You are on page 1of 3

ACTIVITY COST ESTIMATES

Project name: Project ID: Date prepared:


Project manager: Project Sponsor: Last update:

WBS ID Resource Labor costs Physical costs Reserve Total estimate Basis of estimates Method Assumptions constraints Range Confidence level

[WBS ID of [Person, [Cost of people [Cost of [Amount set aside [Total of the labor, [Cost per unit, weight, hour, [How the cost was [Note anything assumed e.g. [The estimated range [An expression of the
activity] equip, internal or materials, in reserve if any] physical and square metre etc] estimated e.g. analogous, resource available & any higher or lower of the confidence you have in
material outsourced] equip, supplies reserve costs] three-point, parametic. See constraints e.g. unit cost actual cost e.g. the estimate e.g. 70%]
needed] etc] useful resources for more] fixed for 3 mths only]. between -20% to +
30%]

www.stakeholdermap.com Page 1 of 3
WBS ID Resource Labor costs Physical costs Reserve Total estimate Basis of estimates Method Assumptions constraints Range Confidence level

www.stakeholdermap.com Page 2 of 3
Project Management resources

Duration estimation worksheet

Project Management Templates

The Top 50 Business Risks (and how to manage them)!

Issue Log Template [free download]

End Project Report Template

Risk Register Template

Stakeholder Management Templates

Work Breakdown Structure (WBS) template in Excel

www.stakeholdermap.com Page 3 of 3

You might also like