You are on page 1of 1

ANSWER KEY IN

WASTEWATER ENGINEERING
1. A. 14 hours
2. A. 9945 lbs. SS
3. C. 3156 lb./d
4. D. 5 in./d
5. D. 130 mL/min
6. A. 0.30
7. C. 3 mg/L
8. B. <2 mg/L
9. A. Soak-away
10. B. Sullage
11. B. National Sewerage and Septage Management Program
12. C. Fishy
13. A. Vermin Control
14. B. Septage
15. B. Sludge Volume Index
16. D. Sand filter
17. B. Potassium permanganate
18. A. Fixed solids
19. B. Methemoglobinemia
20. A. Infiltration
21. B. To the landfill
22. A. Clarifier
23. B. Short Circuiting
24. B. Virus
25. A. Chocolate brown
26. A. Small Diameter Effluent Sewers
27. C. Maturation Ponds
28. B. Environmental Sanitation Clearance
29. C. Stabilizing
30. C. Oxidation Ditch
31. A. Microfiltration
32. A. Mercaptans
33. D. Condominial Sewers
34. B. H2S
35. D. 90 – 95%
36. A. Paint Filter Test
37. B. Continuous Sampling
38. B. Flocculation
39. B. Aeration Basin
40. B. 3°C
41. B. Chloroform Extraction Method
42. B. 80-95%
43. C. Php 5.00; Php 5,000
44. D. Oxygen Uptake Rate
45. C. Specific Ion Electrode Method
46. A. pH
47. C. greater than 30 m3/d
48. A. Cobalt Thiocyanate Active Substance
49. A. Beggiatoa
50. B. Nitrobacter
51. C. Zooglea
52. C. Hard
53. D. Endogenous phase
54. A. Bulking sludge
55. D. 4
56. A. Schmutzdecke
57. B. Charles Law
58. A. 99.9%; 0.10%
59. D. Ozone
60. A. Load