You are on page 1of 1
item as |Specification Manufacture Proccess of Manufacture SURYA ROSHNI LIMITED Technical Data Sheet : ERW Pipes 1S 1239 (Part-1) :SURVA ROSHNI LIMITED (Anjar), INDIA | + ELECTRIC RESISTENCE WELDED (ERW) Dste-30.03.2023, S.No. Characteristic Description. Remark 1) frtansfacture Surya Roshal Limited, Trade MARK Prakash Surya 2} |Applicable Specification Is 1239(Pare-1}:2004 i F [RM Supplier 3) |steat ie oils confirming to 1:10748 Gr-2 laninstessamy(ssw/TATAY sai. 4) [size sone & 100N8 Gt, 5) |etass eave 6) outside diameter [aS PER 1S:1239 (2004) 7)_|Wallthickness -10% of specified WT /+ N.S. (FOR HEAVY) 8) [weight [as PER 1S:1239 (2004) 9) straightness |as PER IS:1239 (2004) As per WO/PO requiremet or Al pipe canbe supaled with inthe length 10) standard Length ie 11) Pine Ends Plain Ends i 12) [chemical analysis [As PER 1S:1239 (2004) 13) | mechanical Testing Jas PER 18:1239 (2004) 1 When tasted in aecardance with 15 2579 the tubes shall be capable of withstanding the bend tet without showing any signs of fracture or ‘Welded tubes shall be bent withthe weld at 90 degree tothe ending. The tubes shall be not be filled for ths test 14) [bend Test |Gaivanizag tubes shall be capable of bending bent co, without lraking of the steel, through 90 degree round 2 Jcrmer having a radius atthe bottom of the groove equal to lat leat ight timer the outede clameter of the tubes. Ringe not les than AOrim I Tengih eat Wom the ends of he selected lubes shall be flattened cald between parallel plates withthe weld, if any at 90 degree (point of maximum Bending) In aczordance with IS 2328.No opening shall be occur by fracture in the weld area until the 15) |riateing Tet distance betweun the plates is less tha 75% of the orginal OD of the lube and no cracks or breaks inthe metal elsewhere than in the weld shall occur until the distance between the plates is less than 60 percent ofthe original 0D. Hydrostatic test shall be carried out at a pressure of SMDpa at the same ab], senate Bete maintaned for atleast 3 and shall not show any leakagein the pipe. 17) |Surface protection (as per PO requirement) Hot dip Galvanized Inne Zine coating on the tubes shall bein Accordance with IS: 4736, las PER 1S:1239 (2004) _ PREPARED) on CEES APPROVED BY

You might also like