You are on page 1of 3

TT5119 Requirements Traceability Matrix

Template

Version 2.0
31 July, 2015
Version 2.0

Instructions for completing this template

1 This TT5119 Requirements Traceability Matrix Template is used in conjunction with the
Requirements Management Activity
2 All of the projects requirements (business, product, and product component) should be
documented in this matrix.
3 The requirements identification schema should allow traceability between source
requirements and derived requirements.
4 If the System Test Plan references the requirements, the System Test Case ID column
can be eliminated.

Field Name Description/Instructions


ID Unique identifier for a requirement
Description Brief description of the requirement
Strategic Requirements Unique identifier for the document, page, and section that a strategic requirement is
documented.
Business Requirements Unique identifier for the document, page, and section that a business process
requirement is documented.
Software Requirements Unique identifier for the document, page, and section that a implementation requirement
is documented.
Systems Integration Requirements Unique identifier for the document, page, and section that a systems integration
requirement is documented.
Infrastructure Requirements Unique identifier for the document, page, and section that an infrastructure requirement
is documented.
Operational Requirements Unique identifier for the document, page, and section for an operational requirement.
Detailed Design Documentation Unique identifier for the document, page, and section for the detailed-level design of the
requirement, including diagrams, schema.
Subsystem Unique identifier for the subsystem that will implement the requirement
Module Unique identifier for the module that will implement the requirement
Program Unique identifier for the program that will implement the requirement
System Test Case ID Unique identifier for the system test, test case that will verify the requirement.
Final Line of Page

TT5119 requirements traceability matrix template


2
PwC
Version 2.0

Requirements Matrix

ID Phase/Deliverable Work Package Requirement Description


REQ001 Strategy & Asses As-is analysis Strategy: Mission, Vision, Values, Objective Business Mission, Vission, Quality Policy and Values.
REQ002 Strategy & Asses As-is analysis PESTEL Analysis Assess business environment and market forces.
REQ003 Strategy & Asses As-is analysis Business capabilities assessment Assess current status of process, technology, organisation and people.
REQ004 Strategy & Asses Requirements analysis Benchmarking Benchmarks related to business industry.
REQ005 Strategy & Asses Requirements analysis Market Study Carry out a study of offering and supply, pricing, products, place, and promotion.
REQ005 Strategy & Asses Gap Analysis Gap Analysis Carry out a gap analysis between strategy-benchmarks and business capabilities-environment.
REQ006 Strategy & Asses High level TOM TOM Proposal Interaction Model, process and technology architechture, organisation chart, and function description.
REQ007 Strategy & Asses Insights SWOT Analysis Analysis of Strenghts, Weaknesses, Opportunites and Threats.
REQ008 Desing Business Capabilities Design Principles Rules based on SWOT analysis and market study to deliver value through TOM.
REQ010 Desing Detailed TOM Faciities Layout and Location Carry out a layout with main operative and managerial areas (offices).
REQ011 Desing Detailed TOM Technology and Systems
REQ012 Desing Detailed TOM Governance
REQ013 Desing Detailed TOM Processes
REQ014 Desing Detailed TOM People
REQ015 Desing Business Case (BC) Project Appraisal Market Study, Technical Study, Impact Study (Social and Environmental) and Financial Study
REQ016 Construction Service Delivery Model (SDC)
REQ017 Construction Facilities Location and Distribution
REQ018 Construction Technologies and Systems Architecture
REQ019 Construction Governance Built
REQ020 Construction Process Manuals
REQ021 Construction People Capability Framework
REQ022 Construction Legal Constitution
REQ023 Implement SDC Release
REQ024 Implement Facilities Occupation
REQ025 Implement Technology Cutover
REQ026 Implement Organisational Changes Implementation

TT5119 requirements traceability matrix template


3
PwC

You might also like