Professional Documents
Culture Documents
Project overview
September 2020
Sydney Metro
is Australia’s
biggest public
transport project
Project summary 6
Station locations 16
Project alignment 20
St Marys Station 22
Luddenham Station 26
Aerotropolis Station 30
Rail corridor 32
Community consultation 42
Early investigations 45
Next steps 45
Contact us 46
4
About this
project overview
5
Project summary
The project is a key part of delivering an integrated
transport system for the Western Parkland City.
The Western Parkland City covers districts in
Greater Western Sydney including the established
centres of Greater Penrith, Liverpool and
Campbelltown–Macarthur.
New metro rail is set to become
the transport spine for the The new railway will link residential areas with job
hubs and the nationally-significant Western Sydney
Greater Western Sydney region,
International airport.
with planning for the Sydney Metro
The project will provide a major economic stimulus
– Western Sydney Airport project in the heart of Western Sydney, supporting 14,000
moving ahead. jobs during construction, with more than 250 new
apprenticeships on offer.
6
Western Sydney Aerotropolis will support 200,000 The Australian and NSW governments have a
new jobs and will be a focal point for Australian shared objective of having Sydney Metro – Western
innovation, research and productivity. Sydney Airport operational when the airport opens
for passenger services.
The Sydney Metro – Western Sydney Airport project
will have new metro stations at: Construction is planned to start in late 2020.
• Airport Terminal
7
The biggest urban
rail project in
Australian history
St Marys
13 stations 4000 commuter 36 kilometres
car parks
Orchard Hills
Luddenham
Airport
West Business Park
(final alignment to be confirmed)
Airport
Terminal
Western Sydney
Eight stations Aerotropolis
Connecting Greater Western Sydney
Parramatta and the population, 2036
Sydney CBD
Leppington
Western Sydney
Airport Line (final alignment to be confirmed)
Schofields
Kellyville
Hills
Showground
Cherrybrook
M7 Bella Vista
Castle Hill
Norwest
Opened
M2
2019 Macquarie
Epping University
Macquarie Park
Chatswood
M4 North Ryde
Westmead
Parramatta
Crows Nest
Waterloo
Hurlstone Dulwich
Campsie Park Hill
Bankstown Lakemba Opening
Canterbury Sydenham
Marrickville 2024
Belmore
Punchbowl Wiley Park
Liverpool
M5
Key
Metro North West Line
Sydney Metro City & Southwest
Sydney Metro West
(final alignment to be confirmed)
Sydney Metro West optional station
Sydney Metro – Western Sydney Airport
Servicing Greater Western Sydney and
Western Sydney International Airport
(final alignment to be confirmed)
Sydney Trains suburban network
Future Metro
9
A new railway for
Greater Western Sydney
A new metro station at Western Sydney Delivering rail to service the future
Aerotropolis – a future economic hub research, innovation and commercial
for Greater Western Sydney. precinct in Luddenham.
10
More opportunities for locals with A new metro station at St Marys
access to future employment delivering a fast and efficient
and education hubs within the interchange with the existing Sydney
Western Parkland City. Trains suburban rail network.
Creating well-connected centres that Sydney Metro uses Opal ticketing and
are easily accessible for customers using fares are set by the NSW Government,
different transport modes including the same as the rest of the Sydney
cycling, walking paths and vehicles. public transport network.
11
The Western Sydney
City Deal
Supporting the airport and Aerotropolis is a key The City Deal commits all levels of government
part of the Western Sydney City Deal, a 20-year to work together to deliver more jobs for Western
agreement signed in March 2018 by the Australian Sydney and improve the region’s liveability through
Government, the NSW Government and local 38 commitments, including better connectivity,
governments of the Blue Mountains, Camden, an improved environment, and more housing and
Campbelltown, Fairfield, Hawkesbury, Liverpool, education outcomes for the region.
Penrith and Wollondilly.
Delivering the Western Sydney Airport metro
project, linking Western Sydney International airport
and the Aerotropolis with the broader Sydney rail
network, is a key City Deal commitment.
12
Why this project
is needed
This city-shaping metro rail project The project will provide essential rail connection
to service the new Western Sydney International
will support nationally-significant
airport and support planned growth in Western
growth in Western Sydney, with Sydney Aerotropolis and other future commercial
fast and efficient access between and residential precincts.
existing and future residential Sydney Metro will make it easier and faster to
centres and employment hubs across get around, boosting economic productivity by
Greater Sydney. supporting new jobs and educational opportunities
closer to home.
