ENVIRONMENTAL MANAGEMENT PLAN

EMP – which essentially involves the measures required to protect and enhance the environment –
is in line with the Proponent’s adherence to sound environmental policies and to provide guidelines
by which compliances with environmental laws and regulations may be ascertained. It essentially
involves various significant impacts during operation phase, i.e. generation, solid waste.

The aspects of an effective and complete Environmental Management Plan are:

• The identification of potential environmental impacts of the Project and formulation of


corresponding Mitigating Measures;

• The Environmental Monitoring Plan;

• The Institutional Plan

3.1 IMPACT MANAGEMENT PLAN

EMP-2
Table EMP-1 Impact management Plan (IMP) is the summarized tabulated form of the impact and mitigation measures.

ENVIRONMENTAL POTENTIAL IMPACT PROPOSED MITIGATING MEASURES COST OF MITIGATING PERSON GUARANTEES
COMPONENT MEASURES OF RESPONSIBLE FOR (MOAs, ETC)
LIKELY TO BE ENHANCEMENT THE CONTRACTS
AFFECTED IMPLEMENTATION

I. CONSTRUCTION PHASE / DEVELOPMENT PHASE


 Designation of temporary storage
area.
Will depend on the Third-party Contract
contractor’s fee hauler/Proponent/ between
 Regular collection through private PCO proponent and
garbage collector contractor

 Designation of temporary storage Included in the operational Third-party Included in the


area prior to collection cost contractor/ operational
Devaluation of land values as Proponent/PCO cost
LAND a result of improper solid  Provide proper construction Will depend on the Third-party Contract
waste management machines and vehicles and contractor’s fee contractor/Proponen between
maintain them properly t/Planners/Engineers proponent and
contractor
 Regular collection through City Included in the operational Proponent/PCO Included in the
Garbage collector cost. operational
cost
 Collection / buying of scrap / Included in the operational Proponent/PCO Included in the
reusable cost operational
cost

EMP-3
 Ensure proper maintenance of
vehicles
 Resident’s / Visitor’s vehicles not
Possible Degradation in Air Included in the operational Proponent / Third Wil be included
under the control of proponent
Quality  Sprinkling of water grounds setting cost Party Contractor in the TOR.
standard time
 Regular preventive maintenance of
AIR heavy equipment and service
vehicles
 Installation of Air Pollution Control
Device

Noise pollution  Installation of noise control Third-Party Shall be


devices such as mufflers and Contractor/Propon included in
suppressor to all equipment Php 15,000.00 per year
 Regular maintenance of heavy ent/PCO the TOR
equipment construction machinery

EMP-4
Change in Drainage  Consider the design of storm
Morphology/ Inducement drainage lay-out if it can handle Third-Party Included in
WATER the contract
of Flooding in Stream the amount of rainfall during Included on expenses of Contractor/Propon
Volumetric Flow heavy rains contractor during ent/PCO of contractor
 Clearing of storm drainage construction phase.
canals
Shall be
included in
Depletion of Water the Utility
Resources Competition in  Water is supplied by Manila Php12M per year Admin Management
Water Use Water Company Inc. Budget
Degradation of Surface
Water Quality  Require contractors to collect Third-Party Included in
used oil and other hazardous Included on expenses of Contractor/Propon the contract
waste for appropriate disposal contractor during ent/PCO of contractor
 Use of silt fences and sediment construction phase.
traps, cover exposed earth Third-Party
especially before heavy rains Contractor/Propon
ent/PCO Included in
are expected, benching of cuts,
the contract
use of sediment basins
of contractor
PEOPLE Pre- employment  Priority given to qualified local Included in Administration Proponent Included in
residents Fee the pre-
construction
fund/budget

EMP-5
Safety and Health of  Ensuring proper training must Part of construction cost. Third-Party Included in
Workers During be given to the workers before Contractor/Propon the pre-
Construction Phase actual site construction ent/PCO/Safety construction
assignment and Personal Officer fund/budget
Protective Equipment must be
distributed to them.

