Bulk Carriers: Guidance / Instructions For P.S.C Inspections
Bulk Carriers: Guidance / Instructions For P.S.C Inspections
GUIDANCE / INSTRUCTIONS
FOR P.S.C INSPECTIONS
(To be checked off when the vessel departs for its next port of call)
Safety Equipment
• Emergency Stations Muster List up-to-date, and posted in conspicuous locations. The
Muster List must include the following information:
• Lifeboat lowering dates, during drills (as well as date of last launching) to be entered
in log book. All lifeboat launching equipment, including davits and release gear, to be
in fully operational condition. All blocks & pivot points to be regularly greased, with
no paint accumulation. Lifeboat launching instructions to be posted (in Chinese).
• Liferafts and lifebuoys in good condition, number and location as per Vessel’s Safety
Plan.
• Record of all emergency drills carried out, along with annual schedule for shipboard
drills to be posted. (Annual schedule as per WSM Quarterly Report).
• All safety equipment neatly laid out in EHQ, with LSA/FFA PMS Chart up to date.
• Fire Control Plan and Fire Wallet (with latest Crew List) to be available at gangway,
while in port. All staff to be familiar with its contents.
• SOLAS Training Manual to be fully updated, with vessel specific information, and
read/signed by all staff. (One English copy + 2 Chinese copies to be available).
• Self closing fire doors operating properly – not hooked in open position.
• Fire flaps and dampers in fully operational condition, checked for free movement.
List of flaps/dampers prepared, with location, & posted on Wheelhouse.
• Funnel flaps fully operational, and routinely tested. Entry made in log book.
• All emergency Quick Closing valves in fully operational condition, date of last test
entered in log book.
• Emergency generator fully operational, tried out regularly, on load. Log entry made
of test dates for Emergency generator. Instructions for operation to be posted in
Chinese.
• Emergency ventilator shut off switches fully operational, date of last test to be entered
in log book.
• Emergency escapes from Engine Room clearly marked and well lit – fitted with
lifeline and rescue harness.
• Fire line on deck and in Engine Room – in good condition, no patches, heavy
corrosion or soft spots. Any leaking hydrants to be repaired.
• Fire hoses and nozzles – tested routinely under full operating pressure, any leaks
rectified.
• Fixed Fire Extinguishing System for Engine Room – fully operational, all cylinders
showing normal level indication, date of last test marked in cylinder storage room.
Log entry made, describing last test carried out of release mechanism and alarms.
a) Illumination and ventilation of work spaces and routes along which people pass,
to be satisfactory.
f) If carrying noxious cargoes, instruments for measuring harmful gases and oxygen
to be available, along with calibrating gases for same. Logs to be kept of tests and
calibration carried out on these instruments.
• In machinery spaces, the following areas must be checked, to ensure strict compliance
with safety standards:
d) Steam pipes, compressor discharges, etc are to have proper lagging or shielding,
which are capable of creating a safety hazard, due to their temperature and
location.
MARPOL
• Oil discharge Monitor (Engine Room) – Clear and legible instructions posted.
• Overboard valve from Oil Discharge Monitor closed and locked, key with C/E or 2/E.
• Disposal of oily residues logged regularly in Oil Record Book, as per handling
capacity of vessel’s incinerator (if being incinerated). In case any residues discharged
ashore, certificate of discharge to be obtained from shore installation/barge, and
attached within Oil Record Book (along with relevant entry).
• Waste Management Plan in full use, with daily entries in WSM Waste Management
Manual. Any disposal of plastic waste ashore to be accompanied by receipt from
shore authority.
• Designated spaces aboard the vessel, with specific containers used to collect, store,
process and unload ship generated waste.
• Equipment available on board, with full operating instructions, to deal with ship
generated garbage (includes incinerators and grinders/comminuters).
• Shipboard Oil Pollution Emergency Plan (SOPEP) – latest revisions inserted, and
manual regularly reviewed by Master.
• In spite of MARPOL Annex IV (covering sewage disposal) not being in force, some
PSC checklists have additional requirements for vessel’s sewage systems. Some of
the items inspected are as follows:
c) Efficient water traps and water seals to be fitted on all drains, scuppers and
discharges.
• An adequate Medical Chest, separate from the vessel’s other stores/spares, must be
carried on board.
• All medicines within are to be clearly marked with name, type of treatment offered,
dosage, date of expiry, and warnings/precautions, if any. No expired medicines to be
kept on board.
