MOPNO.:
M-ERI-0172378
Job Numbers:
J-ZRH080-0000182
J-ZRH080-0000183
J-ZRH080-0000184
J-ZRH080-0000185
J-ZRH080-0000186
NRT-V-March2021
SITE CHANGE ORDER
Wireless Network Design
No. of Antennas 1 1 1
Antenna Orientation 30 150 270
Mechnical Tilt 0 0 0
Electircal Tilt 4 4 4
Antenna Height 34 34 34
No. RTs 4 4 4
No. Combiners
Combiner Types
MCPA NO NO NO
No. of Antennas 1 1 1
Antenna Orientation 30 150 270
Mechnical Tilt 0 0 0
Electircal Tilt 4 4 4
Antenna Height 34 34 34
No. RTs 4 4 4
No. Combiners
Combiner Types
MCPA NO NO NO
Approval
Jamel Eddine Kherous Ahmed Mohammed Elokr Ahmed Mohammed Elokr
Requested by Team Leader Manager
Date 20-DEC-22 Date 25-DEC-22 Date 25-DEC-22
LTE SITE CHANGE ORDER
Wireless Network Design
Last Comments
SCO Issued under 5G-Phase4 Project.
* LTE-700 Collocation 30Mhz with 3x2219
* NB-IoT added on L700
Old Comments
Reviewer Comment
VENDOR LOGO
Site Installation Inspection Checklist
Project Name: 5G 2022 - 5G4 - Access
1. Mechanical Installation
1.01 gNodeB BBU/AirScale / System Module / FSMF / DCDU Cabinet √ OK □ NOK □ N/A
2.06 There are no fingerprints or other smears on the surface of the cabinet. √ OK □ NOK □ N/A
2.07 There are no excessive straps or adhesive tape on the cables. √ OK □ NOK □ N/A
2.08 No tapes, tails of cable ties, paper, or packing bags are left around the cabinet. √ OK □ NOK □ N/A
3. Mechanics:
3.03 The cabinet is not distorted. Paint on the cabinet surface is in good condition. √ OK □ NOK □ N/A
Connection between the cabinet and the base is secure. The cabinet stands still
3.05 √ OK □ NOK □ N/A
after installation.
No cable ties, cables, or desiccants are left in the cabling frame, under or inside
3.06 √ OK □ NOK □ N/A
the cabinet.
The cabinet is clean and neat with external paint in good condition. All labels,
3.07 √ OK □ NOK □ N/A
tags, and nameplates are correct, legible, and complete.
3.08 No tapes, tails of cable ties, paper, or packing bags are left around the cabinet. √ OK □ NOK □ N/A
NRT-V-March 2021
4. BBU / AirScale
4.01 The BBU / AirScale is placed according to design drawings. √ OK □ NOK □ N/A
4.03 The Grounding location is right. Use 6mm grounding cable. √ OK □ NOK □ N/A
4.07 Power cable of BBU / Air Scale is connected to Load of DCDU / FPFH √ OK □ NOK □ N/A
5. DCDU / FPFH
5.01 The DCDU / FPFH is placed according to design drawings. √ OK □ NOK □ N/A
5.02 The breaker or the fuse is placed according to design drawings. √ OK □ NOK □ N/A
5.04 The Grounding location is right. Use 6mm grounding cable. √ OK □ NOK □ N/A
6. AAU / AEQD
6.01 The RRU/AAUs/ AEQD are placed according to design drawings. √ OK □ NOK □ N/A
6.03 The RRU/AAU/ AEQD Grounding location is right. Use 16mm grounding cable. √ OK □ NOK □ N/A
6.05 The OCB Grounding location is right. Use 25mm grounding cable. □ OK □ NOK √ N/A
6.06 The metal shield of the power cable is grounded inside the OCB. □ OK □ NOK √ N/A
Power cable is grounded (RRU/AAU/AEQD end): Grounded with metal shield inside the
6.08 √ OK □ NOK □ N/A
RRU/AAU cabling cavity.
