You are on page 1of 11

__________________________________________________________________________

Technical Manual
®
INNOVA M3 New

2. Technical data/
connections

__________________________________________________________________________

Art. -No.: 00006.15 Rev. 0 INNOVA® M3 New


INNOVA® M3 New Page 2 of 11 Art. -No.: 00006.15 Rev. 0
INNOVA® M3 New

2. Technical data/ connections

Content

1. General .................................................................................................................. 4

2. Water connections................................................................................................ 5
2.1 Cold water................................................................................................................... 6
2.2 Warm water................................................................................................................. 6
2.3 DI-Water...................................................................................................................... 6
2.4 Waste water ................................................................................................................ 7

3. Exhaust air connection ........................................................................................ 8


3.1 Exhaust air .................................................................................................................. 8

4. Electric connection............................................................................................... 9

5. Connection for the detergents........................................................................... 10

6. Consumables ...................................................................................................... 11

Art. -No.: 00006.15 Rev. 0 Page 3 of 11 INNOVA® M3 New


1. General

All dimensions refer to the finished floor and finished wall.

Modifications and services carried out by BHT Hygienetechnik which arise from failings by
the customer, will be invoiced to the customer.

General technical data:

Noise emission:
A-weighted equivalent continuous 58-62 dB (A)
mean sound pressure level

Max. ambient temperature + 5° C to + 40° C

Max. perm. relative air humidity 30% to 95% (non condensing moisture)

Heat emission to the room


500 Watt (1.8 / 2.8 MJ/ hr.)
clean/ unclean side

Weight Approx. 150 kg

800 x 680 x 880 mm (free standing model)


Outer dimensions ( W x D x H)
800 x 680 x 850 mm (under-counter model)

If there are panels from the machine up to the ceiling, the panels have to have ventilation
slots. Free cross section 100 cm².

For the connection of automatic cleaning machines to the drinking water supply, all
local/national regulations must be followed (for example in Germany DIN 1988 and “DVGW”
regulations and specifications must be followed).

Install electric connections in accordance with the IEC regulations and local/ national (in
Germany VDE) regulations.

More details are given in the following chapters.

INNOVA® M3 New Page 4 of 11 Art. -No.: 00006.15 Rev. 0


INNOVA® M3 New

2. Technical data/ connections

2. Water connections
Shut off valve:

Shut-off valves, installed at user-friendly place in the room.

Pipeline color identification:

Red : WW (warm water)


Blue : CW (cold water)
Yellow : DI (de-ionised water)

Length of the connections:

Length of the supplied pipelines is approximately two meters each.

Art. -No.: 00006.15 Rev. 0 Page 5 of 11 INNOVA® M3 New


Water connections

2.1 Cold water

Ball valve 3/4" to the machine with double nipple with


Connection
¾ " external thread

Hardness Recommended 10°dH, max. 22°dH


Flow pressure 2 - 5 bar

Consumption per charge Approx. 20 to 23 l

2.2 Warm water


Ball valve 3/4" to the machine with double nipple with
Connection
¾ " external thread
Hardness Recommended 10°dH, max. 22°dH
Flow pressure 2 - 5 bar
Consumption per charge Approx. 10 l

2.3 DI-Water
Ball valve 3/4" to the machine with double nipple with
Connection
¾ " external thread
Water quality Max. 10 µS/cm
Flow pressure 2 - 5 bar
Consumption per charge Approx. 18 to 20 l

* Values consumed are subject to the structural conditions. Deviations up to 20% is possible.

INNOVA® M3 New Page 6 of 11 Art. -No.: 00006.15 Rev. 0


INNOVA® M3 New

2. Technical data/ connections

Water connections

2.4 Waste water


The BHT INNOVA® M3 New is discharged by a drain pump. The building side water drain
made by Siphon.

Water temperature
Up to 80°C/ only short time 1 minute.
(acc. to wash program)
Capacity 30 l/min
pH value 5–9
Machine side discharge 19 mm internal diameter, 1.2 m long.
Place of installation Flush with the finished wall
Washing machine siphon at customer site mounted
Siphon slightly inside or above the surface of the finished
wall.

