEWA Ret No : 11000415 Date : 09.03.2017 To: HALCROW INTERNATIONAL PARTNERSHIP Application Type: Electrical Sub-Contratcor Approval ( Cable Diversion work } Project: ROUTE 2020 METRO PROJECT Subject: Prequalification of Mis ARAR UTILITY CO. (L.L.C.) for DEWA (ED) works- Subcontractor. Reference to your application regarding the above mentioned subject. Your application has been approved subject to the following comment Comments: * We have No Objection for M/s ARAR UTILITY CO. L.L.C. P.O.BOX - 231740, Dubai, U.A.E to work as electrical subcontractor for DEWA (ED) HV 33KV, 1 1KV, 6.6KV Power Cable & 33KV Pilot cable Diversion works in the above project only with the following conditions. You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work lessnt9y 505 sina a ase enor Manager fntrastuctre Information and Permits Prepared by : SAMEH ABD ALLATIF AMIN Page tof bua ett water ato Ss Posors6Dba, E 3 pe attat Tear szea oc Ses4em eee -amesisen ul eral siewa@dewa gov Relies dewa@dewe.govae Doecercn Terre Beene WolD ences wer dewa.govae GOVERNMENT OF DUBAI Dubel Electricitye Weter Authority ELECTRICAL SUB CONTRACTOR APPROVAL DEWA Ref No : 11001108 Date : 11.03.2018, Te: PANSONS OVERSEAS LIMITED (DUBAI BRANCH) Application Type: Electrical Sub-Contratcor Approval ( Cable Diversion work ) Project: ‘T0076 DHCC PHASE 1& 2 ROADS AND INFRASTRUCTURE WORKS Subject: Prequalification of N/s ARAR UTILITY CO.LLC for DEWA (ED)! thy works-Subcontractor Reference to your application regarding the above mentioned subject. Your application has been approved subject to the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LL. P.0.8OX - 281740, Dubai, ULA.E to work as electrical subcontractor for DEWA (ED) HV 11KV Cable works in the above project only as per DEWA Design NOC ref. 100114458 with the following conditions. * Separate application for 132kv DEWA-ED prequalifcation to be submitted for DEWA review/approval at DEWA - Warsan Complex - First floor - Projects Transmission Department (PTD). * You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estate ust forte supervision, testing, commissioning charges and depreciation cost pror to start the work Issued By : Eng. Amina Ali Hashem ;nior Manager- Infrastructure Information and Permits $e: = Page 1 of 1 3 Prepared by : SAMEH ABD ALLATIF AMIN ut lect BWaterAuorty 9 Ag cygS atm 7080364, Dubs, UAE 2] g2554..p Tel «5714324 a4aa Fax sa7i6324em1 87143266 Sl «S74 Sad in evade gove ra devotee. 9613 OK AS nme Cay, ik Guo ened CORMIESION, we ae committe ote Pssst au sald nd pret eas yg Als as ll JS yo als laa al lal et ay vonage deer of sumaeledtryandvet staworscasine ote, Sic abo Sil Hse Oy a May dg ole ge Se eos alg ‘nro sty na neon sree aa ogee rd zB oie a ethene nasi etary lope gees Hs TD marcus Fleamenon orn, WED cain rane ew. gov 3 SSS gpoliog cya sdiza C GOVERNMENT OF DUBAL Dubai Electricity& Water Authority DEWA ELECTRICAL SUB CONTRACTOR APPROVAL To : DUBAI ISLAMIC BANK PJSC DEWA App.No : 11001371 93.07.2018 Company : Arcadis Consulting Middle East Limited D: Project : MADAIN AL EMARAT (BADR) Project Type : Road Projects Application Type : Electrical Sub-Contratcor Approval ( Cable Diversion work } With reference to your application regarding the above mentioned subject, your application has been approved subject to the following comments: Comments: * We have No Objection for M/s ARAR UTILITY CO. LLC. P.0.80X - 231740, Dubai, UAE to work as electrical subcontractor