You are on page 1of 6
By Speed Post TAMILNADU POLLUTION CONTROL BOARD Proc. No. TS/TNPCB/F-27895/KMP/W/2023, dated : 03.04.2023 Sub: TNPCB - Industries — Mis.Senthilkumar Textiles, T.S. No: 22/1 & 3A4, Kumarapalayam Agraharam Village, Kumarapalayam Taluk, Namakkal District - 638 183- Direction issued for revocation of closure direction and restoration of power supply under Section 334 of the Water (P&CP) Act, 1974 as amended — Orders issued — Reg Ref: 1. Board Proc. No. T5/TNPCB/F-27895/KMP/W/2022-1, dated. 02.12.2022 2. DEE/KMP, IR. No. F. KMP0105/DEE/TNPCB/KMP/RS/2023, dt. 08.03.2023 3. Unit letter dated Nil for remittance of Environmental Compensation of Rs.2,30,000/-vide Receipt Voucher No.2 dated 03.04.2023 Whereas, the Board had issued direction for closure and disconnection of power supply to the unit of M/s.Senthilkumar Textiles, T.S. No: 22/1 & 3A4, Kumarapalayam Agraharam Village,Kumarapalayam Taluk, Namakkal District - 638 183 vide reference first cited for the reasons stated therein. Thereafter, the power supply to the unit was disconnected on 08.12.2022 by TANGEDCO. Now, the unit vide its letter dated 27.02.2023 has requested the DEE, TNPCB, Kumarapalayam to issue revocation of closure order and restoration of power supply issued to the unit. Based on that, the unit was inspected on 02.03.2023 by DEE/Kumarapalayam and reported the following:~ 1. During inspection, the unit was not in operation due to disconnection of power supply 2. The unit is consented to carry out Bleaching and dyeing of Cotton yarn, Bleaching and dyeing of cotton fabric by using winch machineries. 1) Details of Machinerie a. Bleaching and dyeing of Cotton fabric - 15 T/M I ity No. | Total MC Total ie ae | SI. | Machine [Capacit of | capacity in No. °F | production Total production No} Details | inks | qc Ka lots Pkg iday._T/Month (26 days) 1_| Utype 400 4 400 { 2 | Winch 150 [4 150 ed pce Je | b. Bleaching and dyeing of Cotton yarn— 15 T/Month: Manual dyeing activity is not carried out Il) Details of water consumption and waste water generation: Activity —=«|s Total Production | MLR | No. of ity of effluent Kgiday | bath | generation in KLD Bleaching and dyeing of Cotton 550 1 | 10 44.0 fabric (U-type winch) leg ~~ Floor washing T 10 ser oe Total emdeOr. "| ~The unit is manufacturing Bleaching and Dyeing of Cotton Fabric — 14.3 T/Month and to generate 45.0 KLD of trade effluent which are at par with consented capacity of 50 KLD POLLUTION PREVENTION PAYS TAMILNADU POLLUTION CONTROL BOARD 3. The unit has obtained Authorization under Hazardous and other wastes (M&TM) Rules, 2016 for generation Collection, storage, transport and disposal of Hazardous waste 12 TINear for disposal of hazardous waste for Co-processing in authorized Cement Kiln vide Proc. No. dated 06.11.2019 valid up to 05.11.2024. The unit has provided ETP, RO | stage, Il stage, Ill stage, Nano Filtration & SEP with 50 KLD capacities and it is under operational condition. The unit has assured to operate the ETP, RO & RMS efficiently as per the consented capacity. a) Adequacy of RO system: Membrane | Volume | ] details of | | Feed | Actual it | Size | Nos effluent ee | | RO Unit KL ihr! thatean | fed | Permeate | Reject Remarks Membrane ‘°° is L handled | \aRor |, a=. 3 70 60 50 35 15 Adequate | Stage | dia (70%) | (30%) | | RoW |e [3 710 eo | 15 75 | 7.50 | Adequate | Stage | dia (50%) | 60%) | i Row |e | 2] 10 40 | 750 | 375 | 375 | Adequate Stage | dia (50%) | (50%) | Nano | 4" | 1 Os) 70 | 375 | 225 | 150 | Adequate | | Filtration dia (60%) | (40%) J b) Solar Evaporation pa Quantity of final reject 1.50 KLD. Solar Evaporation pan area required —_: 0.68 X 222.22 = 333 Sqm Solar Evaporation pan area provide 418 Sqm, Hence it is adequate. Presently, the unit has stored the total accumulated quantity of hazardous wastes of 4.7 Tons under the closed shed as on 02.03.2023 The unit has laid HDPE geo