0% found this document useful (0 votes)
115 views3 pages

DVC Quốc Gia: Sample Inspection Report

This inspection report summarizes the measurement of various dimensions of a part against specifications from engineering drawings. It lists 24 dimensions that were checked on 3 samples, and whether the measurements for each fell within the allowed tolerances. For 5 dimensions, at least one sample measurement was outside the allowed range. The development and quality departments must decide whether to approve or reject the parts based on the test results.

Uploaded by

Jeeva Rajappan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views3 pages

DVC Quốc Gia: Sample Inspection Report

This inspection report summarizes the measurement of various dimensions of a part against specifications from engineering drawings. It lists 24 dimensions that were checked on 3 samples, and whether the measurements for each fell within the allowed tolerances. For 5 dimensions, at least one sample measurement was outside the allowed range. The development and quality departments must decide whether to approve or reject the parts based on the test results.

Uploaded by

Jeeva Rajappan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Sample Inspection Report

Measuring Report
Report-No/Nr.: Rev. RP-No./Nr.: Rev. Page: 1 of 1
Supplier: Serial No.: Ordering No.:
Nash Industries 9001005546 60100009262043

Drawing No.: Part Designation: Supplier No.:


55000001011290 FRONT RAIL 459019
Drawing Status: Quantity Ordered:
No Status 39 x
Name / Dept.: Phone: Date: Signature:
SATHISH A 9742931000 07.04.2023

Incoming Incoming Incoming Drawing Date /


No.: Date: Quantity: Status: Name:

Remark

Development department Decision Comment:


Release
No Release
Limited Release until Date Part responsible: Department: date:

Quality department Decision Comment:


Release
No Release
Limited Release until Date Responsible: Department: date:

Part weight

Modify tool by BSH


Change Drawing
Test results Cavity of

Correct tool by
1 1 (measured):

supplier
Formnest
Teile-Gewicht:
Item-No.: New target
Nominal value Upper allowed Lower allowed Additional Information Actual value (Supplier) Actual value (Customer)
value Remarks (e.g. No. of
Drawing deviation deviation Name
Measured Parts)
Field: 1 2 3 1 2 3

1 3.95 0.4 -0.2 CMM 1.64 1.57 1.62 NOT OK


11 329 0.5 -0.5 LHG 329.38 329.22 329.32 OK
13 40.5 0.5 -0.5 LHG 40.12 40.25 40.3 OK
15 16 0.2 0 LHG 16.16 16.12 16.02 NOT OK
16 25 0.8 -0.8 LHG 25.02 24.96 25.04 OK
17 3 0.2 -0.1 DVC 3.09 3.14 3.06 OK
19 157 0.3 -0.3 LHG 157.08 157.16 157.14 OK
20 12.5 0.5 -0.3 LHG 12.62 12.54 12.44 OK
21 31.25 1 -1 LHG 31.26 31.22 31.18 OK
22 3.25 0.3 -0.3 LHG 3.85 3.82 3.8 NOT OK
23 3 0.1 -0.1 LHG 3.12 3.22 3.16 NOT OK
24 3.3 0.3 -0.3 LHG 3.24 3.2 3.08 OK
25 3 0.3 -0.3 RG

27 5 0.3 -0.3 RG

28 3.25 0.3 -0.3 LHG 3.47 3.25 3.36 OK


29 3 0.3 -0.3 RG

30 12 0.1 -0.1 DVC 11.98 12.02 11.99 OK


33 140 0.4 -0.4 LHG

74 2.8 0.5 -0.5 LHG 2.83 2.88 2.9 OK


75 0.75 0.15 -0.15 LHG 0.64 0.72 0.74 OK
76 12.5 0.5 -0.5 DVC 12.52 12.45 12.48 OK
78 0 0.5 -0.5 DHG 0.05 0.12 0.18 OK
90 3 1 0 PP 3.04 3.08 3.06 OK
91 2.5 0.5 -0.5 CMM 2.67 2.58 2.56 OK
93 52.2 0.8 -0.4 CMM 52.08 52.04 52.02 OK
95 35.75 0.3 -0.3 CMM 35.51 35.57 35.6 OK
96 7.3 0.3 -0.3 IMAGINARYPOINT

129 7.4 0.3 -0.3 CMM 7.58 7.44 7.54 OK


130 18.2 0.3 -0.3 CMM 17.72 17.88 17.7 NOT OK
100 29 0.15 -0.15 CMM 29.38 29.44 29.46 NOT OK
101 28.65 0.15 -0.15 CMM 29.18 29.24 29.2 NOT OK
102 29 0.15 -0.15 CMM 28.89 28.87 28.95 OK
103 12.5 0.25 -0.25 CMM 12.68 12.62 12.66 OK
104 24.4 0.3 -0.3 DVC 24.54 24.48 24.62 OK
105 7.6 0.3 -0.3 PP 6.24 6.12 6.18 NOT OK
108 6 0.3 -0.3 PP 7.8 7.72 7.68 NOT OK
110 8.2 0.3 -0.3 DVC 8.34 8.3 8.36 OK
118 8.1 0.3 -0.3 DVC 7.82 7.98 7.96 OK
117 28.65 0.15 -0.15 CMM 29.12 29.16 29.08 NOT OK