Consider the slope-gradient according to DIN! Drainpipes


must be made of corrosion resistant materials (e.g. fiber-
cement or cast iron). Note!

Art. -No.: 00006.15 Rev. 0 Page 7 of 11 INNOVA® M3 New


3. Exhaust air connection

3.1 Exhaust air

Exhaust air connection DN 40 (2x)

Customer side exhaust air line DN 70 condensate sealed.

Discharge temperature Max. 45°C (short time).


Material of the pipe SS 304, PP, PE

Resistance around exhaust air channel Max. 150 Pa.

Air capacity of the machine at drying 150 m³/h.

Air capacity of the machine at washing.


Under pressure (suction) at zero suction, Minimum 50 m³/h.
which means during the wash cycle

100% for short time and 50% in


Air humidity
average.

INNOVA® M3 New Page 8 of 11 Art. -No.: 00006.15 Rev. 0


INNOVA® M3 New

2. Technical data/ connections

4. Electric connection

Power supply cable to the BHT INNOVA® M3 New has to be connected to the
terminal box of the machine and grounded properly in accordance with the valid IEC
guidelines. Each machine requires its particular rated fuses and particular supply
cable. Earth leakage circuit breaker, according to IEC guidelines and local/national
(in Germany VDE) regulations.

Safety device by customer:


Three-pole master switch mounted at an easily
accessible place in the operating room.
A residual-current-operated circuit breaker is to be
provided in accordance with the valid IEC (in Germany
VDE) guidelines.

Electrical rating:

Operating mode Exclusively electric


of the heating
3x230V+PE
Input voltage 3x400V+N+PE or 3X208V+PE

35 A
Fuse 20 A

Connected load 11 kW 11 kW

Tank heating 7 kW 7 kW

Dryer heating 3.4 kW 3.4 kW

Boiler (option) 9 kW 9 kW

Supply lines at site According to IEC

Fuse protection and conductor area according to IEC

Art. -No.: 00006.15 Rev. 0 Page 9 of 11 INNOVA® M3 New


5. Connection for the detergents

At site in cabinet
Place of container Max. 650 mm above the finished floor
Max. distance 10m

Empty pipe DN 70 in floor or at the sides


Feeding of the dosage
hoses
respectively above the ceiling, joint-free inside,
max. 45°-bends allowed.
Container 5 kg (140 x 245 x 225 mm)
Dimensions (W x H x D)
Container 10 kg (190 x 320 x 230 mm)

The ends of the hoses are colour marked with the kind of chemical that shall be used
with it (e. g. cleaner = white, disinfector = blue).

If several machines are supplied from only one container for each detergent, a
dosage control is necessary. The connection to a central dosing control is also
possible. For details please contact the manufacturer.

Be careful when working with cleaning and disinfection


agents. Eyes, hands and clothes must be protected. Wear
safety glasses and gloves. Avoid contact of eyes and skin
Caution! with chemicals.

INNOVA® M3 New Page 10 of 11 Art. -No.: 00006.15 Rev. 0


INNOVA® M3 New

2. Technical data/ connections

6. Consumables

Use only detergents, which are tested and approved by the


manufacturer (BHT Hygienetechnik GmbH). Please consult
the manufacturer (BHT Hygienetechnik GmbH), in case you
want to use operating supplies by other manufacturers. Attention!

- Cleaning agent.

- Disinfectant.

When changing the consumable materials the Instructions in


chapter 9.1 "instructions for suction lances with reflux preventer"
are to be considered.
Note!

For damages, caused by the usage of incorrect consumables /


detergents or their incorrect handling (e.g. crystallisation),
BHT Hygienetechnik GmbH declines any responsibility.
Note!

After changing the consumables/ detergents the flow meters


must be recalibrated and the dosage quantity readjusted. This
can only be done by a service technician from BHT
Hygienetechnik GmbH or a specially trained service
technician from your organization. Otherwise, cleaning and Vorsicht
Caution
Caution!
disinfection may not be effective.

Art. -No.: 00006.15 Rev. 0 Page 11 of 11 INNOVA® M3 New