10 90
Currently more than
320,000 residents 10 million annual million A third of mins
Western Sydney residents spend
travel outside the 320,000
International an average
Western Sydney
airport travellers of 90 minutes
region for work or
by the early 2030s. commuting
study everyday.
to work.
2016
Aerospace Freight
Tourism and logistics
and defence
Health care Knowledge
Industrial Population
and education intensive serving
Health,
17% 17% 25% 35% research +200,000 Building and Food and
and advanced more jobs construction agribusiness
manufacturing
13
City shaping rail
The Greater Sydney Commission’s ‘Towards our The NSW Government’s Future Transport 2056
Greater Sydney 2056’ outlines how the city is strategy supports the 30-minute cities concept
planning for future decades. Created on the and builds on the 2012 NSW Long Term Transport
30-minute cities concept, the NSW Government is Master Plan, which has guided unprecedented
investing in significant new infrastructure projects investments in transport services and infrastructure
designed to deliver a renewed urban environment across NSW.
for Sydney that changes the patterns of where
The Sydney Metro – Western Sydney Airport project
people live and work, how they enjoy their spare
is key part of delivering an integrated transport
time and how they travel.
system for the Western Parkland City, as envisaged
New metro rail would help optimise land use and in Future Transport 2056.
development, supporting precincts and places
The project is key to the development of future
at station locations and helping to stimulate
precincts in the Western Parkland City.
economic activity and innovation through the
co-location of industries.
14
The project will provide a connection to the
T1 Western Line at St Marys and two new stations
within Western Sydney International airport.
Future key precincts at Orchard Hills and
Luddenham will be serviced by two new stations,
and a new station will service the commercial heart
of Western Sydney Aerotropolis.
Sydney Metro has been working with Sydney Metro will support the success
stakeholders and industry to create of the future Western Parkland City
a project that will deliver a fast, with confirmed stations at St Marys,
safe and reliable metro. Orchard Hills, Luddenham, Airport
Business Park, Airport Terminal and
Western Sydney Aerotropolis.
Different types of
metro railway stations
Cut-and-cover station
Open-cut station
Elevated station
16
Population and
supporting new jobs
How we choose
a metro station
location
17
18
Stations are designed to be
an easy part of daily journeys.
19
Project alignment
Line
T1 Western
Street
St Marys
Key
Glossop
Sydney Metro – Western Sydney Airport
Claremont
Tunnel Great
South Penrith Meadows West
er n Hig
hway
Sydney Train station
oad
Services facility Hills
Mamre R
Existing Sydney Trains
suburban rail network
d
oa
Future M12 Motorway rkR
Pa
e
in
Western Sydney International sk
Er
(Nancy-Bird Walton) Airport
Road
ly Pipelin
es am
r Supp e nh
ct Wate dd
Prospe Lu
b a to
agam
Warr Luddenham
M
am
re
M12
Roa
d
M12
Mount Vernon
Luddenham
Park Road Elizabeth
Drive
Airport
Airport Business Park
Terminal
ad
Creek Ro
s
er y
Badgerys
dg
Creek
Ba
Bringelly
Th
eN
ort
he
rn
Ro
ad
Aerotropolis 0 2 km
N
St Marys
Station
The proposed St Marys metro Station
would be located under the existing
Feature Description
Sydney Trains suburban rail station Strategic centre, a new gateway
at St Marys and would have two Centre type
to Sydney
entrances, one on Station Street
Sydney Trains suburban rail
and one on Harris Street.
network, walking and cycling,
Transport connections
The new St Marys metro Station bus, taxi/ride share,
would provide easy, efficient and kiss and ride, park and ride
accessible interchange with the
One station entrance on Station
existing T1 Western Line. The station
Proposed station entry Street and one station entrance
would include a new concourse
on Harris Street
bridge that would connect north
and south of the station precinct.
Station type Cut and cover
This new gateway to Sydney would
become an important metropolitan Provision for integrated Yes, in consideration of the area’s
transport interchange and would play station and precinct local character and relevant
a vital role in the revitalisation and development planning controls
renewal of St Marys as a strategic
Local government area Penrith City Council
centre: promoting future employment
growth, supporting the local
population now and into the future
and improving connections across
Greater Western Sydney. The new
station would also provide customers
with easy access to bus services
and walking and cycling links.