II. OPERATIONAL PHASE

 Proper storage to the allotted Part of Proponent/PCO/ Included in


area maintenance/operational Management Operational
 Regular collection through a cost Cost
LAND Devaluation of land value private garbage collector
as a result of improper contracted by the company
solid waste management  Provision of MRF

 Regular collection through City Part of Proponent/PCO/ Included in


Garbage collector maintenance/operational Management Operational
 Collection / buying of scrap cost Cost
trading company

 Proper collection and storage of P50,000.00/year Proponent/PCO Included in


hazardous wastes to be generated Operational
during the construction phase. Cost

 Resident’s / Visitor’s vehicles


AIR Degradation of Air Quality not under the control of the Php70,000.00/year Proponent/PCO/ Included in
proponent. Management Operational

EMP-6
 Ensure proper maintenance of
Treatment Machines for Cost
Hazardous Waste
 Sprinkling of water on grounds
 Installation of APCF/Device
such as scrubbers and Dust
Collectors

 Schedule use of
Increase in ambient noise equipment/machines emitting Php40,000.00/year Proponent/PCO Included in
level high noise during day time Operational
operation Cost
 Defective equipment/parts
with abnormal noise will be
either replaced or repaired
 Coverage of Facility that emits
high noise during operation

WATER  Control of wastewater Part of Maintenance Cost Included in


Change in Drainage discharge by the Sewage P5M for STP design the
Morphology/ Inducement Treatment plant (STP) and construction Maintenance
of Flooding in Stream Budget
Volumetric Flow

Php10,000.00 for Planting Included in


 Planting of Trees and other
of the
vegetation
Trees/Landscaping operational

EMP-7
cost

 Water supply is supplied by the P12M per year Included in


Depletion of Water Manila Water Company Inc. Management / PCO the
Resources Competition in Operational
Water Use Costs

 Regular inspection and


Degradation of maintenance of Septic Tanks Php100,000.00/year PCO/Maintenance Included in
Groundwater Quality and discharge pipelines to STP the
P15,000 per quarter for Maintenance
 STP effluent should comply
Water Analysis Budget
with the Effluent Standards of
DENR for Class C. Management / PCO Secured
 Training of workers on safety
Discharge
and emergency procedures.
Permit from
Laguna Lake
Development
Authority
(LLDA)

PEOPLE  Continue the host community Unable to


In-migration first policy in hiring process and N/A Proponent determine yet
qualified applicants

 To tap up local suppliers on Unable to


Generation of Local N/A Proponent

EMP-8
purchasing goods and determine yet
Benefits suppliers, provided that their
prices are competitive.

 Paying of appropriate taxes


wherein barangay and LGU will
benefit.

III.ABANDONMENT PHASE

LAND  Proper stockpiling of Unable to determine yet Will be


Generation of solid accumulated debris, Proponent/ included in
wastes/debris coordinating with local hauler Contractor/PCO the
for hauling and clearance of
contractor’s
debris
scope of work

 Proper identification of location Will be


of the stated hazardous waste Php50,000.00 Demolition/ included in
prior to abandonment and to Abandonment the
secure its location if ever can’t Contractor/PCO contractor’s
be transported immediately. scope of work

AIR  Sprinkling of water to suppress Sprinkling of


Degradation of Air Quality Unable to determine yet Will be included in water to

EMP-9
dust during dismantling suppress dust
 Scheduling certain high noise the contractor’s during
emitting works to more scope of work/PCO dismantling
acceptable times of day

WATER Coursed through the existing septic Will be


Generation of domestic tank Unable to determine yet Contractor/PCO included in
wastewater the
contractor’s
scope of work

PEOPLE Compensate based on HRD / Will be


Unemployment included in
tenure Referral and endorsement Management the
based on performance
contractor’s
scope of work