MOPNO.:
M-ERI-0168720
Job Numbers:
J-ZRH229-0000081
J-ZRH229-0000082
J-ZRH229-0000083
J-ZRH229-0000084
J-ZRH229-0000085
NRT-V-March2021
LTE SITE CHANGE ORDER
Wireless Network Design
Approval
ASIF T. MUHAMAD Ahmed Mohammed Elokr Ahmed Mohammed Elokr
Requested by Team Leader Manager
Date 17-JUL-22 Date 20-JUL-22 Date 20-JUL-22
LTE SITE CHANGE ORDER
Wireless Network Design
Approval
ASIF T. MUHAMAD Ahmed Mohammed Elokr Ahmed Mohammed Elokr
Requested by Team Leader Manager
Date 17-JUL-22 Date 20-JUL-22 Date 20-JUL-22
3G SITE CHANGE ORDER
Wireless Network Design
Ref No 208613 Site Id ZRH229
Revision of SCO No Dept. RF Design
Region Central Site 900 ZRH229
District Riyadh City Site 3G 900 HRH229
Area Riyadh City Site 3G 2100 GRH229
Site Address Al Rabwah Frequence Band 900MHz & 3G
Location Name Al Rabwah Site Type Macro
Location Type City Vendor Ericsson
Latitude 24.6856 Project 5G4
Longitude 46.76164 Phase .
UMTS 900 Existing Configuration UMTS 2100
Cell Id HRH229A HRH229B HRH229C
Antenna Type EGZV5-65D-R6EGZV5-65D-R6EGZV5-65D-R6
No. of Antennas 0 0 0
Antenna Azimuth 30 150 270
Mechanical Tilt 0 0 0
Electrical Tilt 4 4 4
Antenna Height 25.6 25.6 25.6
No. of Carriers 2 2 2
No. of Combiners
Combiner Types
MCPA NO NO NO
RET Yes Yes Yes
TMA No No No
Approval
ASIF T. MUHAMAD Ahmed Mohammed Elokr Ahmed Mohammed Elokr
Requested by Team Leader Manager
Date 17-JUL-22 Date 20-JUL-22 Date 20-JUL-22
SITE CHANGE ORDER
Wireless Network Design
No. of Antennas 1 1 1
Antenna Orientation 30 150 270
Mechnical Tilt 0 0 0
Electircal Tilt 4 4 4
Antenna Height 25.6 25.6 25.6
No. RTs 4 4 4
No. Combiners
Combiner Types
MCPA NO NO NO
No. of Antennas 1 1 1
Antenna Orientation 30 150 270
Mechnical Tilt 0 0 0
Electircal Tilt 4 4 4
Antenna Height 25.6 25.6 25.6
No. RTs 4 4 4
No. Combiners
Combiner Types
MCPA NO NO NO
Approval
ASIF T. MUHAMAD Ahmed Mohammed Elokr Ahmed Mohammed Elokr
Requested by Team Leader Manager
Date 17-JUL-22 Date 20-JUL-22 Date 20-JUL-22
SITE CHANGE ORDER
Comments
Wireless Network Design
Last Comments
SCO Issued under 5G-Phase4 Project for N40 4T4R Collocation,
* TDD downgrade to 2/2/2 Carrier 35MHz.
* 3x4418 and BB6630 reconfigure from TDD to N40 4T4R.
* LTE-700 Collocation 30Mhz with 3x2219
* NB-IoT transfer from L-1800 to L-700
Please view details in relevant technology part of SCO.
Old Comments
Reviewer Comment
VENDOR LOGO
Site Installation Inspection Checklist
Project Name: 5G 2022 - 5G4 - Access
1. Mechanical Installation
1.01 gNodeB BBU/AirScale / System Module / FSMF / DCDU Cabinet √ OK □ NOK □ N/A
2.06 There are no fingerprints or other smears on the surface of the cabinet. √ OK □ NOK □ N/A
2.07 There are no excessive straps or adhesive tape on the cables. √ OK □ NOK □ N/A
2.08 No tapes, tails of cable ties, paper, or packing bags are left around the cabinet. √ OK □ NOK □ N/A
3. Mechanics:
3.03 The cabinet is not distorted. Paint on the cabinet surface is in good condition. √ OK □ NOK □ N/A
Connection between the cabinet and the base is secure. The cabinet stands still
3.05 √ OK □ NOK □ N/A
after installation.