22
Airport Business Park Airport Terminal Aerotropolis
St Marys
ad
Forrester Ro
Aerotropolis
et
Glossop Stre
Harris
Street
Station
Street
Phillip S
treet
ge Street
eet
et
treet
Gidley Stre
Queen Str
Glossop S
Lethbrid
Key
Project footprint 0 100m
Indicative station site
23
St Marys Orchard Hills Luddenham
Orchard Hills
Station
The proposed Orchard Hills Station
would be located on the eastern side
Feature Description
of Kent Road, north of Lansdowne
Centre type Local centre
Road. The station would have one
entrance on Kent Road with provision
Walking and cycling, local bus,
for a second entrance east of
Transport connections kiss and ride, park and ride,
the station.
taxi/ride share
The station would service a future
Kent Road and possible eastern
residential, commercial and mixed-use Proposed station entry
connection
precinct. A metro station at Orchard
Hills would help transform the area into Station type Open cut
a compact, high-amenity and walkable
new community. Provision for integrated Yes, in consideration of the area’s
station and precinct local character and relevant
development planning controls
24
Airport Business Park Airport Terminal Aerotropolis
St Marys
M4 Motorway
Aerotropolis
Kent Road
oad
sden R
el Mar
Samu
Lansdow
ne Road
Key
Project footprint 0 100m
Indicative station site
25
St Marys Orchard Hills Luddenham
Luddenham
Station
The proposed Luddenham Station
would be located near Luddenham
Feature Description
Road, between the Warragamba
Centre type Town centre
pipeline and the new airport. The
station would have one entrance
Local and rapid bus, kiss and ride,
on the western side of the
Transport connections park and ride, taxi/ride share,
station’s platforms.
walking and cycling
The station would be designed
to support the future employment, Proposed station entry New local road
research and knowledge-based
employment precinct in Luddenham, Station type Elevated
along with mixed-use residential
development with access to jobs, Provision for integrated
To be determined by the Western
transport and green space. station and precinct
Sydney Planning Partnership
development
26
Airport Business Park Airport Terminal Aerotropolis
St Marys
Aerotropolis
ad
Ro
m
ha
den
d
Lu
Key
Project footprint
0 100m
Indicative station site
27
St Marys Orchard Hills Luddenham
28
Airport Business Park Airport Terminal Aerotropolis
St Marys
ElizaEbeth
lizabD
eri
thveDrive
Aerotropolis
Airport Business
Airport Business
ParkPark
Station
Station
Airport
Airport
Terminal Station
Terminal Station
ad
ad
Ro
Th T
Ro
e N he
ek
ek
or No
ys Cre
th rt
ys Cre
er he
n rn
Ro R
Badger
ad oa
Badger
Key 0 1km
0 1km
Western Sydney International airport site
Indicative station site
29
St Marys Orchard Hills Luddenham
Aerotropolis
Station
The proposed Aerotropolis Station
would be located east of Badgerys
Feature Description
Creek Road, serving the commercial New central business district,
heart of Western Sydney Centre type
known as the Aerotropolis Core
Aerotropolis, known as the
Bus (including the new Rapid
Aerotropolis Core. There would be
Bus network), kiss and ride,
two entrances – one on the eastern
temporary park and ride, taxi/
side and the other on the western
ride share, walking and cycling
side of the station. Transport connections
and safeguarded for a future
Aerotropolis Station would become interchange with an East-West
a major transport interchange, Rail Link and South West Rail
providing important connectivity Line extension
to the future new central business
district of the Western Parkland City. Proposed station entry New street
30
Airport Business Park Airport Terminal Aerotropolis
St Marys
Road
Aerotropolis
ys Creek
Badger
The
R
e tr
ea
t
Aerotropolis
Station
e
iv
Dr
rk
Pa
n
lvi
Ke
lace
edich P
M
Key
Aerotropolis site 0 100m
Indicative station site
31
St Marys Orchard Hills Luddenham
Rail corridor
Due to topography and construction methodologies, The railway is built at ground level. The railway
operational needs and to get the best outcome corridor is fenced and monitored by the
for customers, the alignment is made up of fully-automated railway system, with intrusion
a combination of: detection technology keeping train operations safe.