FRONT RAIL SIR - Final Updated - Copy BSH SIR V16.0 Dec. 2018
Date of print: 4/8/2023 Measuring Report V14.8
111 29 0.15 -0.15 LHG 29.17 29.18 29.22 NOT OK
238 27 0.3 -0.3 LHG 27.22 26.98 26.92 OK
127 7.4 0.3 -0.3 CMM 7.85 7.92 7.9 NOT OK
128 18.2 0.3 -0.6 CMM 17.78 17.9 17.96 OK
114 35.75 0.3 -0.3 LHG 35.65 35.68 35.7 OK
115 41.75 0.4 -0.4 LHG 41.85 41.82 41.86 OK
116 49.75 0.6 -0.6 LHG 49.74 49.78 49.68 OK
126 356.7 0.3 -0.3 LHG 356.62 356.88 356.72 OK
120 290 0.3 -0.3 LHG 289.74 289.76 289.7 OK
122 524 0.5 -0.5 CMM 523.72 523.7 523.68 OK
123 570 0.5 -0.5 LHG 568.82 568.84 568.79 NOT OK
12B 580 0.3 -0.3 LHG 579.22 579.3 579.18 NOT OK
124 584 0.8 -0.8 LHG 583.71 583.68 583.74 OK
107 197.3 0.5 -0.5 CMM 197.58 197.6 197.22 OK
213 578 0.5 -0.2 CMM 578.22 578.18 578.12 OK
212 575 0.3 -0.3 CMM 575.12 575.08 575.14 OK
233 15 0.3 -0.3 IMAGINARYPOINT 14.88 14.9 14.89 OK
234 1.5 0.3 -0.3 CMM 1.7 1.68 1.62 NOT OK
214.1 5 0.3 -0.3 IMAGINARYPOINT 5.02 5.05 5.06 OK
214.2 5 0.3 -0.3 DVC 5.09 5.08 5.04 OK
162 6 0.1 0 DVC 6.02 6.01 6.06 OK
163 9.2 0.3 -0.3 DVC 9.21 9.18 9.24 OK
161 0.35 0.1 -0.1 DHG 0.17 0.12 0.16 NOT OK
48 5 0.3 -0.3 DVC 5.06 5.04 5.02 OK
43 3 0.3 -0.3 CMM

47 3 0.3 -0.3 RG

59 3 0.3 -0.3 CMM

60 2.8 0.15 -0.2 DVC 3.08 3.12 3.06 NOT OK


61 4.1 0.1 -0.1 DVC 4.06 4.11 4.14 OK
137 42.75 0.3 -0.3 LHG 42.68 42.72 42.78 OK
136 8.11 0.6 0 DHG 8.32 8.38 8.44 OK
149 11.25 0.2 -0.2 LHG 11.22 11.35 11.32 OK
268 11 0.1 -0.4 LHG 11.08 11.02 11.04 OK
270 15.2 0.5 -0.5 LHG 15.52 15.44 15.46 OK
254 0 0.2 -0.2 DHG 0.45 0.52 0.48 NOT OK
217 28 0.3 -0.3 LHG 28.07 27.98 28.06 OK
256 23.15 0.3 -0.3 LHG 23.38 23.32 23.28 OK
250 32.4 0.3 -0.3 LHG 31.58 31.62 31.68 NOT OK
255 33.6 0.4 -0.4 LHG 33.08 33.1 33.12 NOT OK
205 28 0.2 -0.2 PP 27.98 28.02 28.06 OK
207 0.7 0.3 -0.3 LHG 0.88 0.9 0.94 OK
206 0.7 0.3 -0.3 LHG 0.92 0.86 0.96 OK
208 255 0.5 -0.5 LHG 255.22 255.34 255.18 OK
209 115 0.2 -0.2 LHG 115.12 115.06 115.08 OK
189 0 0.4 CMM

191 3.3 0.3 -0.3 LHG 3.48 3.52 3.56 OK


203 5 0.3 -0.3 RG

193 38 0.2 -0.2 PP 37.95 37.99 38.02 OK


204 28 0.2 -0.2 PP 28.12 27.98 27.99 OK
194 3 0.2 -0.1 CMM 3.24 3.28 3.22 NOT OK
195 12 0.1 -0.1 LHG 11.96 11.98 12.02 OK
196 3 0.2 -0.1 CMM 3.12 3.06 3.08 OK
201 0 0.4 CMM

