P10-ROOF COORDINATED REVIT MODEL UPDATE 1

Key Plan:
P9

PART A

PART B
1
NOTES FOR HVAC:- NOTES FOR MECHANICAL.:- 2

10

475
N
1 SECURITY

KAH
M AK
3
1

P8 2 NOTES
1
4

P7

2 3

LEVEL 1 P6

1 1 4

MEZZANINE 2-P5

MDB
GENERAL ELECTRICAL SCOPE OF
WORK FOR HVAC / MECHANICAL
EQUIPMENT
(EXCEPT FOR EQUIPMENT THAT ARE FED
FROM MCC)

P4

MEZZANINE 1-P3

P2

AS BUILT DRAWING
Al Kout Fahaheel, Kuwait
RFS: 10-3742-S000
Transmittal No. Date:

GROUND-P1 No Objection "A"


Rejected to be Resubmitted "C"
ENG.
DATE: R.E.
Checking is only for conformity with the design concept of project and compliance with the information
given in the contract documents contractor is responsible for dimensions to be confirmed and correlated at
the job site for the information that pertains solely to the fabrication process or to techniques of construction
and for the co-ordination of the work of all trades

AMENDMENTS
Rev. Date Description

BASEMENT-1

0 23.06.2018 ISSUED FOR APPROVAL

Owner:

MANSHAR
REALESTATE Co.
K.S.C.C.
Owner Rep:

Concept Design: 717 Pacific Avenue


Dallas, TX 75210
FORM-3B FORM-3B FORM-3B FORM-3B
Tel: 214 468 7910
Fax: 214 468 7601
Consultant:
P.O. Box 3679, Safat 13037, Kuwait
BC BC Flamingo Complex, Free Trade Zone
Shuwaikn, Kuwait
Tel: 965 24616000, FAX: 965 24616001
web: http://www.keoic.com
email: keo@keoic.com
MLTB.04.B2.01 MLTB.04.B2.02 MLTB.04.B2.03 MLTB.04.B2.04
Main Contractor:
E E E E

TCL = 1167.205 kW TCL = 1138.061 kW TCL = 1219.840 kW TCL = 957.351 kW


Sub-Contractor:
TCL = 1167.205 kW TCL = 1138.061 kW TCL = 1219.840 kW TCL = 957.351 kW AL MULLA ENGINEERING
TX.04.B2.01 TX.04.B2.02 TX.04.B2.03 TX.04.B2.04 BADER AL MULLA & BROTHERS COMPANY W.L.L
P.O. BOX 177, 13002 SAFAT, KUWAIT
1600kVA 1600kVA 1600kVA 1600kVA TEL: 24815077-22205222 FAX: 24839725-22205200
11/0.433kV, 50Hz
11/0.433kV, 50Hz 11/0.433kV, 50Hz 11/0.433kV, 50Hz Project Name:
E E E E
BY MEW BY MEW BY MEW BY MEW E AL KOUT
E E E
FAHAHEEL, KUWAIT
Drawing Name Contract Drawing No.
BASEMENT-2 EP-601-04.1
SUBSTATION - 4
ELECTRICAL RISER DIAGRAM-1 SD Submittal No.
MRE-BP2-SD-01265

Date: Scale: Drawn by: Checkd by: Approved by:

BASEMENT-3 23.06.2018 NIS SSha GTM STA


Technical Manager As-Built Drawing No.: Sheet Rev.
SUBSTATION - 4 ELECTRICAL RISER DIAGRAM-1 BP2/BM-EP-AB-SS-014-00
1 14/17
0
NTS Date: Submittal No:
MRE/BP2-AB-