Initial Environmental Examination (IEE) Checklist Report for Building Projects

BUILDING PROJECTS
INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST REPORT FORM

I. ENVIRONMENTAL IMPACT AND MANAGEMENT PLAN

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
LAND
 Consistency with Current land use w/in 1km radius  See attached proof of compatibility with
land use (as per zoning ordinance): land use


Residential  Limit project activities to what is
Commercial/ Institutional
compatible to the land use

Industrial 
Others , specify

Agricultural/ Recreational
Protected Areas
Others, specify Cost integrated in the budget in
the construction cost /
operation cost.

Actual land uses w/in 1km


radius:


Residential
Commercial/ Institutional Cost integrated in the budget in
the construction cost /
Industrial Operation cost.

Agricultural/ Recreational
Protected Areas
Others, specify

 Page 1 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

Land tenure / Identify land tenure / Obtain appropriate clearances/ permits 
 Regularly monitor
compatibility issue compatibility issues: from concerned agencies presence/absence of

CARP 
Resettlement Plan prepared
complaints

CADC/ CADT/ CALC/ CALT

Provide relocation/disturbance  Regular coordination with

ROW compensation packages LGU or appropriate agencies

Informal settlers 
Ensure participation of IPs in

Ecologically sensitive or consultations and dialogues 
Others, specify
protected area 
MOA prepared/signed

Others, specify 
Provide adequate buffer

Others, specify


Disturbance to Existing vegetation in the area:  Comply with conditions of DENR/LGU  Annual inspection of area
wildlife due to Forestland
SLUP, Tree Cutting Permit, ROW, PCA
Permit
replanted/ re-vegetated
vegetation clearing
Marshland 
Others, specify
 Limit land clearing as much as possible
Grassland  Provide temporary fencing for
Mangrove vegetation that will be retained
Wetland  Promote restoration of damaged or Cost integrated in the budget in
the construction cost /
destroyed vegetation where possible operation cost.
Others, specify (e.g., tree planting)

 Page 2 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

Change in surface Slope: Considering the natural hazards and
climate projections in the area:
 Regular inspection of slope 
Slope/ Erosion
landform/ 
Flat (0-3%) protection measures in Control Cost:
topography/
 sloping to rolling (3-
Gently

Provide erosion control and slope erosion-prone areas
terrain/slope
18%)
protection measures 
Regular inspection for new
 
Designate a Spoils Storage Area, with eroded areas near the site

Soil Erosion
Steep (>18%) topsoil set aside for later use and allow 
Others, specify
maximum re-use of spoils

Construct during dry season

Others, specify
Is the project site located in an 
Stabilize embankment with grasses or
area identified by MGB/PAG- other soil cover
ASA/ PHIVOLCS as hazard
prone?

Conduct Engineering Geological and
Geo-hazard Assessment (EGGA) and
Yes implement corresponding

No
✔ recommendation

Others, specify

Building of Structure Presence of visually significant 


Set up temporary fence around the  Daily inspection of waste
and Improper solid landforms/landscape/structures? construction area handling including
waste disposal leading
to:
Yes 
Implement landscaping and other
segregation in
waste/recycling bins
 No

beautification measures
Impairment of visual  Weekly inspection of waste
aesthetics
Solid Waste Management
Scheme in the area:

Provide adequate buffer accumulation and disposal

Devaluation of land SLF

Compensate adjacent property owners
Regular inspection of Cost integrated in the budget in
values  Implement re-use and recycling of landscaping and other the construction cost /
MRF waste materials beautification activities
operation cost.

Composting  Provide receptacles / bins for solid 


Regular monitoring of buffer

Regular Collection of Solid
✔ wastes and implement proper zones
segregation, collection and disposal of
Wastes
domestic wastes in designated areas  Regular monitoring for
presence/absence of

Coordinate with the municipal / city complaints from adjacent
waste collectors property owners

 Page 3 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost


Engage third party company for waste 
Others, specify
collection

Others, specify
Cost integrated in the budget in
the construction cost /
operation cost.

WATER

Specify nearest/receiving water  Set up proper and adequate sanitary


Regular (ocular) inspection of  Cost integrated in the
water body for: construction/
body: facilities
Naga River


Ensure strict observance of proper

Drainage/canal systems

operation cost
waste handling and disposal and Wastewater treatment facility
proper sanitation including by the (i.e., grease trap, septic tank,

Increased siltation contractors and its workers (if any) etc.
due to project
activities

Provide wastewater treatment facility Regular monitoring of the
Distance to nearest/receiving (e.g., oil and water separator, etc.) following:

Water quality water body: 
Set up silt trap/stilling ponds to Parameter Frequency
degradation
0 to less than 0.5 km minimize downstream siltation
 

Others, specify
 
pH Annual
0.5 to 1 km Provide three-chambered septic tank

Semi-


More than 1 km
for domestic sewage annual

Provide ring canals around fuelling 
Quarterly
Classification of nearest water tanks/ motorpool/ maintenance areas
body: 
Others, specify

TSS 
Annual


Freshwater 

Marine/ Strictly application of secondary containment for
concentration 
Semi-
liquid hazardous. annual
coastal water

Quarterly
AA 
SA

BOD 
Annual
A 
SB 
Semi-
B 
SC annual


C ✔

SD 
Quarterly

 
 Page 4 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

D

Current Use of nearest/ receiving


water body:
Fishery
Tourist Zone / Park
Recreational
Industrial
Agricultural

Others, specify:

Zero application of water use.

Cost integrated in the budget in


the construction cost /
operation cost.

