Grandeza Resources provided a bill to Mudim SMU Darul Anuar for work installing flooring tiles at the school. The bill details 871 square feet of brown floor tiles at RM2.80 per square foot, along with cement, grout, and labor costs to remove the old floor, lay the tiles, and install cabinets. The total cost was RM6032.30 with 50% required as a deposit and the balance due after completion of the work. Payments should be made to Grandeza Resources' Maybank account.
Grandeza Resources provided a bill to Mudim SMU Darul Anuar for work installing flooring tiles at the school. The bill details 871 square feet of brown floor tiles at RM2.80 per square foot, along with cement, grout, and labor costs to remove the old floor, lay the tiles, and install cabinets. The total cost was RM6032.30 with 50% required as a deposit and the balance due after completion of the work. Payments should be made to Grandeza Resources' Maybank account.
Grandeza Resources provided a bill to Mudim SMU Darul Anuar for work installing flooring tiles at the school. The bill details 871 square feet of brown floor tiles at RM2.80 per square foot, along with cement, grout, and labor costs to remove the old floor, lay the tiles, and install cabinets. The total cost was RM6032.30 with 50% required as a deposit and the balance due after completion of the work. Payments should be made to Grandeza Resources' Maybank account.