No cable ties, cables, or desiccants are left in the cabling frame, under or inside
3.06 √ OK □ NOK □ N/A
the cabinet.
The cabinet is clean and neat with external paint in good condition. All labels,
3.07 √ OK □ NOK □ N/A
tags, and nameplates are correct, legible, and complete.
3.08 No tapes, tails of cable ties, paper, or packing bags are left around the cabinet. √ OK □ NOK □ N/A
NRT-V-March 2021
4. BBU / AirScale
4.01 The BBU / AirScale is placed according to design drawings. √ OK □ NOK □ N/A
4.03 The Grounding location is right. Use 6mm grounding cable. √ OK □ NOK □ N/A
4.07 Power cable of BBU / Air Scale is connected to Load of DCDU / FPFH √ OK □ NOK □ N/A
5. DCDU / FPFH
5.01 The DCDU / FPFH is placed according to design drawings. √ OK □ NOK □ N/A
5.02 The breaker or the fuse is placed according to design drawings. √ OK □ NOK □ N/A
5.04 The Grounding location is right. Use 6mm grounding cable. √ OK □ NOK □ N/A
6. AAU / AEQD
6.01 The RRU/AAUs/ AEQD are placed according to design drawings. √ OK □ NOK □ N/A
6.03 The RRU/AAU/ AEQD Grounding location is right. Use 16mm grounding cable. √ OK □ NOK □ N/A
6.05 The OCB Grounding location is right. Use 25mm grounding cable. □ OK □ NOK √ N/A
6.06 The metal shield of the power cable is grounded inside the OCB. □ OK □ NOK √ N/A
Power cable is grounded (RRU/AAU/AEQD end): Grounded with metal shield inside the
6.08 √ OK □ NOK □ N/A
RRU/AAU cabling cavity.
6.09 Power cable is grounded (Grounding bat of Roxtec): Grounding with lightning proof clip. √ OK □ NOK □ N/A
6.1 The cover plate for the cabling cavity is securely installed. √ OK □ NOK □ N/A
6.11 Waterproof blocks are securely installed in vacant troughs of the RRU/AAU/AEQD √ OK □ NOK □ N/A
The vacant RF ports of RRU/AAU / AEQD are covered with waterproof caps and
6.12 √ OK □ NOK □ N/A
waterproofed.
6.14 7/8, 13/8 feeders are fitted with feeder clip. □ OK □ NOK √ N/A
6.17 Feeder installation for site operating with CPRI Optic Fiber should be marked as N/A □ OK □ NOK √ N/A
NRT-V-March 2021
7. GPS
7.01 The GPS are placed according to design drawings. □ OK □ NOK √ N/A
The arrester is grounded with the same grounded with the same ports of BBU. Use 6mm
7.03 □ OK □ NOK √ N/A
grounding cable.
7.04 The arrester is not touched with the cable tray. □ OK □ NOK √ N/A
7.05 The connectors of the feeders and jumpers are waterproof. □ OK □ NOK √ N/A
8. Antenna
8.01 The antennas are placed according to design drawings. √ OK □ NOK □ N/A
8.03 SBT, RCU are installed as design and cables are connected correct. □ OK □ NOK √ N/A
8.04 Jumpers, SBT, and RCU are well waterproofed. √ OK □ NOK □ N/A
8.05 The vacant RCU ports are securely covered. □ OK □ NOK √ N/A
The vacant RF ports of antenna are waterproofed. The vacant RET ports are securely
8.06 √ OK □ NOK □ N/A
covered.
