Professional Documents
Culture Documents
Reduction of MMR: Guided by Sundaram B M, Plant Head Abhishek, Af
Reduction of MMR: Guided by Sundaram B M, Plant Head Abhishek, Af
GUIDED BY BY
SUNDARAM B M,PLANT HEAD PAVISH
ABHISHEK ,AF SHARAN RAJ
OBJECTIVE
To derive standard manpower for Manufacturing
unit and to reduce MMR applying cross
fertilization(benchmark) with other factories.
NO of In
Department Target KPR Category 11700 Target VA/RNVA/NVA in % RNVA/NVA Overall in %
Employees Numbers
Cutting S 14 VA 152 66%
Others S 51 VA 18 11%
SEWING NON MACHINIST CUFF FUSING ATTATCH NVA can be merged with cuff run 2
SEWING NON MACHINIST CUFF SERGING RNVA can be merged with cuff run 4