You are on page 1of 4
NAME OF WORK : Plan Showing the Proposed Ground Floor R.C.C Terraced Building. At (R.S.F. No : 403/10) DTCP No : 2369/2020/A3 , At Plot No : 5 South Part, Bhavani village Thottiyapalayam panchayat limit, Bhavani taluk and sub divition, Erode (DT). APPLICANT 1: THIRU.KUBERAN.S S/O THIRU.SWAMINATHAN, APPLICANT 2: TMT.DEVI.K S/O THIRU.KUBERAN.S Estimate Amount = Rs, 23,00,000.00/- (Rupees Twenty Three lakh Only) S.No. Description Nos. | Length [Breadth] Depth | Quantity] Rate |Per| Amount lEarih work Excavation For Foundation 8| [Basement in all soils except hard rock| requiring blasting etc. Including filing lwatering, consolidating etc. as _per| \Standard Specification [Main walls 1x 1] 70.93] 090) 1.37) 87.46 IRcc Column 1x 15] 4.00] 1.22] 2.13| 38.98 126.44] [Deductions IRcc Column 1x 15] 1.00] 090) 137) 18.0 GL 18.89] 407.94) 660.00|M° | 70161.45 2|Providing and laying Cement Concrete| 1:5:10, using 40mm Hard Blue Granite| ‘Stone jelly for Foundation and Flooring including curing etc. complete as per| |Standard Specifications IMain walls 1x 1] 7093] 090} 0.15] 9.58 RCC Column 1x 45] 100] 1.22) 0.18| 2.75 12.32| Deductions IRCC Column 1x 18] 1.00] 0.90] 018] 2.03] ©L__ 2.03] 10.30] 3000.00|vr | 30886.65, 3|Suppling and Filling in basement with] Iriver sand to basement including} lwatering, Consolidation etc, as pef| \Standard Specifications Halt 1x 1] 487] 675] 061] 2008 Dining cum kitchen 1x 1] 487] 3.05] 061] 9.08 IBed & Toilet 1x 2] 305) 6.55] 61] 24.37 led 1x 1] 487] 3.05] 61] 9.06 62.65] 2260.00|ue | 140728.60 4 [Brick wotk in em 1:5 using chamber burnt I class briéks of size 23x 11x7 cm the| lcost including cost of materials and| labour charges etc. complete Main walls 1x 4] 70.93) 0.23) 305] 49.76| 1/2 Brick walls 1] 6.40] 015] 3.05] 2.93] Parapet walls 4x 4] 4388) 023) o91| 918 61.87| IDeductions. IRCC Columns 1x 15] 0.23] 0.38) 3.96] 5.19 [Door - > x 4] 1.00] 023) 213) 1.96 ee os ee Page 1 of 4 S.No. Description [Door - Dt lopen 0 |Window - w Window - wi Jventilator - V IRC. 1:24 using 20mm HGB metal for lintel cum Sunshade including centering land labours charges etc., completed IGrade Beam Plinth Beam Lintel in Main walls Lintel in 1/2 brick walls IRCC Column Footing (Square) IRCC Column Footing (Pedastal) IRCC Column Footing (Pedastal) RCC Columns (Upto Terrace) Lott [Sunshade IR.C.C. 1:2:4 using 20mm HGB metal for] Roof slab including centering and labours| Icharges etc., completed RCC Roof stab Providing for Normal Country wood| Doors, Windows and __Ventlators| lincluding material cost, labour charges| land fixing charges ete. Complete IDoor- 0 IDoor - D1 Window - W lwindow- W1 Ventilator -\V Plastering with cement mortar 4:5, 12mm] thick the cost including cost of materials land labour charges etc. completed {Main walls 1/2 Brick walls Parapet Walls Deductions. Door -D Door - D1 lopen= 0 Window «: Ww Window - Wt IProvision for finishing the RC.C| lsurfaces with special Ceiling Plastering Iwith CM 1:3. 