for DEWA (ED) LV, 11KV, 33KV Cable Diversion works in the above project only with the following. conditions. * You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work. This is for your information and necessary action. Issued By : Eng, Amina Ali Hashem Senior Manager- Infrastructure Information and Permits Prepared by : SAMEH ABD ALLATIF AMIN NOTE Tsar gerade may ten ay spar Page 1 of 1 For generations to come sy = SA gpoliog eLymsaira GOVERNMENT OF DUBAL Dubai Electricity& Water Authority ELECTRICAL SUB CONTRACTOR APPROVAL DEWA Ret No : 11000847 Date : 31.10.2017 To: AURECON ENGINEERING INTERNATIONAL (PTY) Application Type: Electrical Sub-Contratcor Approval ( Cable Diversion work } Project: 1028/1 EXTENSION OF TRIPOL! ROAD AND IMPROVEMENTS OF ALGERIA ROAD Subject: Prequalification of Mis ARAR UTILITY CO. (L.L.C.) for DEWA (ED) works- Subcontractor. Reference to your application regarding the above mentioned subject. Your application has been approved subject to the following comment Comments: * We have No Objection for M/s ARAR UTILITY CO. L.L.C. P.O.BOX - 231740, Dubai, U.A.E to work as electrical subcontractor for DEWA (ED) HV 11KV. 6.6KV Cable Diversion works in the above project only with the following conditions. You are hereby being advised to submit shop drawing for relocation of cables as per DEWA standard to enable DEWA to issue the estimate cost for the supervision, testing, commissioning charges and depreciation cost prior to start the work lessnt9y 505 sina a ase enor Manager fntrastuctre Information and Permits Prepared by : SAMEH ABD ALLATIF AMIN Page 1 of 1 bubas tect & ater authonty or oling cl an 08 564, Dual, LAE 3 DElasI9864 Lp Tel +9714 326 446 Fax +97M4 32087 St 9716 326 811 abla +9716 324 6444 he siewa@dewa gov Relies dewa@dewe.govae CURVSINASronblelrathe Wr Ca iy, CURMISEN: We cries apie salsa ping Disp Au as al uy ‘Sentra gy aan deta sare ig a yl Doecercn Terre Beene WolD ences GOVERNMENT OF DUBAL [ bate evosanie [ No. of Pages ( including this sheet) To M/s. Parsons | Our Ref.: &/TS&C/PQ/F/0463/2014 Ll : —— = ] FaxNo: 043367920 Subject: na8i/20- Comprehensive improvements othe Pra Roads: Phase 20 Lig 3 Attention ; Mr. Hisham Ashour Pre-Qualifcation of M/s ARAR Utilty Co. LLC for DEWA ED HV St Resort Engineer vre-aualiieation Reference to your letter ref: 206/R881/2D/14R041 dated 17" July 2014, regarding the above subject, please be informed that, we have No Obiection for M/s ARAR to work as electrical subcontractor for DEWA ED HV 11kv Cable works for the above project only. wing to be submitted for DEWA approval the diversion wor This is for your information & necessary action please, ‘Amina Ali Hashem ‘SM Inlrastructure Information & Permits cera 88836. . Dubai Electricity & Water Authority 90 E> 04325 817 Cable KANRABA, Dubs Th 45838 Kovaba gioling sly om 4aisa Dubai lectricitya Weter Authority — GOVERNMENT OF BUBAL Facsimile Transmission Date 15-06-2016 Case No, 1052/16 No. of Pages ( including this sheet) | Page | 1 i of 4 { i To: M/s. Parsons Our Refi: 1&p/Ts@c/Pa/F/0558/2016 i FaxNo: 09-336 7920 | subject: pi1043/2 Development of Sath Al Salam Street ~ Phase It ; . Attention Mr. Abdul Gaffar Rn. Prequalification of M/s ARAR Utility Co. LLC for DEWA-ED HV Resident Engineer Atkv & 33kv Cable Works L = Reference to your letter ref.: 206/R1043-2/16R001 dated on 14"* June 2016, which was received by DEWA on 13% June 2016, regarding the above subject please be