You are on page 1of 2

LEAN SIX SIGMA YELLOW BELT B5

SESSION # 4
Value Stream Mapping (VSM)

Submitted By:
Sheraz Ali
Code:
655700
Department:
Industrial Engineering (IE)

STYLE TEXTILE PVT LIMITED


Assignment
Task:
Develop a Value Stream Map for a process of your choice Being
Performed on the workplace.
Assumptions:
Below is a value stream map of a Stitching line which shows how fabric (Cutting) comes from
warehouse to line and the different processes done on the fabric to achieve a final output. Assume
a line is capable of stitching 600 pcs of Crew Neck. The cycle time of Finishing, pressing, packing
is given below in box of a single unit and the total time (600 pcs) is mentioned at the bottom of
the diagram. All of these processes are accomplished under the control of production Department.
Note: Below Diagram is made by using an online Template of VSM available on “Creately.com”.

You might also like