199 2 0.3 -0.1 LHG 2.41 2.52 2.58 NOTOK


200 4.1 0.1 -0.1 LHG 4.12 4.08 4.06 OK
178 12 0.2 -0.2 LHG 12.74 12.68 12.54 NOTOK
282 193 0.5 -0.5 LHG 193.02 193.08 193.12 OK
333.1 1.65 0.2 0 DVC 1.78 1.68 1.72 OK
333.2 1.65 0.2 0 DVC 1.78 1.74 1.76 OK
334 6.3 0.1 -0.1 LHG 6.27 6.28 6.29 OK
337 6.3 0.1 -0.1 LHG 6.27 6.18 6.22 NOTOK
336 16.4 0.3 -0.3 LHG 16.39 16.32 16.28 OK

FRONT RAIL SIR - Final Updated - Copy BSH SIR V16.0 Dec. 2018
Date of print: 4/8/2023 Measuring Report V14.8
338 4 0.5 0 LHG 4.23 4.34 4.2 OK
339 8.5 0.5 0 LHG 8.54 8.58 8.6 OK
299 59.86 0.3 -0.3 CMM

332 10 0.1 -0.1 LHG 10.03 10.06 10.04 OK


340 29.75 0.2 -0.4 CMM

314 5 0.3 -0.3 DVC 5.08 5.04 5.02 OK


301 171 0.4 -0.4 LHG 170.78 170.88 170.89 OK
310 53 0.1 -0.1 LHG 52.49 52.38 52.44 NOT OK
298 30 0.3 -0.3 LHG 29.62 29.58 29.64 NOT OK
331 16.1 0.2 0 LHG 16.22 16.14 16.18 OK
328 10 0.2 -0.1 DVC 10.05 10.02 10.08 OK
329 12 0.1 0 LHG 12.09 12.04 12.02 OK
330 4 0.2 -0.1 DVC 4.12 4.08 4.11 OK
323 112 0.3 -0.3 LHG 112.14 112.12 112.08 OK
324 5 0.3 -0.3 DVC 5.03 5.04 5.08 OK
296 168 0.2 -0.2 LHG 167.98 168.02 168.09 OK
297 147 0.4 -0.4 LHG 147.04 147.02 146.98 OK
320 10 0.1 0 DVC 10.04 10.06 10.09 OK
320.1 10 0.1 0 D 10.03 10.02 10.06 OK
325 10 0.1 0 DVC 10.02 10.08 10.04 OK
326 16.1 0.1 0 LHG 16.09 16.04 16.06 OK
321 12 0.1 0 LHG 12.04 12.08 12.02 OK
322 4 0.2 -0.1 DHG 4.13 4.08 4.14 OK
286 6 0.1 0 DVC 6.02 6.08 6.04 OK
295 355 0.3 -0.3 LHG 355.21 355.18 355.14 OK
127 0.3 -0.3 LHG 127.68 127.48 127.46 NOT OK
283 76 0.5 -0.5 LHG 76.32 76.28 76.34 OK
17K 72.7 0.3 -0.3 DHG 72.96 72.88 72.92 OK
284 6.4 0.3 -0.3 DVC 6.54 6.58 6.62 OK
291.1 6 0.3 -0.3 DVC 6.08 6.09 6.04 OK
291.2 6 0.3 -0.3 DVC 6.06 6.02 6.08 OK
292 5 0.1 -0.1 DVC 5.06 5.04 5.09 OK
293 6.3 0.1 -0.1 CMM 6.39 6.32 6.36 OK
327 10 0.1 -0.2 DVC 10.02 10.06 10.04 OK
289 15.5 0.2 -0.2 DHG 15.17 15.28 15.22 NOT OK
315 5 0.3 -0.3 DVC 5.05 5.04 5.09 OK
294 29.25 0.3 -0.3 CMM 29.98 29.88 29.78 NOT OK
230 28 0.3 -0.3 DVC 28.03 28.12 28.24 OK
229 6 0.6 -0.4 DVC 5.94 5.98 6.02 OK
218 6 0.4 -0.4 DVC 5.92 5.98 6.08 OK
235 94 0.8 -0.8 LHG 96.69 96.72 96.68 NOT OK
236 193 0.3 -0.3 LHG 193.42 193.48 193.34 NOT OK
222 36 0.4 -0.4 LHG 36.22 36.32 36.28 OK
224 5 0.5 -0.5 LHG 5.28 5.22 5.18 OK
227 25 0.3 -0.3 LHG 25.22 25.18 25.25 OK
220 2.5 0.3 -0.3 LHG 2.32 2.38 2.22 OK
223 9 0.3 -0.3 LHG 9.04 9.09 9.06 OK
24 3.3 0.3 -0.3 CMM 3.12 3.16 3.08 OK

FRONT RAIL SIR - Final Updated - Copy BSH SIR V16.0 Dec. 2018
Date of print: 4/8/2023 Measuring Report V14.8

You might also like