informed that, we have No Objection for M/s ARAR UTILITY CO. L.L.C. P.0.8OX 231740, Dubai, U.A.E to work as electrical subcontractor for DEWA (ED) HY Likv & 33kv Cable Diversion works in the above project only. Notes All works shall be executed as per DEWA wort Instruction for private cable laying works. ‘Note2: As built drawing to be submitted for DEWA approval after completing the diversion work. Note3: You are hereby being advised to submit shor drawing for relocation of cables as per DEWA standard to eneble DEWA issue the Estimate for the supervision testing, and commissioning charges prior to start the work, This is for your information and necessary action please. a MEE AL Le J Neri: hvina BifHashem ‘SM ~ Infrastructure Information & Permits Mea RECEIVED 16 JUK 2016 | lpansons sire orric 9104/2 Forgeneration:tecome & asta iJ y a! nse Dubai Electricity’ Water Authority, Facsimile Transmission T ee a Date 02-02-2016 Case No.0176/15 No. of Pages (including this sheet) | Page | | of | 4 - L | To: M/sParsons Our Ref: gp/Ts@c/Pa/F/0094/2016 FaxNo: 94-336 7920 Subject : R921/18 - Improvement of Al Wasi Road ~ Phase 1B ~ Interchange 2.5 Mr. Rabea Al- Ani Attention * Resident Engineer Prequalification Document for 11kv & 33kv cable diversion (M/s ARAR Utility Co. LLC) Reference to your letter ref: 206/R921/18/16R006 dated 31* January 2016, which was received by DEWA on 1* February 2016 regarding the above subject; please be informed that, we have No Objection for M/s ARAR UTILITY CO. L.LC. P.0.BOX ~ 231740, Dubai, U.A.E to work as electrical subcontractor for DEWA (ED) HV 11kv & 33kv Cable Diversion works in the above project only. Note1: All works shall be executed as per DEWA work instruction for private cable laying works. Note2: As built drawing to be submitted for DEWA approval after completing the diversion work. This is for your information & necessary act > BO Ser PM glalja45838.uSive yo clyaS Lope 04 324 81 11 GuSlee 04 324 44.44 alee Grado han ycIcApoll-. 34564 wer pn olsog cly.a4 aaa pietigastensaitigale ) | kK ee ‘ Golyog cL ya Sein ~ ) GOVERNMENT OF DUBAI Dubel Electricity & Wator Authority, Facsimile Transmission Date 28-12-2015 | Case No.1760 No, of Pages (including this sheet) | Page | 2 | of} a 1 To: M/s.Parsons Our Ret.» wap/ts®c/Pa/F/or90/2015 sate - | FaxNo: 04-336 7920 Subject; R978/3A: Development of Cycle and Jogging Track at Various Locations in Dub (Mirdif, Mushiri, Al Khawanes Al Mizhar) Peeyush Shukla Atterniions so crsrccactaicion Pre-Qualification Document for M/s ARAR for DEWA ~ ED LV & 4k Cable Works ~ Reference to your letter ref: €.2.153/15A4775 dated 21% December 2015; which was received by DEWA on 22" December 2015; regarding the above subject please be informed that, we have No Objection for M/s ARAR UTILITY CO. LLC. P.0.BOX ~ 231740, Dubai, U.A.E to work as electrical subcontractor for DEWA (ED) LV& 11kv Cable works in the above project only. "Note 1: All works shall be executed as per DEWA work instruction for private cable laying works. Note 2: As built drawing to be submitted for DEWA approval after completing the diversion work. Note 3: However, for 132KV Cable activity is only approved for Protection Works. ‘This is for your information and necessary action, St Infrastructure Information & Permits - \ _ an Sean BS &.. orale riyyE ciel oA in yinolang yas aya os) OS A508... Abe gp selyeS dys 04 374 81 1 ude 04 324.4448 Dubai Electricity & Water Authority PO 22x 561 