STRIP FOOT

Bearing Capacity = 110


FE = 500
FC = 20
PRESSURE
Grid AREA LENGTH WIDTH Width PRESSURE MOMENT
P GRID (KN/M) per PROJ
point m 2
m m adopted m (KN/M )
2
(kNm)/m
m
1 199
2 198 3.97 5.68 0.699 1.524 45.86 69.91 0.587 11.860
3 0 1-1 18.63
2.293 5.00 69.91
18.000 7.500 Overall Depth D =

4 304.1016
5 448.719 11.38 5.79 1.965 1.982 99.16 196.50 0.791 46.513
6 385.4278 2-2 19.00
6.445 6.50 196.50
19.000 0.000 Overall Depth D =

7 214.6019
8 270.4579 7.03 6.00 1.173 1.220 96.16 117.27 0.870 54.527
9 218.0758 3-3 19.67
3.846 4.00 117.27
19.000 8.000 Overall Depth D =

% of steel M15 M20 M25


0.15 0.28 0.28 0.29
0.25 0.35 0.36 0.36
0.50 0.46 0.48 0.49 X Y
0.75 0.54 0.56 0.57 X1,Y1 0.15 0.28 X1,Y1
1.00 0.60 0.62 0.64 X,Y 0.15 0.280 X,Y
1.25 0.64 0.67 0.70 X2.Y2 0.25 0.36 X2.Y2
1.50 0.68 0.72 0.74
1.75 0.71 0.75 0.78
2.00 0.71 0.79 0.82
2.25 0.71 0.81 0.85
2.50 0.71 0.82 0.88
2.75 0.71 0.82 0.90
3 0.71 0.82 0.92

CG of
Distance Load
of col Total Length Total Length
load CG of from of strip of strip
Column from left Load from right footing from footing from
SN Load edge left edge edge left right
1.00 100.00 0.15 15
2.00 900.00 5.15 4635
7.09 8.21 14.170968 16.429032
7.09 8.21 14.170968 16.429032
3.00 400.00 10.15 4060
4.00 150.00 15.15 2272.5
1550.00 10982.5
STRIP FOOTING

Ast Ast
d required dadopt spacing spacing %
c b a reqd rebar adopted Vu (kN)/m τv
(mm) (mm) mm inch adopted
mm2 mm2

66.774 300 27265.21 -300 0.025 91.583 12 215.31 6 753.60 0.25 19.76 0.066

113.04
Overall Depth D = 350.00 Ast min = 525.00

132.235 300 106925.68 -300 0.025 367.685 12 215.31 8 565.20 0.19 73.01 0.243

113.04
Overall Depth D = 350.00 Ast min = 525.00

143.174 300 125348.57 -300 0.025 433.488 12 215.31 10 452.16 0.15 82.15 0.274

113.04
Overall Depth D = 350.00 Ast min = 525.00

X Y X Y
0.15 0.28 X1,Y1 0.15 0.28
0.19 0.312 X,Y 0.19 0.312
0.25 0.36 X2.Y2 0.25 0.36
τc REMARK

0.36 SAFE

0.32 SAFE

0.29 SAFE
Combined Footing Format
Bearing Capacity = 110
Fy = 500
Fck = 20

Joint Reaction From ETABS


Grid A-A
Node Rxn
1 199
2 198
3 0
397

Required Area of Footing = 3.97 m2

Available Length for footing = 18.63 ft 5.68 m


Required width of footing = 0.70 m 2.293 ft
Provided Width = 5.00 ft

Soil pressure = 45.9 OK

Projection = 0.587

Moment = 11.867089

d required = 66.79
d adopted = 300 mm

c= 27280.664 X
b= -300 X1,Y1 0.25
a= 0.025 X,Y 0.44
X2.Y2 0.5
Ast required = 91.6353 mm 2

Rebar used = 12 mm 113.04


Spacing required = 26.666667 mm
Spacing Provided = 6 in
Ast adopted = 753.6 mm2 % of steel M15
% adopted = 0.2512 0.15 0.28
0.25 0.35
Vu (kN/m) = 19.769076 0.50 0.46
τv = 0.0658969 0.75 0.54
τc = 0.451 SAFE 1.00 0.60
1.25 0.64
1.50 0.68
1.75
2.00
2.25
2.50
2.75
Y
0.36
0.451
0.48

M20 M25
0.28 0.29
0.36 0.36
0.48 0.49
0.56 0.57
0.62 0.64
0.67 0.70
0.72 0.74
0.75
0.79
0.81
0.82
0.82
TABLE: Joint Reactions
Story Joint Label
Load Case/Combo FX FY FZ MX MY MZ
kN kN kN kN-m kN-m kN-m
Base 1 RXN 2.7656 2.8092 197.6836 -1.2074 1.4831 0.0059
Base 2 RXN 2.888 -0.3162 347.7144 0.2883 1.5114 0.0059
Base 3 RXN 5.157 -2.1254 287.7217 1.1494 2.5558 0.0087
Base 4 RXN 3.077 4.0693 304.1016 -1.8349 1.632 0.0059
Base 5 RXN 1.7269 -1.3583 448.719 0.7625 0.9554 0.0059
Base 6 RXN 1.0816 -2.286 385.4278 1.2079 0.6166 0.0059
Base 7 RXN -6.1158 2.0405 214.6019 -0.901 -2.7644 0.0059
Base 8 RXN -4.5082 -0.4842 270.4579 0.308 -2.0276 0.0059
Base 9 RXN -6.0721 -2.3412 218.0758 1.1976 -2.8069 0.0059
2674.504