Our ref : JC105SOLARVEST/KKSB/EP/23-108

Date : 01 April 2023

ECONPILE (M) SDN BHD


Level 8 Tower Block
Plaza Dwitasik
Jalan Sri Permaisuri
Bandar Sri Permaisuri
56000 Kuala Lumpur
(Attn: Mr. Thiban Arnasalam)

Dear Sir,

CONSTRUCTION AND COMPLETION OF PILING AND BASEMENT STRUCTURE WORKS FOR


CADANGAN MEMBINA SATU BANGUNAN PEJABAT 34 TINGKAT YANG MENGANDUNGI:-
• 3 TINGKAT KEMUDAHAN, MEDAN SELERA DAN M&E DI TINGKAT 30, 31 DAN 32
• 28 TINGKAT RUANG PEJABAT PADA TINGKAT 2-29
• 5 TINGKAT TEMPAT LETAK KERETA MEKANIKAL DI SEBAHAGIAN TINGKAT 1-5
• 1 TINGKAT M&E DI TINGKAT 1
• 2 TINGKAT LOBI PADA ARAS TANAH AND MEZANIN
• 5 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DI TINGKAT B1-B5
• SEBUAH JEJAMBAT YANG MENGHUBUNGKAN LOT 480578 & LOT 480786
DI ATAS LOT 5772 (PT9111) (TERKINI LOT 481445), JALAN KERINCHI KIRI, MUKIM KUALA
LUMPUR, DAERAH KUALA LUMPUR, WILAYAH PERSEKUTUAN, KUALA LUMPUR UNTUK TETUAN BK
ALLIANCE SDN BHD

Substructure Works: Revised Work Programme – Request for a detailed catch-up plan
______________________________________________________________________________________________________________

References are made to Client Site Meeting No. 25 held on 31-03-2023 and further discussion with
the Clerk of Works (Mr. Gerald Yew) and you earlier today in connection with the above subject.

You are hereby requested to submit a detailed catch-up plan based on your revised work
programme as the project is currently running behind schedule by 5% (19.1 days). Please include
the details of lift pile cap, retaining wall and lift wall joining each level of basement slab besides
adjusting the start and finish dates of outstanding tasks to complete and hand over by 22-07-2023.

Please submit by 04-04-2023 for our further action.

Thank you.

Yours faithfully,
Kayangan Kemas Sdn Bhd

___________________
Yeoh Hung Ling
(Project Manager)