You are on page 1of 1
SAFE SOIL AND FOUNDATION ENGINEERING SERVICES Geo-Technical Investigation, Project Manager, Pavement and Foundation Design, Asphaltic Mix Design, Concrete Mix Design, ‘Quality Control, Well Driling Piling, Pie & Pate Load Test, Geo Graphie Survey, Geo Physical Survey, Dewatering and Concrete Coving Mr. Raheel Ahmed SSINP/NPA/ 2.3 Principal Engineer Dated: 7-03-2023 Project Management & Airports Section, NESPAK, Lahore. Subject:- TIME EXTENSION REQUEST Project:- EXPANSION AND RENOVATION OF BEGUM NUSRAT BHUTTO (BNB) SUKKUR AIRPORT Dear Sir, W care writing this letter to again request you for the grant of time extension in the project. The delay in completion of the project is highlighted in your letter 4529/50K/RA/01/0633 dated 16 Feb 2023. The causes of this delay are numerous as listed below. ® Firsily, we have faced the initial delay due to the strict security clearance issues of our different working staff from the airport security team. «Secondly, due to rainfall, the work has been stopped for 3 to 4 days. Then, we also suffered to get few test pits location to execute the work. © Thirdly, due to the specific nature of the project as you know that we had to face the time restrictions on the work imposed by the PAF guidelines, which allowed work only from 9 am to 4 pm. ‘These are the reasons for the delay in field work , while the delay by the Soil Con and CU Tri-axial test in NUST is due to your approved Laboratories should not be considered in our time frame as we have submitted them the samples and paid the charges timely. Due to above mentioned reasons, we humbly request you to grant time extension to us. We shall be highly thankful to you. ‘Assuring you our best technical services. House No. 17, Block-H, Aiteheson Housing Society, O17 Phone & Fax: 04 10718, Cell: 0 Email-safeservices725@ gmail.com Web: www.saleservie

You might also like