Solid Waste Management CR

How many requirements project must meet for


the solid waste management credit and from 4 requirements must meet out of total 5.
total of how many requirements?

Include as part of the project at least how many


recycling or reuse station, available to all project
occupants, dedicated to the separation, one
collection, and storage of materials for
recycling?

What should be provided if recycling station is Locate the project in a local government jurisdiction that
not available at the project? provides recycling services.

What must be included in recycling materials? Paper, corrugated cardboard, glass, plastics, and metals.

What must be provided at the project for


potentially hazardous office or household wastes
one drop-off point, available to all project occupants
and establish a plan for post collection disposal
or use?

What must be provided at the project if one Locate the project in a local government jurisdiction that
drops off point is not available at project? provides collection services

what are the Examples of potentially hazardous Paints, solvents, oil, mercury-containing lamps, electronic
wastes? waste, and batteries.

What should be provided at the project dedicated one compost station or location, available to all project
to the collection and composting of food and occupants,
yard wastes?

What must be provided at the project if one


Locate the project in a local government jurisdiction that
compost station or location is not available at
provides composting services
project?

Which can be ideal locations for compost


Neighborhood gardens or farms
stations?

Which approval is required for Compost


Approvals or permits from the state or local government
facilities?
Where recycling containers should be provided One for every mixed-use or nonresidential block, or one
for every mixed-use or nonresidential block? at least every 800 feet.

If only single-stream recycling is available, how


Provided for each material type.
containers should be provided?

Recycle, reuse, or salvage at least how many %


of nonhazardous construction, demolition, and 50%
renovation debris?

Which unit should be used for calculation of


Weigh or volume
waste?

Which plan should be developed and


implemented that identifies the materials to be construction waste management plan
diverted from disposal?

How project can track all the construction and


waste hauler reports
demolition waste leaving the site?

Reused or recycled asphalt, brick, and concrete


(ABC) can account for no more than how many 75%
% of the diverted waste total?

Excavated soil, land-clearing debris,


Which materials waste do not qualify for this
alternative daily cover (ADC), and materials contributing
credit?
toward GIB Credit Building Reuse

Alternative daily cover (ADC) does not count as


diversion for nonhazardous construction and Total construction and demolition waste.
demolition debris but where it must be included?

On average, each person


4.43 pounds (2 kilograms).
generated how many pounds of waste per day, of
1.51 pounds (0.68 kilograms)
which only how many pounds was recycled or
composted?

On average, commercial construction generates


how many pounds of solid waste per square 3.9 pounds
foot?

Which plan outline, how each type of


material will be collected, disposed of, and solid waste management plan
diverted from the landfill?