You are on page 1of 4

PT Linde Indonesia

Linde Engineering

LE Project No.
1510A4HR
LE Project Code
JAVA
LE Doc. No.
&ASU W-DW 2406(EN)
Page 1 of 2

Confidential

Order No.(订单号):

Isometric Supplement Sheet


IFU 01 13/10/2022 B.Parmar,GCIEQ R.Singh,GCIEQ S.Koompa ,PE
Document
Status Issue Date Prepared Reviewed Approved Remarks

© Linde
The reproduction, distribution and utilization of this document as well as the communication of its contents to others without express
authorization are prohibited. Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent,
utility model or design.
Isometric Supplement Sh

Proj. No: 1510A4HR


Proj. Name: JAVA

Isometric
Area: Line ID: Sheet: Rev.:

Isometric Data Welding Data PWHT Data


Weld Pipe Wall- Weld Weld Place WPS Welder Welding yes / Report Execution
No Diameter thickn. Status Type S/F No No Date no No Date
[DN/Inch] [mm] 1) 2) 3)

Abbreviations: 1) G=Golden; Q=Qualification; C=Control; R= Repair; F=Follow up 2) BW - butt weld; BR - branch weld; FW - fillet weld 3) S - shop/prefabrication
4) Methods: [RT][UT]-[MT][PT]-[HT]-[PMI][FN]; Scopes [%]: A=100; B=90; C=80; D=70; E=60; F=50; G=45; H=40; J=35; K=30; L=25; M=20; N=18; O=16; P=14

CONSTRUCTION CONTRACTOR COMPANY

Date Name Signature Date Name


Doc No:
c Supplement Sheet
&ASU W-DW 2406 (EN)

Page 1 of 1 pages

Code Requirements (Categories/Fluid Service) Test System:

ASME: PED/TRCU: NA GOST:

Non Destructive Testing (NDT) Data Material Data


NDT Test Report Testing Part Ident Heat
Comments
Group Method No Date 1 No 1 No 1
4) 2 No 2 No 2

weld 3) S - shop/prefabrication; F- field


=25; M=20; N=18; O=16; P=14; Q=12; R=10; S=8; T=6; U=5; V=4; W=3; X=2; Y=1; Z=0

COMPANY OWNER

Name Signature Date Name Signature