membrane sheet over the entire area of solar evaporation pan to prevent the seepage of RO reject. The unit has provided EMFMs at the following Locations. i, ETP Feed ii, ROLFeed il, RO |-Permeate iv. RO FReject v. RO Il-Feed vi, RO Il-Permeate vii, RO Il-Reject viii, Nano Feed Nano Permeate (Brine) Nano Reject Process make up Raw water make up Brine reuse ETP out let xi xii xii xiv, POLLUTION PREVENTION PAYS TAMILNADU POLLUTION CONTROL BOARD 6. Compliance of defects/violations stated in the closure direction dated:- 02.12.2022 [SI No. Conditions mentioned in the Closure direction dated 02.12.2022 Compliance 7 - 7 The unit has installed * During the inspection, the unit is in operation without valid consent of the Board Type winch to the capacities of 800 Kg — 1No. & 400 Kg — 1 No. The effluent generation will be 1200 x 80 litfday = 96 KLD which is higher than the consented quantity of 50 KLD. The unit has obtained renewal of | consent vide Board proceedings | | dated. 25.02.2023 with valid up to | 31.03.2023 - |The unit has removed the 800 | machinery in the unit premises. Now, the unit is having the following machinery which is within the consented capacity. Winch Machines — 400 Kg -1No. & |.150 Kg 1No. = Total 550 Kg The unit is treating the trade effluent using chlorine gas to remove the colour and discharging the same to the adjacent public drain with TDS value of 2980 mg/l (measured by handy TDS meter) which ultimately confluence in the River Cauvery without any further treatment, | During inspection the unit was not in operation and removed the chlorine | gas cylinder in the premises. Also, the unit has assured to operate the ZLDs efficiently. All components of the ETP were not in operation ‘|The RO system of all stages and Nano | Filtration were not in operable condition | [During inspection the unit was not in | operation and the unit has assured to operate ETP efficiently during its | operation. During inspection the unit was not in operation and revamped the RO system/Nano Filtration. Also, the unit | has assured to operate the ZLDs efficiently. | 6 |The unit has not maintained any log | The unit has assured to maintain the book with respect to EMFM reading, | log book for the operation of ETP, RO chemical consumption and for the | system and RMS | operation of RO & RMS details. = - Hy 7. | EE (Flying Squad)/Erode has furished | During inspection the unit was not in the photographs taken during the | operation and revamped the RO inspection system/Nano Filtration. Also, the unit | has assured to operate the ZLDs efficiently. 8. _| The Hon'ble High Court of Madras, in its | The unit has revamped the RO order dated 04.07.2007 & 09.08.2007 in W.P Nos.5494/98 and 30153/03 has ordered vide Para 18(iv) as follows: “The Dyeing industries shall install electromagnetic flow meter, operate | their effluent treatment plant and RO plants, recover water, properly manage reject and cease discharge to a water body/land and have their records maintained as directed by the Boards and shoquid undertake to satisfy the Board’. system/Nano Filtration and assured to operate the ZLDs efficiently. POLLUTION PREVENTION PAYS TAMILNADU POLLUTION CONTROL BOARD In view of the above, DEE, TNPCB, Kumarapalayam has recommended that the unit of Mls.Senthilkumar Textiles, T.S. No: 22/1 & 3A4, Kumarapalayam Agraharam Village,Kumarapalayam Taluk, Namakkal District - 638 183 may be levied with Environmental Compensation of Rs.2,30,000/- (Rupees Two Lakhs Thirty Thousand only) and also to consider the issue of revocation of closure direction and restoration of power supply direction to the unit subject to certain conditions, Further, in view of the Show Cause Notice dated 31.03.2023 issued to the unit, the unit has remitted Environmental Compensation (EC) of Rs.2,30,000/- (Rupees Two Lakhs Thirty Thousand only) to the Board and furnished the EC remittance details vide