10mm thick the cost including the cost of materials and labour| |charges etc. completed. Hall kitchen cum Dining Leone Py Ae Ol wie Nos. 45 19 15 45 Length o76| 1 1.52 091 091 70.93; 70.93} 70.93| 6.49] 0.91 0.87| 0.69| 0.23| 14.94] 15.76| ast 1.09} 0.76 1.52] ot 0.9 70.93} 6.49] 43,88 1.00 o76| 0.91 1.52] 091 487| Breadth] 0.15} 0.23] 0.23} 0.23} 0.23} 0.23} 0.23} 0.23} 0.15} 1.00} 0.16} 0.17] 0.38} 0.46} 0.48} 13.79] 6.75 47| 3.05| Depth 2.43) 213 1.37 1.37 0.45} 0 0.46] 0.23 0.15 0.15 0.23 0.46 0.46 6.47] 0.19) 0.10) Quantity 0.49} 0.45] 2.87] 1.15] o.t9} 12.29] 49.88; 7.50| 3.75| 2.45| o.t4| 3.14] 1.26| 1.62| 8.43| 0.69] 072| 29.76| 0.12] 2.13] 2.13} 1.37] 1.37 0.45| 3.05] 3.05] 0.91 14.25| 14.28 | 6.39] 3.24] 12.49 4,99| 0.82| 27.93] 432.67| 39.04] 79.86| 551.57 | 2.13 2.13] 2.13 1.37] 1.37] 0 17.04 6.48] 3.88] 24,99) 9.97] 62.35) 489,22| 32.87| 14.85| Rate | Per 2500.00) ve 5870.00/N 7668.00)" 5436.00)" 670.00|1* Amount 123944.56 174684.43 75632.98 16181652 32777787 Page 2 of 4 S.No Description Nos. | Length Depth | Quantity Amount iBed ~ Tx 2] 305 2371 IBed txt] 487 14.85] Hroilet 1x 2] 308 9.27] Lon 1x1] 14.94 15.24] ISunshade 1x 1] 15.76 16.08] 132.87 116927.80 0|Fiooring concrete P.C.C 1:5:10 using J4omm HGB Metal for 10em thick for al Jfooms including cost of materials and| labour charges etc., complete al 1x1] 4e7| oro] 3.29 Kitchen cum Dining 1x a] 487 10] 1.49 Bed & Toilet 1x 2] 3.05| 010] 4.00 lBed 1x i] 437 o.to|___1.49 10.25| 1267.28 11)Provision for Fioor Finishing with Vertiied [Tiles, including cost of materials and] labour charges etc., complete Halt 1x4] 487] 3287 kitchen cum Dining txt] 487 14.85} Bed 1x 2] 305 29.71 Toit 1x 2] 305 9.27 lbed txt] 4e7 14.85] 101.56| 96490.58 12|Provision for White Washing with two] Icoats, the cost including cost of Imaterials, cum, cunjee, water, blue, powder, scoffolding etc. completed., with lstandard Specifications, /As Per item No:09 1 x 4] 489.22] 489.22 /As Per item No:10 x 4] 432.087 132.87 622.09] 7761.61 13)Painting works with two coats over the lnewly primer coats including cost of paints, materials and labour charges etc. lcompleted |As Per Iter No: 8x2 x 2] 2793 55.86| 55.86 36028.88, 14|Providing Weathering coarse with brick lily and lime concrete, well beaten with lwooden beaters with necessary slope| land top plastered with C.M. 1:4 with lcrude oil as per standard specifications lopen Terrace Hx 4] ats 0.10] 10.86] 10.86| 491263.00 15)Provision for Septic Tank and Sanitary| biptetme arrangemetns, the cost including cost of materials and labour charges etc. lcompleted {3.00 % of Estimate cost Ls. 0000.00 IProvision for Electrification, the cost Including cost of materials, labour harges, etc., complete 00 % of Estimate cost lus. 4188297 17 [Provision for Over ead sintex tank, the} cost including cost of materials, labour charges, etc., completed Ls. 9000.00 Kuberan Dev) 8.01.23.xls Page 3 of 4 S.No Description Nos. Length 'Breadth| 19 20 2 22| 23] IProvision for Under Ground Sump, the| Cost including cost of materials, labour charges, etc., completed, Provision for Borewell_ & — motor ‘Arrangements, the cost inciuding cost of| ‘materials, labour charges, et, ‘completed. [Provision for Front Teak wood door] (Arrangements, the cost including cost of| ‘materials, labour charges, et, Icompleted, Provision for Wall tiles Arrangements in| kitchen & Bath, the cost including cost of materials, labour charges, etc. |completes. [Provision for Compound wall and Steel |Gate, the cost including cost of materials, | labour charges, etc., completed |Add for the unforce seen items the| [basement of water sputs, steps, outside| lof plastering etc., complete. Ls. Ls. Ls. Ls. Ls. Ls. Depth | Quantity! Rate | Per! Amount 5723.00 82458.00 163980.08, 88827.00 2000.00 2300000.00 (Rupees Twenty Three Lakh only) Place : Erode Date : Kuberan Devi 8.0123.xle. 2 3. UNEP R ST. 8.€ (one, aster Diplamo CADD in Buildin. Ghavarin38 304 TAU. Aligie S308 Page 4 0f 4.

You might also like