Tunnels Skytrain
Twin metro railway tunnels built by tunnel boring The railway is elevated above the ground on
machines take the railway below ground under a viaduct, with the station platforms also built
roads and property. above ground.
The tunnel boring machines are underground The skytrain viaduct allows the communities below
mechanical factories, which dig out the rock then to remain connected, with vehicles and people free
build the tunnel as they go, leaving behind them to move above under the structure.
a fully-formed tunnel which is then fitted out with
tracks and overhead wiring.
The 4-kilometre skytrain viaduct runs between Rouse Hill and Bella Vista on the Metro North West Line, taking the
railway 13 metres above the ground and allowing free movement beneath it – keeping communites connected.
32
Airport Business Park Airport Terminal Aerotropolis
Patons La
ne
m R oad
ad
Ro
ale
enha
kd
oc
Ludd
St
Corridor between Patons Lane in Orchard Hills and the new Luddenham Station,
near Luddenham Road. 0 500m
ad
Ro
m
ha
en
dd
Lu
Elizabeth
Drive Aerial photography by Nearmap, flown June 2020
Key
Project footprint
Aerotropolis site
33
Claremont Meadows Sydney Metro Trains
St Marys services facility Orchard Hills Facility – Orchard Hills Luddenham
Supporting services
and infrastructure
Sydney Metro Trains Facility – Tunnelling
Orchard Hills
Sydney Metro – Western Sydney Airport would
The project requires land to stable metro trains and require the construction of twin tunnels between
to house the maintenance and operational facilities the St Marys and Orchard Hills stations and
associated with running a world-class metro railway. between the Airport Terminal and
Aerotropolis stations.
A stabling and maintenance facility with an
operations control centre would be located It is anticipated that tunnel boring machines would
at Orchard Hills. be launched from sites at Orchard Hills and the
Airport Business Park.
The stabling and maintenance facility would
support operations for the new metro line These sites would provide support for tunnelling
and would be used for fleet maintenance. operations including:
• spoil storage and removal of crushed rock
The facility would also house offices, worker
parking and storage. • power supply to the tunnel boring machines
Services facilities
• site clearing
34
Bringelly
Airport Business Park Airport Terminal services facility Aerotropolis
Grea
t We Wentw
stern orth R
High oad
way
ay
Verdelho W
Borde
aux Plac
t
tree
e
ps S
Gip
ad
SunfloStwMarys
Ro
er Drive St Marys
m
ha
en
dd
Lu
Aerotropolis Aerotropolis Patons La
ne
Key
Project footprint
St Marys
Road
Derwent
Aerotropolis
Sydney’s new metro railway is a Trains will be stabled and maintained here and
the driverless system will be controlled from here
state-of-the-art driverless system.
as well.
The new airport line will be controlled
At the Operations Control Centre, expert train
from the Sydney Metro Trains Facility
controllers will monitor every aspect of the system,
– Orchard Hills. including the lifts, escalators and platform screen
doors used in the fully-accessible railway.
36
Bringelly
Airport Business Park Airport Terminal services facility Aerotropolis
Signalling and communications systems will control Australia’s first driverless railway, Sydney’s Metro
the trains, tunnel and platforms to deliver a safe and North West Line, has carried more than 20 million
reliable journey. people since services started in May 2019 and,
around the world, millions of people use driverless
The system, which includes hundreds of cameras,
networks every day in cities like Paris, Singapore,
minimises the time trains are stopped at stations
Dubai and Hong Kong.
and the time between each train. It is a secure
system with no external connections, as a safeguard. Before passenger services start, the operator
will have to be accredited by the National Rail
Safety Regulator.
37
An artist’s impression of Airport Business Park Station.
38
39
Placemaking and
station precincts
The Sydney Metro – Western Sydney Airport project Integrated station and
is a chance to build more than just railway stations.
precinct developments
Through excellence in design and delivery, Sydney
Metro will deliver places which:
New metro stations create opportunities to provide
• respond to the community’s needs for community needs in consideration of the future
• are architecturally unique and easy to get around vision, relevant planning controls and local character
of each area. An integrated station and precinct
• are intuitive and safe, and promote people’s health
development is made up of the metro station and
and wellbeing
building(s) above and/or around the station that
• are active and vibrant with a mix of uses and could deliver a range of uses like community
activities. facilities, retail and commercial office spaces, new
homes and green spaces and shops and restaurants.
