Standard Operating Procedure Calendar (Mechanical Finish)
Standard Operating Procedure Calendar (Mechanical Finish)
CALENDAR(MECHANICAL FINISH)
WORKING PROCEDURE:-
Operator will set the batch / trolley in the feeding section of the calendar &
stitch with the ladder cloth without Crease/Fold.
Set M/C condition i.e. Temperature of roll, Hydraulic Pressure, Required
width, bow, Skew & set as per GSM of the fabric.
Ensure M/C will be started as per the defined speed & all the set parameters
will be monitored for any fluctuation.
Before starting the M/C, ensure to clean all the parts and M/C.
To Check Required Hydraulic pressure before starting the M/C.
Before applying pressure rollers should be running to avoid impression on the
rollers.
Cross check all the safety equipment on a daily basis.
If Metal detector beeps and machine stops check and remove any metal parts
and check before starting machine again.
Don’t touch any of the moving parts of the running m/c, if required first stop
the m/c & put emergency lock.
Use the required safety equipment while running the M/C.
In the Guidance of shift supervisor set programme and run safely.
Before stopping the machine release the pressure of the rollers and then stop
the machine.