Type of Data Upload at Time
of Final Preparation Stage
In ASAP Methodology : 

Which type of data is upload at the time of Final


preparation stage?

In my view Master datas any thing else (It is called


Cutover Period).
by : Ajay Sengar

Generally following data should be uploaded -

(1) Material Master

(2) Vendor Master

(3) Service Master

(4) Open Purchase Order 

(5) Open Purchase Request 

(6) Open Reservation

(7) Historical Data

(8)  Tax Master

(9) Any other documental transaction which is used in


your organisation like Gate pass, Scrap
related documents etc 

(10) All open transaction during cut over period which


will upload after Go Live

MM Related:

Automate
the opening of MM periods
Allow/Disallowed Backposting of Inventory
Posting
Movement
Error - Posting Only Possible Between

Get help for your SAP MM problems

SAP MM Forums
- Do you have a SAP MM Question?

SAP Material Management Books

SAP MM
Books - Certification, Interview Questions and Configuration

SAP Materials Management Tips

SAP MM Configuration
Tips and Materials Management Discussion Forum

Best regards,

SAP Basis, ABAP Programming and Other IMG Stuff

http://www.erpgreat.com
All the site contents are Copyright © www.erpgreat.com
and the content authors. All rights reserved.

All product names are trademarks of their respective


companies.  The site www.erpgreat.com is in no way affiliated with
SAP AG. 

Every effort is made to ensure the content integrity. 


Information used on this site is at your own risk. 

https://www.erpgreat.com/materials/type-of-data-upload-at-time-of-final-preparation-stage.htm 1/2

You might also like