2-17 IMPACT MANAGEMENT PLAN (IMP)


TEMPLATE

IMPACT MANAGEMENT PLAN (IMP)


TEMPLATE
Options for
Project Phase / Environmental Aspect Guarantee /
Environmental Component Potential Prevention or Responsible
(Project Activity Which Will Likely Impact Cost Financial
Likely to be Affected Impact Mitigation* or Entity
the Environmental Component) Arrangements
Enhancement
(include only applicable
I. PRE-CONSTRUCTION PHASE modules )
Environmental Aspect # 1 A. The Land
Environmental Aspect # 4 B. The People
(include only applicable
II. CONSTRUCTION PHASE modules)
Environmental Aspect # 1 A. The Land
Environmental Aspect # 2 B. The Water
162

Environmental Aspect # 3 C. The Air


Environmental Aspect # 4 D. The People
(include only applicable
III. OPERATION PHASE modules)
Environmental Aspect # 1 A. The Land
Environmental Aspect # 2 B. The Water
Environmental Aspect # 3 C. The Air
Environmental Aspect # 4 D. The People
(include only applicable
IV. ABANDONMENT PHASE modules)
Environmental Aspect # 1 A. The Land
Environmental Aspect # 2 B. The Water
Environmental Aspect # 3 C. The Air
Environmental Aspect # 4 D. The People

*At the FS/pre-ECC stage, mitigation measures shall aim to comply with air/water environmental standards which is the 3 rd or “limit level” in the EMB system of management and monitoring of Environmental
Quality Performance. The Proponent is referred to the Technical Procedures Handbook of the SEPMES Project available with the EMB on the technical details of EQPLs. See Annex 2- 20 on Environmental
Monitoring Plan with Environmental Quality Performance Levels for the formulation of the EQPL scheme.