INVENTORY BLASTING
MAP PIT WARUTAS
PIT TENGAH
UPDATE :
Jum'at, 16-12-2022

BL-47

BL-62 P3
7
BL-65

BL-59 BL-63 P3
BL-74 8

BL-68

BL-17 BL-34
P4 P3
0 9
P4
Range Code Number
(Acuan CUT ketebalan inventory)
Layar 1
Layar 2
Layar 3
BL-21 1 NOTE:
HARAP TINGGI FRONT DISESUAIKAN DENGAN KEDALAMAN INVENTORY BLASTING
AGAR RECOVERY DAPAT TERLOADING MAKSIMAL
Owner :
BLASTING GEOMETRI EVALUATION
No. Of Elevasi Blasting Blasting
No. Of Actual Volume By Blasting Inventory REMAKS
Date Location Burden Spacing Avg. Depth Area survey Recovery Removal
Inventory Broken Material
Blast Holes Survey Awal BOB Act Cut

meter meter Hole meter sq meter BCM M M M M BCM % BCM Material terendam air 16991.4 BCM
BL-17A 29-Jun-22 PIT WARUTAS 8.00 9.00 50 6.7 1,322 8,862.69 17.5 10.8 13.3 2.49 3291.80 63% 5,571 Jalan
Material di Bench 0.0 BCM
BL-21 11-Jul-22 PIT WARUTAS 8.00 9.00 50 7.1 3,609 25,700.86 23.8 16.7 18.3 1.67 6026.50 77% 19,674 Jalan
BL-34 22-Aug-22 PIT WARUTAS 8.00 9.00 50 7.5 3,597 26,758.82 19.2 11.8 15.3 3.55 5230.99 80% 21,528 Material di buat jalan 9318.3 BCM
Contractor : BL-47 22-Sep-22 PIT WARUTAS 8.00 9.00 38 6.7 2,945 19,514.02 -2.8 -9.5 -3.7 5.83 16991.35 13% 2,523 Air Material diluar design 0.0 BCM
BL-59 27-Oct-22 PIT WARUTAS 8.00 9.00 40 6.4 2,788 17,661.26 8.2 1.9 6.0 4.13 11499.15 35% 6,162 Not Aviable 26309.6 BCM
BL-62 14-Nov-22 PIT WARUTAS 8.00 9.00 40 6.3 2,912 18,459.82 -4.3 -10.6 -7.3 3.26 9493.49 49% 8,966
Available 76598.2 BCM
BL-63 15-Nov-22 PIT WARUTAS 8.00 9.00 40 6.8 2,868 19,616.35 0.0 -6.8 -3.3 3.46 9915.77 49% 9,701
BL-65 17-Nov-22 PIT WARUTAS 8.00 9.00 50 6.4 3,602 23,106.22 -0.5 -6.9 -4.0 2.91 10465.51 55% 12,641 Total Broken material 102907.9 BCM
BL-68 23-Nov-22 PIT WARUTAS 8.00 9.00 50 6.3 3,637 22,951.06 6.6 0.3 2.3 2.00 7271.14 68% 15,680 Total Recovery 49.7%
BL-74 12-Des-22 PIT WARUTAS 8.00 9.00 46 6.7 3,376 22,518.19 3.7 -3.0 3.5 6.45 21688.55 4% 830
TOTAL 8 9 554 6.6 37,575 245,731.69 102,907.9 49.7% 122,185