6.09 Power cable is grounded (Grounding bat of Roxtec): Grounding with lightning proof clip. √ OK □ NOK □ N/A
6.1 The cover plate for the cabling cavity is securely installed. √ OK □ NOK □ N/A
6.11 Waterproof blocks are securely installed in vacant troughs of the RRU/AAU/AEQD √ OK □ NOK □ N/A
The vacant RF ports of RRU/AAU / AEQD are covered with waterproof caps and
6.12 √ OK □ NOK □ N/A
waterproofed.
6.14 7/8, 13/8 feeders are fitted with feeder clip. □ OK □ NOK √ N/A
6.17 Feeder installation for site operating with CPRI Optic Fiber should be marked as N/A □ OK □ NOK √ N/A
NRT-V-March 2021
7. GPS
7.01 The GPS are placed according to design drawings. □ OK □ NOK √ N/A
The arrester is grounded with the same grounded with the same ports of BBU. Use 6mm
7.03 □ OK □ NOK √ N/A
grounding cable.
7.04 The arrester is not touched with the cable tray. □ OK □ NOK √ N/A
7.05 The connectors of the feeders and jumpers are waterproof. □ OK □ NOK √ N/A
8. Antenna
8.01 The antennas are placed according to design drawings. √ OK □ NOK □ N/A
8.03 SBT, RCU are installed as design and cables are connected correct. □ OK □ NOK √ N/A
8.04 Jumpers, SBT, and RCU are well waterproofed. √ OK □ NOK □ N/A
8.05 The vacant RCU ports are securely covered. □ OK □ NOK √ N/A
The vacant RF ports of antenna are waterproofed. The vacant RET ports are securely
8.06 √ OK □ NOK □ N/A
covered.
9.03 Fibers between BBU /FSMF /System Module AirScale and RRU/AAU/AEQD √ OK □ NOK □ N/A
Remarks:
Vendor Representative: STC \ O&M Representative:
Date: Date:
NRT-V-March 2021
VENDOR LOGO
Acceptance Test
Work Type:
LTE700 Collocated (30Mhz)
Site No.: ZRH080 with IoT
Acceptance Tests
A. Site completion checklists
Date: Date:
PAGE 1
NRT-V-March 2021
VENDOR LOGO
ACCEPTANCE TEST
J-ZRH080-0000182,J-ZRH080-0000183,J-ZRH080-0000184,J-ZRH080-0000185,J-ZRH080-
JOB No:
0000186
Antenna Numbers 0 0 0 0 0 0
Antenna MDT 0 0 0 0 0 0
DATE: DATE:
PAGE 2
NRT-V-March 2021
VENDOR LOGO
ACCEPTANCE TEST
Project Name: 5G 2022 - 5G4 - Accesse Site Number: ZRH080
J-ZRH080-0000182,J-ZRH080-0000183,J-
Job Number : ZRH080-0000184,J-ZRH080-0000185,J-ZRH080- Work Type: LTE700 Collocated (30Mhz) with IoT
0000186
1 CPRI Port for RBS ; 3 CPRI Ports for RRUS ;up to 6 CPRI ports for
RBS Radio Type:
RUS
Optical Parameter check of Optical Modules on CPRI interfaces (test via logs on OSS)
Optical Interface Parameters CPRI 0 (TX1) CPRI 1(TX2) CPRI 2(TX3) CPRI 3(TX4) CPRI 4(TX5) CPRI 5(TX6)
DATE : DATE :
PAGE 3
NRT-V-March 2021
ALT
ASHFAQ
ASHFAQ
ANTENNA MODEL
ASHFAQ
ASHFAQ
RSSI
ASHFAQ
ASHFAQ
SLOT LAYOUT / RRU LAYOUT /VSWR
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
SFP INFO
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
PING TEST
ASHFAQ
ASHFAQ
ASHFAQ
ASHFAQ
REVISIONS
CONFIDENTIALITY:
REV. DATE DESCRIPTIONS
REVISIONS
CONFIDENTIALITY:
5G PHASE 4 PROJECT
TITLE: ZRH080