Professional Documents
Culture Documents
ESG Power Equipment BOATMAN TRAINING POWERPOINT B-23
ESG Power Equipment BOATMAN TRAINING POWERPOINT B-23
FOOTING
DEBRIS
CHEMICAL, OIL - SLIPPERY
ALWAYS CONDUCT A TAILGATE
SAFETY MEETING TO OUTLINE THE JOB
BEFORE BEGINNING.
PLUNGER WATER
LUBRICATION
CONTROL
HIGH PRESSURE GAUGE
EVALUATE THE
AMOUNT OF DEBRIS
IN THE BAG
• PRE-OPERATION:
WASH THE FILTER BAG
(INSIDE OUT) AS REQUIRED
AND REPLACE IN THE
CANISTER.
PRE-OPERATION
BLEED ALL AIR FROM
THE WATER FILTER
THROUGH THE
PETCOCK ON THE
FILTER LID OF THE
FILTER CANISTER
PRE-OPERATION
ADJUST PLUNGER
LUBRICATION WATER
• ADJUST WATER FLOW TO
THE PLUNGERS TO:
• A LIGHT CONTINUOUS
FLOW OF WATER.
PRE-OPERATION
CHECK ENGINE OIL
• CONNECT HOSE TO THE PUMP DISCHARGE
START ENGINE
CRANK ENGINE BY
MOVING THE THROTTLE
FORWARD ABOUT I” AND
PUSHING THE STARTER
BUTTON UNTIL THE
ENGINE STARTS
THROTTLE
AFTER ENGINE START
TURN ON ELECTRIC
CHARGE PUMP
CHARGE PUMP
CHARGE PUMP
ON/OFF SWITCH
CONNECT WATER SOURCE
INLET WATER
CONNECTION
CONNECT DISCHARGE HOSE
PREPARING FOR BLASTING
ENGAGE CLUTCH – PUSH FORWARD
TOWARD ENGINE (AFTER STARTING
ENGINE)
CLUTCH HANDLE
CLUTCH IS
ENGAGED WHEN
A SOLID “CLICK”
IS FELT.
PREPARING FOR BLASTING
AT IDLE, FLOW WATER THROUGH THE
HOSES TO FLUSH ANY FOREIGN MATTER
DISENGAGE CLUTCH
WARNING
WATER ESCAPING FROM A LEAK HAS THE SAME
CUTTING POWER AS THE WATER EXITING THE
NOZZLE AT THE END OF THE DUMP GUN.
UPON COMPLETION OF WORK
PULL THE THROTTLE BACK
SLOWLY TO REDUCE THE
ENGINE RPM TO IDLE TO
ALLOW A COOL DOWN
PERIOD FOR THE ENGINE
(APPROXIMATELY 5
MINUTES)