REPORT (CMR)
PRESENTED BY:
ENGR. JESSA MARIE R. ELIARDA
AREA INSPECTOR
EMB-DENR XI
LEGAL BASIS
Project compliance with the conditions set in the ECC and the
Environmental Management Plan (EMP);
Effectiveness of environmental measures on prevention or
mitigation of actual project impacts in relation to the predicted
impacts used as basis for the EMP design; and
Continual updating of the EMP for sustained responsiveness to
project operations and project impacts.
OBJECTIVES
Revised Procedural Manual of DAO 2003-30
ECC CONDITIONS
PERFORMANCE
AGAINST: EMP
• For WORKSHOP:
URL: http://online.emb.gov.ph/cmrdemo/
Have it notarized
EXAMPLE: ECC-CO-1234-5678