JHA on Cable Laying and Termination
1. Engineer - in - Charge
2. Manpower required for the job
3. Tools and tackles required
4. PPE required
5. Authorization Required
2 (Site specific)
+ (Site specific)
: Tools for excavation, Cable lifting jacks, knife
for cable peeling.
: Safety belt, Safety helmet.
: Excavation permit.
SI. | Sequence of the
Potential Hazards
Protective measures to be taken
No. job
1. [Excavation for |) Shock from buried 1) The area to be excavated shall
Cable laying Cables. be carefully seen for possible
b) Fall in excavated pits.
Cables laid already.
Excavation permit shall be
taken.
While excavating near the
Cables, the Cables shall be de-
energized.
Area around the Cable shall be
excavated with utmost care.
2
3
4)
Barricading shall be done to avoid
fall into the excavated trenches.
2. | Loading and
Unloading of
cable drums on
truck.
Truck,
a) Failure of slings.
b) Failure of the Cranes,
c) Fall of drums from the
1) Periodic examination of the
slings.
2) Use slings of correct capacity.
3) Keep persons at a distance
while the material is being
lifted/lowered.
L
Ensure periodic load testing of
cranes.
Ensure use cranes of correct
capacity.
3) Carry out periodic maintenance
of Cranes.
2
1) Properly fasten the drums.
2) Block the movement of drums
using wooden
stoppers/sleepers.No.
‘Sequence of the
job
Potential Hazards
Protective measures to be taken
Transportation of
Cable drums.
a) Fall of Cable drums.
b) Over turning of the
vehicle.
1) Speed limit of 20 km/hr shall
not be exceeded.
Lock the movement of cable
drums by fastening and with
wooden stoppers/slippers.
2
1
Use vehicle of adequate
capacity.
2) Avoid over loading.
3) Negotiate curves at reduced
speed.
Unrolling of
Cables.
a) Slippage from cable
drum from jacks.
LT
Properly balance the Cable
drums over the jack.
Check the ground below the
jacks to be sufficiently firm to
take the load
3) Avoid pulling of the Cable for
unrolling instead rotate the
Cable drum for unrolling.
2
Cable termination
@) Cut from knife while
peeling the cable.
b) Cut from the cable
armor while handling.
c) Injury due to cable fall.
d) Shock while termination
Care shall be taken while the
Cable sheath is peeled off.
Canvas/leather hand gloves shall
be used.
Use Safety shoes.
1) Before termination of the
Cable, ensure that the power
supply is cut off.
Ensure that job permit is
taken.
2
Taking IR
value/HV test
a) Shock hazard due to test
voltage
b) Shock hazard due to
T
Ensure that the persons are
away from the Cable terminals
while Meggering
Ensure that the Cable terminals
at the farther end and are safe
and isolated from human
approach/caution boards are
put.
Discharge of Earth Cable
before work.
2
3
1) Ensure that the Cable ends areNo.
‘Sequence of the
job
Potential Hazards
Protective measures to be taken
wrong identification oF
cable,
properly identified before start
of work.
2) Check the presence of Voltage
by line tester/test lamp for L.T.
3) Test for the presence of
voltage by remote voltage
indicator for HT.