• A water closet (bathroom & toilet) must be provided for the exclusive use of the
hospital occupant/s.
Loadline
• Ladders and guardrails to be inspected for any wastage, and steps taken to rectify any
faults.
• Watertight door closure satisfactory, all dogs and packings in good condition (dogs
operating freely).
• Gangways (accommodation ladders) securely rigged, with safety nets, and sufficient
lighting at night.
• Pilot ladders in satisfactory condition, without any damage to steps, rope or chocks.
Cargo operations
• Cargo gear register (Chain Register) available with C/O, all surveys/inspections
within date.
• Certificates for wires, chains, loose gear and ropes available, all appropriately
marked.
• Lashings – If applicable, log cargo lashing plan to be prepared and kept as ready
reference. Also, a lashing equipment condition check must be made at regular
intervals, and any failings rectified immediately.
• Creeping under load of crane wire – timings to be checked and verified. In case creep
exceeds 1 metre in 60 seconds, brakes to be adjusted accordingly. Any shortcomings
to be brought to the attention of Technical Suptdt, as soon as possible.
• Chief Officer’s Standing Orders to be posted, and signed by all Deck Officers.
• Ballast water management – Change of ballast water (as per country specific
guidelines, eg AQIS guidelines for Australian ports, in conjunction with vessel’s
specific Ballast Water Management Plan) to be carried out, and Ballast Water
Reporting Forms to be prepared.
On Bridge
• All Chart corrections up to date, corrected to latest NTM on board. All applicable
T & P Notices to be marked on Charts, and also filed in separate file.
• Compass Error log being filled regularly, showing recent error observation and
calculation. Master to verify this log periodically.
• Bridge Procedures Manual, including all checklists and publications, sighted by all
Deck Officers. Officers to sign manual after reading same.
• GMDSS log – Log must clearly mention officer in charge of GMDSS equipment
maintenance. All tests (internal and external) carried out also to be logged. A visiting
PSC inspector may require that a test be carried out in his presence. All OOW must
therefore be fully conversant with operating procedures for GMDSS equipment.
• Vessel to have suitable quantity and quality of food and water supplies, which are
suitable for the vessel’s number of crew, with regard to the nature and duration of the
voyage.
• All spaces and equipment for the storage and handling of food and water, as well as
spaces and equipment for preparation/service of meals (ie the Galley and Pantry), are
to be maintained in such a manner which permits the service of proper meals to the
crew.
• The ventilation, lighting, water system and other equipment of Galleys and other
catering department spaces on board, including store rooms and refrigerated
Crew Accommodation
a) There must be one tub and/or shower bath for every eight, or less persons.
d) Floors must be of durable material, easily cleaned and impervious to damp, with
proper drainage.
f) Water closets are to be close to, but separated from sleeping rooms.
g) All water closets should have ventilation to open air, independent from any other
part of the accommodation.
h) All water closets should have an adequate flush of water, available at all times,
and independently controllable.
i) Waste pipes should be of adequate size, and so constructed as to minimize the risk
of obstruction. They should also facilitate cleaning.
Machinery
• Housekeeping and maintenance standards in the Engine Room must be such that no
evidence is visible of any disregard towards machinery, Engine Room safety, and
pollution prevention. Some of the most visible signs of neglect, that must not be
allowed to occur, are:
General
• Class listing of Survey Status (latest) available on board, including COCs, if any.
• Shipboard Management Manuals (Part I,II & III) updated to latest revision/correction,
along with all other Company manuals.
****************
• Master/Senior officers did not know Designated Person Ashore (DPA), or means to
contact him.
• Master not aware of his vessel’s minimum manning, as per Certificate.
• Copy of Company’s DOC not available on board.
• No record of annual endorsement on DOC.
• Safety Equipment Record and Supplement not updated, for shipboard equipment.
• Crew not familiar with Safety Management System (SMS) – take too much time to
find relevant sections in the Manuals. Language of SMS Manuals not familiar to
Crew.
• Operating instructions for critical equipment (lifeboat davits, emergency generator,
emergency fire pump, etc.) not in language understood by Crew.
• Staff not following Company Safety Reporting (SAFIR) system, ie raising Near-
Accident, Non-Conformity and Accident/Incident reports.
• Record of Internal and External audits, with follow up action, not found on board.
Loadline/Structural
MARPOL
Bridge/Communication
Certification
Machinery space