You are on page 1of 6
Feedback Ina Prive Lime ‘stg Bret Motos S001 NO FEEDBACKCINFRA {er ystet Sot Fac 31 041 me Nake tapecenscen Hae Tit heiectonmacnincam ‘wirafeediacinr.com FIPL/BF/ODIENNE/GEO /LBTP/WO-S/06 Date: 26.02.2019 To, LABORATOIRE DU BATIMENT ET DES TRAVAUX PUBLICS Rue Clement Ader-Zone IV 04 B.P. 3 Abidjan 04 Site web: www.lbtp.org Tel: 00 228 21 21 23 001 01 Fax: 00 225 21 2536 71, Ivory Coast Kind Attn: JEAN CLAUDE KOUASSI Dear Sir Sub: Work Order for GEOTECHNICAL Studies for 25 MW Solar Power plant at ODIENNE. References: 1. Your Offer ~. 0268 /2019/DGC-SF-04, dated: 26% February 2019 Dear Sirs, ‘This has reference tc your proposal and the subsequent correspondence, discussions as referred above for GEOTECHNICAL STUDIES for 25 MW Solar Power plant at ODIENNE. We are pleased to plac: this Work Order on you for above sald subjectto be carried utat one site ofarea of aout 53 Ha, The scope of work:sattached as Annexure ~1to this work order Please note that the scape of services, technical parameters and deliverables will be as per the documents attached a, ele ieee 31,2 Fa Van Pl ht 7 oto. Ser 2 aN Ch 10678 UT 02) BE “a "h "Vas FEEDBACIC INFRA. fee oe 1. PRICE Price agreed for “he said studies at the site as per scope attached is as below. i For 25 MW Solar] pea 5200000 Total) FEFA 5200000 ‘The terms of payment is as below. ‘Studies for Geotedhni Power plantat ODIENNE a] 40% as advance against Acceptance of Work order and Advance Invoice. +b) 30% upon submission of Draft report and approval by Client, ©) 30% after submission of Final Report ‘TAXES AND DUTIES: ‘The order value indicated above is including all applicable taxes. For any ‘out of pocket expenses, local transportation ete. no further payment is cligible as per the seope. DELIVERY SCHEDULE: ‘The detailed completion schedule in the form of Bar chart shall be submitted by you, which shall be mutually discussed and agreed once again. ‘The following will be the Deliverables along with all essential drawings/ documents: (@) Draft report of Geotechnical studies in soft & hard copy.(One Copy) (i) Final report of Geotechnical studies in soft and hard copy. (One Copy) ‘The draft and Final Report shall be submitted in English as well as French. er DBACKK INFRA, 3. OTHER TERM! (0) Price indicated above is firm till the completion of work. (i Jurisdiction of operation of contract shall be Cote D'voire only. FORCE MAJEURE: Im the event of unforeseen causes beyond control and without fault and negligence of the Contractor including (but not restricted to) act of God or Public enemy, action of Government in its sovereign capacity, floods, epidemics quarantine, strike, lockouts, fires, explosions, accident’s, ‘stoppages in the supply of power, civil commotion riots, wars or warlike acts, insurrections, mutiny, ‘changes in statuary regulations, governmental measures or decrees, embargoes, natural catastrophes, fire, rejection of a major work piece etc. the execution of work will be extended. In the event of any of the aforesaid contingencies, unusual or extra ordinarily prolonged, FIPL will be promptly kept informed by the contractor by fax/telegram followed by confirmation in writing with documentary proof within 15 days of the commencement and completion of force majeure circumstances. ‘The extension of Contract, period/completion time shall be in keeping with the duration of the force ‘majeure event, ‘You are requested to please sign and return the duplicate copy of this Work Order duly signed and stamped on each page as a token of your acceptance. Also please confirm your Bank details Please provide swift code and IBAN No. along with the advance invoice on submission along with the work order acceptance copy. ‘Thanking You _ een 4) 4 (SUN Har Sr. Vice President) For Feedback Infra Private Ltd CONTRACTOR'S ACCEPTANCE: We accept the Wark Order. Received, Agreed and Accepted For M/s, LABORATOIRE DU BATIMENT BT DES TRAVAUX PUBLICS (Authorised Signatory) FEEDBACIC INFRA fare ‘ANNEXURE, ae SGeoteciaanayts “Te gotta study willbe cre ou onan the perimeter Mente prelusy, The gol sto ent the most propa type of anchorage and foundation ‘The grotechical analyte wl be base onthe folowing te: ‘i desertion, essurenans Homi Grane aalyss Hlectaresstty ‘ear strength cobra it “Tne sand peeraton ets wil io be eld out. Ths constant shal provide th lad capesty Wd 1Sshand 20m reach dig os wal recommendations. “Te number of core ling wil be nied o | dling For each’2 MW apy eth of the cre ling mt be st eas 6 te) Geotechnical studies ‘Conduct, Review and updated geotechnical report ‘Any adltional geotechnical investiga n requited, including the terms of reference. Geological and engineering geological mapping of main structures areas ‘Excavation of test pis/trenches by mechanical / manual means. Geophysical investigations such as electrical resistivity tomography surveys may be {deployed depending onthe complexity of the local geological setting, Borehole driling ~ tbore log for every 2 MW capacity (bore log length minimum & metres) Laboratory testing. Recommendations for safe beating capacity FEEDBACKK INFRA ‘aka ow ~The Tt of ests fo be conducted in so rock Same. 1 2 Conducting various bboratory tests on sol samples at an approved laboratory including preparation of sol sample to determine allowable bearing capacty of sol ‘Natural Moisture Content (Nic) Sal cassfication{with Grain size enalysis& distribution curve) Speci gravty Bulk density ond dy density Porosity Comprassivestrength Chemical Anayss of sil Standard Prcctor Compaction Test Trail axial Shaar test Consolidation test Laboratory Test on ack samples as per specification for determining the folowing properties: Moisture Content, Porosity and Density Specific Granty Hardness Slake Durability index Uncontined Compressive Strength (both saturated and in-situ water content) Point Load strength index DDeformabilty Test (both saturated and dry samples ) ‘Conducting Earth Resistivity Testa per : 3042, For measurement of earth resstity all the spkes are to be buried at depth of 5 em ‘rom the ground. Aso these four spikes shouldbe equidistant cllineary. The earth meter should be evetranie meter. The meacuring instrument should have tlectrosttic shielding to avoid any external Interferences and induction. The general fuldeline of IS 3043 shouldbe followed for all the measurement. ‘The measurement should be taken in minimum four directions. All measurements should be done at, 3,5, 8,10, 15 M gapping each {arth resistivity draft report (within a day of ERT conduction) n oft, shll contain ERT location Map with GPS coordinates, resstance/ERT values (Polar Resstvity Curves, [Apparent Resistivity vs Electrode spacing curve) at each locaton FEEDBACICINERA + Astana sata profile sata below asa een ance scree |: ‘avmeghd waar en | pretnass pgnhes | | "mum ade a, TES a edn as est au oo ed oe gna i voansnone 2 i erfems | smangeraaparg| avterus | seaoe (u)apezaen| erway eee amg ano mes pay og8 aun runsa vomOTINS

You might also like