Through urban design principles and placemaking,
Sydney Metro precincts will be more than Opportunities for station and precinct
somewhere to catch the train – they will become developments are being investigated at St Marys
the centre of communities and provide for a and Orchard Hills.
variety of uses.
All future precinct development would be subject
Sydney Metro will work closely with communities to separate planning approval processes and would
and stakeholders on how best to integrate stations include community and stakeholder engagement.
that are thriving, welcoming hubs for everyone to
Future development around the Luddenham and
enjoy, with new places for people to live, work, shop
Aerotropolis stations are being considered through
and play – and public spaces designed to encourage
the Western Sydney Aerotropolis Plan that is
walking, cycling and social interaction. The stations
being delivered by the Western Sydney
will be vibrant places and landmarks in their own
Planning Partnership.
right that will support the success of the Western
Parkland City.
40 St Marys.
Improving
liveability
is
er
at
m
sto
th
e
cu
The
Delivering a
world-class metro
Enhancing Promoting
productivity connectivitiy
cen
t re of tro
Sydney Me
41
Community
consultation
Around 320 people responded to the survey Visit our project website
in July, sharing their views on how they sydneymetro.info
expect to use the new service, and how they
would like to be updated about potential
construction impacts.
42
Community survey feedback
In February 2020, community members were invited to share their views to help shape
future metro station precincts in Greater Western Sydney
Aged
0.5% Orchard Hills
A sense of community
The benefits
of a metro
station in your Metro Reduced Improved Jobs created Local areas
community connections
with other public
travel
on roads
connections close to new
metro stations
revitalised with
cafes, restaurants
transport and shops
43
Working with
the community
44
Early
investigations
Sydney Metro is continuing to undertake site Sydney Metro will continue to undertake work
investigations along the project alignment to assist across its projects in accordance with current
with the planning and design of the railway and government advice, and will continue to implement
stations. Activities include geotechnical social distancing and travel and hygiene measures
investigations, noise monitoring and heritage and to protect members of the community and
ecology surveying. The community will be notified employees. Continuing with works is critical
in advance of works. to ensuring project continuity, and the project team
will review and assess activities in line with any
further updates.
Early Consultation
The Sydney Metro – Western Sydney Airport project Environmental Assessment
Requirements (SEARs)
team will develop detailed planning and
environmental assessment documents for public
exhibition and community consultation.
We
An Environmental Impact Statement for the project Receive SEARs are
here
will be placed on public exhibition.
Formal Consultation
including construction impacts, noise and Environmental Impact your
vibration, site access, traffic and metro operations. Statement – minimum 28 days say
The project team will also host a series of
community information sessions where members
of the Sydney Metro – Western Sydney Airport team Review submissions and prepare
will be available to answer questions. and submit Submissions and
Amendment Report (if required)
Start construction
Open to passengers
45
Contact us
Sydney Metro – Western Sydney Airport, PO Box K659, Haymarket NSW 1240
Jekk għandek bżonn ta’ interpretu, ikkuntattja TIS National fuq 131 450
u staqsihom biex iċemplu 1800 717 703.
يرجى االتصال بخدمة الترجمة الكتابية والشفهية على،إذا كنتم بحاجة إلى خدمات مترجم
وبعد ذلك.1800 717 703 واطلبوا منهم االتصال بمترو سيدني على الرقم131 450 الرقم
.سيقوم المترجم بمساعدتكم في الترجمة
Nếu quý vị cần dịch vụ thông dịch viên, xin liên lạc Dịch vụ Thông Phiên Dịch
(Translating and Interpreting) ở số 131 450 và yêu cầu gọi Sydney Metro ở số
1800 717 703. Sẽ có thông dịch viên giúp cho quý vị việc thông dịch.
यद ि आपको दुभ ाष िए क ी से व ाओं क ी ज़रूरत है, तो कृ पया अनु व ाद एवं दुभ ाष िया से व ा
(Translating and Interpreting Service) से 131 450 पर सं प र्क करें और उन्हें सिडन ी मे ट् रो
1800 717 703 पर को फोन करने का निवे द न करें । फिर दुभ ाष िया अनु व ाद में आपक ी मदद करे गा।
如果您需要口譯員的服務,請致電131 450聯絡翻譯和口譯服務,要求他們致電
1800 717 703給悉尼地鐵 (Sydney Metro)。然後口譯員將會協助您翻譯。
131 450
1800 717 703
sydneymetro.info