You are on page 1of 9

KONGUNADU COLLEGE OF ENGINEERING AND TECHNOLOGY

NAMAKKAL- TRICHY MAIN ROAD, THOTTIAM


DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING
INPLANT TRAINING ATTENDED FACULTY LIST

Summary Sheet:

Sl.No. Academic Year No of Faculty Visited


1. CAY: 2017-2018 16
2. CAY m1: 2016-2017 31
3. CAY m2: 2015-2016 6
4. CAY m3: 2014-2015 6

Bar Chart:

FILE IN-CHARGE HOD


Academic Year: (2017 -2018)

NO OF
S.NO DURATION NAME OF THE COMPANY FACULTIES
ATTENDED
1. 15.11.2017 WELSPUN SOLAR POWER PLANT 1
2. 16.11.2017 & 17.11.2017 LOTUS PULP MILLS 1
3. 1611/2017 - 18.11.2017 POWER INTEGRATED SOLUTIONS 5
4. 101.12.2017 – 03.12.2017 DS ELECTRONS, NAMAKKAL 1
5. 28.11.2017 & 29.12.2017 ARUN ENGINEERING, SALEM 1
6. 17.11.2017 & 18.11.2017 110/22KV, TANTRANSCO, SALEM 2
7. 30.11.2017 DMW ELECTRIC MOTORS 1
8. 21.11.2017 & 22.11.2017 NRCB, TRICHY 3
9. 28.11.2017 – 2.12.2017 WIZTECH AUTOMATION SOLUTIONS 1

FILE IN-CHARGE HOD


Academic Year: (2016 -2017)

NO OF
S.NO DURATION NAME OF THE COMPANY FACULTIES
ATTENDED
1. 24/5/2017 & 25/5/2017 ELECTROMOTIVE POWER DRIVES 1
2. 26/5/2017 TO 10/6/2017 WIZTECH AUTOMATION SOLUTIONS 2
3. 10/6/2017 & 11/6/2017 SRI BALAMURUGAN PAPERS AND BOARDS 2
4. 22/05/2017 TO 24.05.2017 ARUN ENGINEERING INDUSTIRES 7
5. 22/05/2017 TO 24.05.2017 WELSPUN SOLAR POWER PLANT 5
22/05/2017 TO
6. SWARGA LIGHTS 1
25/05/2017
18/11/2016 TO
7. SWARGA LIGHTS 2
21/11/2016
01/12/2016 TO
8. ISSOJET BURNER PVT LTD 1
03/12/2016
02/12/2016 TO
9. MEGAWIN SWITHCH GEAR 3
03/12/2016
12/06/2016 TO
10. MAHENDRA WATER UTILITIES LTD 1
14/06/2016
12/06/2016 TO SRI CHANDRA MOULISHVER SPINNING MILLS PRIVATE
11. 1
14/06/2016 LIMITED
07/06/2016 TO THE TAMILNADU CO-OPERATIVE TEXTILE PROCESSING
12. 1
12/06/2016 MILLS LTD
06/06/2016 TO
13. DEN INFRASTRUCTURE INDIA PVT.LTD 1
11/06/2016
06/06/2016 TO
14. SREE RAMAJAYAM ELECTRICALS 1
07/06/2016
01/06/2016 TO
15. LOTUS PULP MILLS 2
03/06/2016

FILE IN-CHARGE HOD


Academic Year: (2015 -2016)

NO OF
S.NO DURATION NAME OF THE COMPANY FACULTIES
ATTENDED
1. 6/6/2015 ELMEASURE INDIA PVT.LTD 1
2. 1/6/2015 TO 2/6/2015 SARANYA SPINNING MILLS LTD 1
3. 4/6/15 TO 5/6/15 SRI SELLANDIYAMMAN ELECTRICAL 1
4. 25/1/16 TO 30/1/16 BHARAT SANCHAR NIGAM LIMITED 1
5. 1/6/15 TO 3/6/15 ISSOJET PVT LTD 1
6. 1/6/15 TO 13/6/15 SALEM COOPERATIVE SUGAR MILLS LTD 1

FILE IN-CHARGE HOD


Academic Year: (2014 -2015)

NO OF
S.NO DURATION NAME OF THE COMPANY FACULTIES
ATTENDED
1. 25/5/15 TO 26/5/15 SARANYA SPINNING MILLS LTD 2
2. 27/5/15 TO 28/5/15 SARANYA SPINNING MILLS LTD 1
3. 29/5/15 TO 30/5/15 SARANYA SPINNING MILLS LTD 1
4. 30/5/2015 TO 31/5/2015 SRI SELLANDIYAMMAN ELECTRICAL 1
5. 27/5/15 TO 28/5/15 KEERTHANA HOSPITAL 1

FILE IN-CHARGE HOD


INPLANT TRAINING ATTENDED FACULTY LIST:

Academic Year: (2017 -2018)