9.03 Fibers between BBU /FSMF /System Module AirScale and RRU/AAU/AEQD √ OK □ NOK □ N/A
Remarks:
Vendor Representative: STC \ O&M Representative:
Date: Date:
NRT-V-March 2021
VENDOR LOGO
Acceptance Test
Work Type:
LTE700 Collocated (30Mhz)
Site No.: ZRH229 with IoT
Acceptance Tests
A. Site completion checklists
Date: Date:
PAGE 1
NRT-V-March 2021
VENDOR LOGO
ACCEPTANCE TEST
J-ZRH229-0000081,J-ZRH229-0000082,J-ZRH229-0000083,J-ZRH229-0000084,J-ZRH229-
JOB No:
0000085
Antenna Numbers 0 0 0 0 0 0
Antenna MDT 0 0 0 0 0 0
DATE: DATE:
PAGE 2
NRT-V-March 2021
VENDOR LOGO
ACCEPTANCE TEST
Project Name: 5G 2022 - 5G4 - Access Site Number: ZRH229
J-ZRH229-0000081,J-ZRH229-0000082,J-
Job Number : ZRH229-0000083,J-ZRH229-0000084,J-ZRH229- Work Type: LTE700 Collocated (30Mhz) with IoT
0000085
1 CPRI Port for RBS ; 3 CPRI Ports for RRUS ;up to 6 CPRI ports for
RBS Radio Type:
RUS
Optical Parameter check of Optical Modules on CPRI interfaces (test via logs on OSS)
Optical Interface Parameters CPRI 0 (TX1) CPRI 1(TX2) CPRI 2(TX3) CPRI 3(TX4) CPRI 4(TX5) CPRI 5(TX6)
DATE : DATE :
PAGE 3
NRT-V-March 2021
ALT
ASHFAQ
ASHFAQ
ANTENNA MODEL
ASHFAQ
ASHFAQ
RSSI
ASHFAQ
ASHFAQ
SLOTE LAYOUT / RRU LAYOUT / VSWR
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
SFP INFO
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
PING TEST
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
5G PHASE 4 PROJECT
ERICSSON
Submittal No. : ERI-C22-ZRH229
MOP No. : M-ERI-0166794
Date : 28-Sep-2022
Project Title : 5G PHASE 4 PROJECT
Package Name : FINAL DETAILED ENGINEERING DESIGN (FDED) REV. B
Job No.1 : J-ZRH229-0000080
Site No. / Name : ZRH229 / EXISTING ZAIN SITE ID (2093) / RIYADH
No. of Copies :1
Vendor : ERICSSON
Description :
Final Detailed Engineering Design (FDED) for Site No. ZRH229 (ZAIN ID: 2093) Rev. B
Site Information:
Site Model: GF Tower Height: 30.0M Tower Supply: ZAIN Tower Type : ZAIN MOSAIC
TOWER
Shared with : ZAIN+ Shelter: ODU (RBS6102) Power Sup.:. SCECO HVAC: BUILT IN
MOBILY
Site Dimensions: 7X7 Recitifer: PSU/ 8X52A (EXISTING) Battery: 4X180AH (MISSING)
Area of used antenna or MW (EPA)/m2 : Top : 21.651M2 Middle : 0M2 Lower: 0M2
SAF no. N/A TCC No. N/A SCO no. 208613 NSCO no.
Attention : Design Manager
Wireless Network Implementation
For ERICSSON
Date : Name : Hassan Zobie Signature :
Comments :
Signature
Wireless Network Implementation Design Manager
Name :
Date :
Signature :
REV DATE DESCRIPTION
REVISIONS
5G PHASE-4 PROJECT
SCO REF NO. 205586.
ZRH229-ERI-Dc-0001
REV DATE DESCRIPTION
REVISIONS
5G PHASE-4 PROJECT
SCO REF NO. 205586.
ZRH229-ERI-Dc-0001
REV DATE DESCRIPTION
REVISIONS
5G PHASE-4 PROJECT
ZRH229-ERI-Fd-0001 A
REV DATE DESCRIPTION
REVISIONS
5G PHASE-4 PROJECT
ZRH229-ERI-Fd-0002 A
REV. DATE DESCRIPTIONS
REVISIONS
CONFIDENTIALITY:
5G PHASE-4 PROJECT
CHECKED QUALITY:
ZRH229-ERI-FP-0001 A
APPROVED:
REV. DATE DESCRIPTIONS
REVISIONS
CONFIDENTIALITY:
5G PHASE-4 PROJECT
CHECKED QUALITY:
ZRH229-ERI-FP-0002 A
APPROVED:
REV DATE DESCRIPTION
REVISIONS
CONFIDENTIALITY:
5G PHASE-4 PROJECT
ZRH229-ERI-De-0001 A