DubsHUAE «Yl 04 3244 46 « FaxG4 324.811) Cable KAHPABA, Luba BRS qodpplyasttye wn) GOVERNMENT OF DUBAI Dubai Electrcitya Water Authority Facsimile Transmission = ae To M/s. PARSONS Our Ref. 1&p/Ts&c/ScA/F/0479/2014 [ Fax No (04-336-7920 | Subject approved Sub Coracer M/s ARR Company Cor | eon ei eet ee arid enee We refer to your letter ref: 206/DPDP-PR-S005/14R0006 dated 13 August 2014, which was received by DEWA on 13" August 2014, regarding the above; please note that we have No Objection for M/s ARAR to works as electrical subcontractor for DEWA ED works for the above project only. Note: As built drawing to be submitted for DEWA approval leting the diversion work. ‘This is for your information & necessary action please. Dubsi Electricity & Water Authority “ ee pes -/¥G (KK) Sabie f GOVERNMENT OF 1 mar Dubel electrcitya Ulster Authority Facsimile Transmission —— [ bate za-062016 dl [ve Cf Pages (including this sheet) | Page| + fo] | ] To: M/s.Parsons Our Ref. ap/Tsac/pa/r/o375/2014 | Subject; R829/3B - Development of Al Qudra Road - (South) Pre-Qualification of M/s ARAR Utility Co. LLC for DEWA ED HV | Attention. MF- Abdul Gaffar Rah Cable Work | Resident Engineer L Reference to your letter ref: 206/R829-38/14R004 dated 19" June 2014, which was received by DEWA on 22" June 2014, regarding the above subject, please be informed that your submission did not meet DEWA acceptance criteria, Thus you are requested to submit the number of jointer and manpower to enable us process your request of pre-qualifcation. ‘This is for your information & necessary action please. Jee eed inc ‘SM ~ Infrastructure jnformation & Permits ce: RTA RECEIVED | 25 JUN 2014 Jeansous s SY AMM ote bysesueie OY SRET Tory 9 400M 28 co eta ies erigndpayalypn Aya [Dubai Electricity & Water Authority oF. S60 Dlsi-UNt We 08 224 1 ot NROABA Dito Ti GBBSE ai Fe Pe ES a BRS gpolinglypaSdiio GOVERNMENT OF DURAI Tubal eectricyk Ulster Authority Facsimile Transmission Date 25422018 No.of Pages inducing this sheet) | Page | a | of | aca | Our Ret mawpisecrruyryores/aoie Consul 1152-004 MEYDAN GATED COMMUNITY 1153-002 - MEYDAN RACE COURSE VILLAS FaxNo: 04-3396880 Mohammad Kalloush Attention PREQUALIFICATION FOR APPROVAL - M/S ARAR UTILITY Co LLC. Resident Engines FOR DEWA-ED CABLING WORKS Reference to your letter ref: MGC-153-04-206-0365 dated 24" December 2014, regarding the above subject please be informed that, we have No Objection for M/s ARAR to work as electrical subcontractor for DEWA (ED) Electrical Cabling works for the above project only. 'Note1: All works shall be executed as per DEWA work instruction for private cable laying works. ‘Note2: As built drawing to be submitted for DEWA approval after completing the diversion work, ‘This Is for your information & necessary action please. Pearson ‘SM ~ Infrastructure Information & Permits 6S yes asase Lyi aSbt ayognolag ay aAabaa Fx 0622831 11 Caio KAFRABA Dt «Te 5838 Corraba EM BES GOVERNMENT OF DUBAL prot 40g cLymSaira Dubeleactrictys Ulster thority Facsimile Transmission Date oraz2m5 | Ce No of | a 1668 No. of Pages (induding ths shee) Fax No Attention To: M/s. Louts Berger (04-307 0400 {Loueas Symeon Construction Director OurRet.» napyrsec/eayr/o739/2015 Subject R983 Pedestrian Bridges at Various Locations in Dubai ~ Bridge #2—Al Mina Street Pre-Qualification Document for M/s ARAR for HV Cable Diversion Works - Bridge # 2~Al Mina Street Reference to your letter ref: $101091-L8-TC-DEWAAAT-O-15-0024 dated 06" December 2015; which was received by DEWA on 07" December 2015; regarding the above subject please be informed Lal, we have No Obieetion for M/s ARAR UTILITY CO. LLC. P.0.80X~731740, Dual, ULA.E to work 4s electrical subcontractor for DEWA (ED) HV 11ky &33ky Cable Diversion works in the above project only. "Notet: ail works shall be executed as per DEWA work instruction for private cable laying works ‘Mote2: As built drawing to be submitted for DEWA approval after completing the diversion work ‘This is for you Dubai Electricity & Water Authority fox SA Dus UA » 043244444 « Fax 04324811 Ca RAHRABA Dub «Th 5838 Kaaba information and necessary action. San GZS —— Pig Aon 4SES0 tte ya dye OLDABI TI yudlse 24-4 A Stor emrigMac Ajo pS6..ogpolion lyasdiia te . Son pol yop el poselye ovens OF Sovet eects tory [rset ican | SRS aga wage wan Actin: Méaonamag em | requalfiation Document for M/s. | | contractor for, 33,132 kv Works en Reference to your lerter ret 206/R7727/3C2/15R0008 dated 18 March 2015, which was received by DEWA on 22° March 2015, regarding the above subject ploase be Informed that, we have Ne Objection for M/s ARAR UTILITY CO. LLC. #.0.80x ~ 231740, Dubei, UAE to work a electrical subcontractor for DEWA (ED) Electrical Cabling works inthe above project only Note: ll works sal be executed 35 por OEWA wor instruction for arate cable laying works Note: As built crawing tobe submited for OWA approval ater completing the diversion work Note: Works of 132KV fr slewing plat cables oly ‘This for your information & necessary action please. “ania li Hashem ‘ getigay asape Dubai leticity 8 Water Autrey 9 foros cassie 08 nes i BSS olueg ya saiia a Govt MENT OF DURA Dubotdlecrity eter Rumors Facsimile Transmission | Date 23.03.2015 No.of Pages including this sheet © 12)Mafs khansaheb Our fof: uar/tsacysca/e(ois7/2015 | FaxNo: g4-2as7s39 Subjecl= p-as7F2JAFZA CONVENTION CENTER / ROADS. WorKs. Axtention Dubs ery & Water Authority 5 Sajeeu avian kelinee PREQUALIFICATION DOCUMENTS FOR M/S ARAR UTLITY FOR DDEWA-ED 33/11KV CABLE SLEWING AND CABLE LAYING \We reer to your leter Ref: KR479_LTR_KCE_DEW._029 dated 18" March 2015, which was received bby DEWA on 22% March 2035, regarding the above subject please be informed that, we have No Objection for M/s ARAR UTILITY CO. LLC. P.0.S0X ~ 231740, Dubai, U.RE to work as electrical subcontractor for DEWA (ED) HV I1KV, 33KV Electrical Cabling works in the above project only Note: Al works shal be executed as per DEWA wer insti for private cable laying works Note: As bul rowing tobe submite for DEWA aparoval after completing the diversion work This is for your information and necessary action SM ~ Infrastructure Information & Permits (pole pase ‘conser F288 Braemar eterna Fae Yann [paw wens | Gre pif ia aaegbvaet os] » [aT [> Meeeateten Tou mmcaronrs ] Sibec cowatawn oubievlpmen—statineas ] | “sarcare Wore { | ‘enon of ky Cale ot bub Rana Pamenade— enh | eterno your eter ret ACP) 10/54/2157 eats 18 Februar 2035 which was ‘ace by DEW on 38 February 2015, earingtheabve sje lense be rfrmed tat, we have No Obecton for M/s ARAR UTIUTY CD... P20. ~ 231740 ub, UAC to work as eee subcotaeter for DEWA C0} HY 12k Cale Dives works nthe above Poet ok, Nott Alwods tht be ceed perDEWA wosknatn ergata yng wr ot: stat ann ta ssn for DA approvalat comeing he ness net, ‘isistoryurinormston sdnectay cen. a GBS Wes Nera abomeaeheaton ent

You might also like