You are on page 1of 1

DAHANUKARWADI MALAD WEST

CONTRACTOR
LEGEND:-

STRAIGHT TITLE:-
UP LINE
THIS DRAWING IS THE PROPERTY OF

TRANSITION GENERAL ARRANGEMENT DRAWING FOR LINE-2A OF MUMBAI


METRO,MMRDA FROM DAHISAR EAST TO VALNAI (EXCL.)
MMRDA, MUMBAI

CURVE 328, 3RD FLOOR,


CHECKED BY:- APPROVED BY:-
UDYOGSHEEL MAHILA SAHKARI
TURNOUT SAMITI 120,
MATHURA ROAD, OPPOSSITE
AEN/Track JGM/Track
APOLLO HOSPITAL NEW
DEHLI-110076 , INDIA SCALE:-
DRAWN BY:- CHECKED BY:- VERIFIED BY:- DATE:- 03.12.2021 REV:- R0 STATUS:- AS BUILT
PROJECT: REFERENCE NO.:- H=1:1000, V=1:250
DMRC/MUMBAI/LINE-2A/GAD/2017(REV.9)
MUMBAI METRO RAIL PROJECT SHEET NO. SHEET SIZE
LINE-2A OF MMRDA DRAWING NO.:- DMRC/MMRDA/LINE-2A/UP/GAD/001
Bushra Khatoon/Sr. Engineer Bishnu Mandal/DPM Track Deepak Mohanty/Project Manager 13 OF 13 A0

You might also like