You are on page 1of 4
Seb: ST-TZICBG-2018 FIT-UP INSPECTION REPORT FHCAMiL: Client: LEAP: Project Name: Pan BPR: Product Name: eA Third Party Company: HME A: EB CRE) BAA IRA a] Tianjin Lotov Industry Co., Ltd rinses FL 1316 Steel Structure for Singapore T316 MM 1-1, 1-2, 1-3, 1-4 Lintel Beam 1-1, 1-2, 1-3, 1-4 FAT TA BEAR GIR ZS Ww Kitt AHLAAMRAARAA Wis: 022-28638899 fF: 022-28638866 ‘Tianjin First Arrive Engineering NOT Co, LTD. Email: stjc@tjsticcn Fit: wwwntstje.com Be 5 1, WIR ERA “RAT A ATE AA ORAS)” TS AD, ARR Ae 2, KARR, TAA. TIER. EE IP SABER. 3. AHIR RTA HUME PT TAL. ICU ERAS O E S Ri . 4 AURA EMT, FT PURE Z Ae 15 APRA, MOAN HES 5. RAKAMAR, AGM GM, SEER. 6. RT REET G, ARLE ATE, IR T MARTI, ARN TMAR A a Se BH SE CATAL SUET RG Te RAP SIRE RD, ACU RL BCE HA HE FOAMS CREED TUB RR RAPS” Jae: HUB Bet Se Instruction 1, The test report shall be provided with the special test seal and cross seal of ” Tianjin First Arrive Engineering NDT Co., Ltd.” and any missing is invalid, 2. The test report is invalid if it is altered, the number of pages is incomplete, it is changed or it is handwritten except for signature. 3, This report is only responsible for the operation during this test and the data obtained during this test. 4, If you have any objection to this report, please submit it to our company within 15 days from the date of receiving the report. If it s overdue, it will not be accepted. 5, The test report shall not be copied without the consent of the company, and the copy is invalid. 6, If it belongs to sample delivery test, this test report is only responsible for the samples; For on-site inspection, this inspection report is only responsible for the inspection results of the entities and parts of the inspected products; for sampling test, this test report is only responsible for sampling samples. First Arrive people adhere to the concept of “Scientific, Accurate, High-quality, Efficient, Sustainable development and User satisfaction” to provide customers with high-quality testing services. Tianjin First Arrive Engineering NDT Co., Ltd, N] FR AGLAAWRAARAA Site Tianjin First Arrive Engineer 1G NOT Co, LTD, Wid: 022-28638899 Email: stjc@tstjc.cn 46H: 022-28638866 Fethks wwwtstje.com Document No:ST-TZJC20-2018 Fit-up Inspection Report $R#iti Roport No. + _YDZZ-NT (BG) 2023-028 Page 1 of 1 5 ici He HARA RS peal I was No. litem Description| Quantity] Item Size Heat No. __ | Inspection Date| Drawing No. STEEL PLATES 2 /2100x325x25m Iwrai6TuN-craiia and * Vearta 5 lm P3ND0210 2023-3-20 IupraieTUN-cr4ii3 }2100x550x25m IMT326TUN-cT4113 and 2 |srecreuares2 | a [2 panpoz10 2023320 Me 1400x250x25m Iwraerun-craiii and 3 |sreeveuaress | os | 23npo210 2023320 }2100%425x25m Iur3i6TUN-cr4iia and 4 |srecreuaresa | a [2 panpoz10 2023320 aaa 5 Isreeu evar Iwr3i6run.-cr4tii and sreevptatess | 64 |350x250x20mm |23no0221 2023320 Me Ivr3i6TUN-cr4iia and 6 |steeetatess | 16 |550x250x25mm |23ND0210 2023320 aaa 7 IMr3i6ruN-cr4tia and sreeupLates7 | 80 |550x250x20mm |23no0221 2023320 MEE END PLATE Iwraierun-cr4iia and oe 16 |3s0x340«25mm |23ND0210 2023.3.20 On asaxzsaxi67 IMT326TUN-CT4112 and 9 Jucuams Chere lwesa03023 2023320, Me During inspection the above items found satifactory as per the drawings. EA Inspector: Hh 12023443201 12023443 201 TFA Approved by: alt if th A LRAWRKARGA) Wid: 022-28638899 {£4 022-28638866 st Anive Engineering NOT Co, 17. Email: stjc@tjst.cn FAKE: wwwrtistjccom Fit-up Inspection Report AR Report No. + _YDZZ-MT(BG)-2023-028 Page 2 of 2

You might also like