NAME OF THE
S.NO DURATION NAME OF THE COMPANY
FACULTY
1. 16.11.2017 & 17.11.2017 LOTUS PULP MILLS P. GOKUL
2. 15.11.2017 WELSPUN SOLAR POWER PLANT P. GOKUL
P. ABISHRI
R. DEEBIKA
3. 1611/2017 - 18.11.2017 POWER INTEGRATED SOLUTIONS S. RAGUL
K. MAHESHWARI
N. DIVYA
4. 101.12.2017 – 03.12.2017 DS ELECTRONS, NAMAKKAL R. PANDIYAN
5. 28.11.2017 & 29.12.2017 ARUN ENGINEERING, SALEM K. KARTHIKEYAN
K. MOHANRAJ
6. 17.11.2017 & 18.11.2017 110/22KV, TANTRANSCO, SALEM
R. GOPALKRISHNAN
7. 30.11.2017 DMW ELECTRIC MOTORS T. MUTHUKUMAR
Dr. P. ARUL
8. 21.11.2017 & 22.11.2017 NRCB, TRICHY K. KARTHIK
T. RAJAMANIKANDAN
9. 28.11.2017 – 2.12.2017 WIZTECH AUTOMATION SOLUTIONS R. BOOMIDEVI

FILE IN-CHARGE HOD


Academic Year: (2016 -2017)

NAME OF THE
S.NO DURATION NAME OF THE COMPANY
FACULTY
24/5/2017 &
1 ELECTROMOTIVE POWER DRIVES PVT LTD N.RAJKUMAR
25/5/2017
26/5/2017 TO R.S.JANANI,
2 WIZTECH AUTOMATION SOLUTIONS
10/6/2017 R.BOOMIDEVI
10/6/2017 & K.KARTHICK,
3 SRI BALAMURUGAN PAPERS AND BOARDS
11/6/2017 S.SARANYA
S.RAGUL
K.MOHANRAJ
T.RAJAMANIKANDAN
22/05/2017 TO
4 ARUN ENGINEERING INDUSTIRES K.KARTHIKEYAN
24.05.2017
R.GOPALAKRISHNAN
R.DEEBIKA
N.DIVYA
Dr. M. KARTHIKEYAN,
N.RAJASEKARAN,
22/05/2017 TO
5 WELSPUN SOLAR POWER PLANT M.HARIPRABHU,
24.05.2017
A.C.DIVYA,
K.MAHESWARI
18/05/2017 TO
6 SWARGA LIGHTS R.PANDIYAN
25/05/2017

18/11/2016 TO R.PANDIYAN,
7 SWARGA LIGHTS
19/11/2016 N.RAJASEKARAN
01/12/2016 TO
8 ISSOJET BURNER PVT LTD R.HEMALATHA
03/12/2016
K.MOHANRAJ,
02/12/2016 TO
9 MEGAWIN SWITCH GEAR T.RAJAMANIKANDAN,
03/12/2016
R.GOPALAKRISHNAN
12/06/2016 TO
10 MAHENDRA WATER UTILITIES LTD N.RAJKUMAR
14/06/2016
12/06/2016 TO SRI CHANDRA MOULISHVER SPINNING MILLS PRIVATE
11 K.KARTHICK
14/06/2016 LIMITED
07/06/2016 TO THE TAMILNADU CO-OPERATIVE TEXTILE PROCESSING
12 S.RAGUL
12/06/2016 MILLS LTD
06/06/2016 TO
13 DEN INFRASTRUCTURE INDIA PVT.LTD R.JEEVANANTHAM
11/06/2016
06/06/2016 TO
14 SREE RAMAJAYAM ELECTRICALS M.HARIPRABHU
07/06/2016
01/06/2016 TO A.C.DIVYA,
15 LOTUS PULP MILLS
03/06/2016 S.SARANYA

FILE IN-CHARGE HOD


Academic Year: (2015 -2016)

NAME OF THE
S.NO DURATION NAME OF THE COMPANY
FACULTY
1. 6/6/2015 ELMEASURE INDIA PVT.LTD N.RAJKUMAR
2. 1/6/2015 TO 2/6/2015 SARANYA SPINNING MILLS LTD M.HARIPRABHU
3. 4/6/15 TO 5/6/15 SRI SELLANDIYAMMAN ELECTRICAL K.MOHANRAJ
4. 25/1/16 TO 30/1/16 BHARAT SANCHAR NIGAM LIMITED S.VANDHANA
5. 1/6/15 TO 3/6/15 ISSOJET PVT LTD R.HEMALATHA
6. 1/6/15 TO 13/6/15 SALEM COOPERATIVE SUGAR MILLS LTD R.PANDIYAN

FILE IN-CHARGE HOD


Academic Year: (2014 -2015)

NAME OF THE
S.NO DURATION NAME OF THE COMPANY
FACULTY
S.HEMALATHA
1. 25/5/15 TO 26/5/15 SARANYA SPINNING MILLS LTD
S.SHARMILA
2. 27/5/15 TO 28/5/15 SARANYA SPINNING MILLS LTD N.RAJASEKARAN
3. 29/5/15 TO 30/5/15 SARANYA SPINNING MILLS LTD V.VINOTHKUMAR
30/5/2015 TO
4. SRI SELLANDIYAMMAN ELECTRICAL T.RAJAMANIKANDAN
31/5/2015
5. 27/5/15 TO 28/5/15 VINODHAGAN MEMORIAL HOSPITAL (P) LTD S.VANDHANA

FILE IN-CHARGE HOD

You might also like