Receipt Voucher No. 2 dated 03.04.2023 In the light of the above and in exercise of the powers conferred under Section 33A of the Water (P&CP) Act, 1974 as amended, the Board hereby issues orders for revocation of closure direction and restoration of power supply to the unit of M/s.Senthilkumar Textiles, TS. No: 22 & 3A4, Kumarapalayam Agraharam Village,Kumarapalayam Taluk, Namakkal District - 638 183, subject to the condition that the unit shall comply with the conditions stipulated in the Renewal of Consent Proceeding dated 25.02.2023 issued by DEE, TNPC8, Kumarapalayam Hence, the power supply to the said unit may be restored with immediate effect The receipt of this proceeding shall be acknowledged. Sdl- Chairperson To The Partner, Mis.Senthilkumar Textiles, T.S. No: 22/1 & 3A4, Kumarapalayam Agraharam Village, Kumarapalayam Taluk, Namakkal District - 638 183 Copy to 1, The District Collector, Namakkal District, Namakkal 2. The Joint Chief Environmental Engineer (Monitoring), Tamil Nadu Pollution Control Board, Salem No.9,4" Cross Street, Brindhavan Road, Fairlands, Salem - 636 016 3. The District Environmental Engineer, Tamil Nadu Pollution Control Board, Kumarapalayam No. 298/A,Salem Main Road, Thiruvaluvar Nagar, Kumarapalayam Namakkal District — 638183 4. The Superintending Engineer EDC- Mettur TANGEDCO (Distribution Circle), Mettur, Salem - 636 401 Email: semtr@tnebnet.org 5, The Assistant Engineer, TANGEDCO. Komarapalayam South, Namakkal District - 638 183 Email: erm157ae@tnebnet.org ($< Technical file. For Chairperson POLLUTION PREVENTION PAYS By Speed Post Bare SS <=——— SNF TAMILNADU POLLUTION CONTROL BOARD Pros ‘S/TNPCBI '895/KMP/EB/2023, dated : 0: 1023 Sub: TNPCB -Industries - Mls.Senthilkumar Textiles, T.S.No.22/1 & 3A4, Kumarapalayam Agraharam Village, Kumarapalayam Taluk, Namakkal District — 638 183— Direction issued for restoration of power supply under Section 334 of the Water (P&CP) Act, 1974 as amended — Orders issued ~ Reg Ref: 1. Board Proc. No. TS/TNPCB/F-27895/KMP/W/2022-1, dated. 02.12.2022 2. Board Proc. No. T5/TNPCB/F-27895/KMPMW/2023, dated : 03.04.2023 In the reference first cited, direction was issued to TNEB to disconnect the power supply to the unit of M/s.Senthilkumar Textiles, T.S. No. 22/1 & 34, Kumarapalayam Agraharam Village,Kumarapalayam Taluk, Namakkal District - 638 183 under Section 33A of the Water (P&CP) Act, 1974 for the reasons stated therein Now, the Board vide proceedings second cited (Copy enclosed) has issued revocation of closure direction and restoration of power supply to the said unit for the reasons stated and conditions imposed therein. In view of the above, it is hereby directed that the power supply to the unit of M/s.Senthilkumar Textiles, T.S. No. 22/1 & 3A4, Kumarapalayam Agraharam Village, Kumarapalayam Taluk, Namakkal District - 638 183 shall be restored with immediate effect. The receipt of these proceedings shall be acknowledged. Encl: As above Sdi- Chairperson To 1) The Superintending Engineer, TANGEDCO (Distribution Circle), Mettur, Salem - 636 401 Email: semtr@tnebnet.ora 2) The Assistant Engineer, TANGEDCO, Komarapalayam South, Namakkal District - 638 183 Email: erm157ae@tnebnet.ora Copy to 1. The District Collector, Namakkal District, Namakkal POLLUTION PREVENTION PAYS TAMILNADU POLLUTION CONTROL BOARD al 2. The Joint Chief Environmental Engineer (Monitoring), Tamil Nadu Pollution Control Board, Salem No.9,4" Cross Street, Brindhavan Road, Fairlands, Salem - 636 016. 3. The District Environmental Engineer, Tamil Nadu Pollution Control Board, Kumarapalayam No. 298/A,Salem Main Road, Thiruvaluvar Nagar, Kumarapalayam Namakkal District - 638183 4. The Partner, Mis Senthilkumar Textiles, T.S. No: 22/1 & 3A4, Kumarapalayam Agraharam Village, Kumarapalayam Taluk, Namakkal District - 638 183 13?” Tochnica file For Chairperson 8. oo POLLUTION PREVENTION PAYS

You might also like