Distance of project area to the


nearest well used:


0 to less than 0.5 km
 0.5 to 1 km
 More than 1 km

Use of nearest well:



Drinking/Domestic

Industrial
Agricultural

Competition in Size of population using  Implement rainwater harvesting  Regular monitoring for
water use proposed water source: and similar measures as an presence/absence of Cost integrated in the budget in


Depletion of water 
≤ 1,000 persons alternative source of water
 Observe water conservation
complaints the construction cost /
operation cost.
resources 
>1,000 and ≤ 5,000 persons measures
 Regular coordination with
concerned agencies

 Page 5 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

>5,000 persons 
Carefully select project site to avoid  Regular monitoring for
disruption of traditional water uses occurrences of water
Current Use of water source : 
Obtain Water Permit from NWRB shortages
Fishery 
Improve efficiency of water supply and 
Others, specify
Tourist Zone / Park distribution system
Recreational 
Others, specify
Industrial
Agricultural


Others, specify
Zero application of water use.

Cost integrated in the budget in


the construction cost /
operation cost.

Available/nearest water source.



Deepwell


Water district/LGU

Surface water

Others, specify

 Page 6 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

Increased Is the project site located in an 
Use appropriate design for project  Regular monitoring for
occurrence of area identified by MGB/ facilities presence/absence of
PAG-ASA as flood prone? complaints
flooding
 
Implement appropriate drainage
Yes system  Regular coordination with

No


Regularly remove debris and other
concerned agencies
materials that may obstruct water flow  Regular monitoring for
increased frequency of

Use appropriate technology (e.g., flooding Cost integrated in the budget in
raised hand-pumps) to protect drinking the construction cost /
water from flood contamination 
Others, specify operation cost.


Others, specify

AIR / NOISE
Air quality degradation Distance to nearest community: 
Properly operate and maintain all  Regular monitoring for  Cost integrated in the

0 to less than 0.5 km emission sources (e.g. vehicles, presence/absence of construction/
complaints

0.5 to 1 km generator, etc) operation cost
  Quarterly Monitoring of TSP

More than 1 km Strictly enforce good housekeeping
practices during construction stage
Is the wind direction blowing
towards the nearest community 
Control vehicle speed to lessen Regular (ocular) inspection of:
most of the year? suspension of road dust
 
Absence of white or black
Yes Conduct water spraying to suppress smoke from vehicles,
dust sources and minimize discomfort to

No
nearby residents
generator, etc.


Use covered vehicles to deliver

Presence of truck cover
during deliveries
materials that may generate dust

Others, specify

 Page 7 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost

Nuisance due to Distance to nearest community: Properly operate and maintain all noise  Regular monitoring for
  Cost integrated in the
noise generation 
0 to less than 0.5 km sources (e.g., vehicles, generator, etc.) presence/absence of construction/

0.5 to 1 km 
Install appropriate noise control
complaints operation cost


More than 1 km device/s (e.g., mufflers, silencer, sound 
Regular monitoring of buffer
barriers, etc.) zones

Provide adequate buffer and planting of
trees

Others, specify

PEOPLE


Displacement of Size of population of host 
Provide relocation/disturbance  Regular monitoring for  Cost integrated in the
residents including barangay: compensation packages presence/absence of construction/
complaints
indigenous people (if

≤ 1,000 persons  Prioritize local residents for operation cost
any) in the project employment  Regular coordination with
site and within its 
>1,000 and ≤ 5,000 persons
 Promptly pay local taxes and other
LGU
vicinity 
>5,000 persons financial obligations 
Others, specify

Enhanced Indigenous People Size:
employment and/or
livelihood
Regular coordination with LGU
opportunities 
Prior consultation and coordination to
minimize disruption of daily domestic

Reduced activities
employment and/or
livelihood 
Ensure participation of IPs in
opportunities Classification of host barangay: consultations and dialogues & consider

Increased revenues 
Urban
IP rights and cultural practices in the
provision of relocation/disturbance
for LGU 
Rural compensation packages

Disruption/

Provide appropriate traffic/warning
Competition in Employment/Livelihood Opportunity signs, lighting, etc
delivery of public Rate in the host Municipality:
services (e.g.,

High

Others, specify
education, peace

 Page 8 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost
and order, etc.)

Low

Enhanced delivery of Description
public services (e.g.,
education, peace
and order, etc.)

Increase in traffic
volume and
worsening of traffic
flow
Available services within/near
the host barangay:

Schools (e.g. elementary,
high school, college)

Health facilities (e.g., clinics,
hospitals, etc.)

Peace and order (e.g., police
outpost, Brgy. Tanod, etc.)

Recreation and sports
facilities

Others, specify


Destruction/disturban Physical Cultural resources 
Implement appropriate protocols based 
Regular coordination with
ce of physical cultural within the vicinity of the project on NM, NHCP, NCAA and LGU NM, NHCP, NCAA and LGU
resources. site guidelines including those for chance
( if project site has been finds (if any). Specify:
identified to have such by NM,
NHCP, NCAA and LGUs)

 Page 9 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’

Initial Environmental Examination (IEE) Checklist Report for Building Projects

Possible Monitoring Parameters/


Preventive/Mitigating Measures
Environmental/Social Baseline Environment Implementation Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation cost


Impacts on Source of risks (please specify)  Regularly coordinate with LGU  Regular monitoring for  Cost integrated in the
community health 
Explosives : Provide appropriate warning signs, presence/absence of construction/
and safety lighting and barricades, whenever complaints operation cost

Others, specify practicable  Regular coordination with
 Observe proper housekeeping LGU


Provide on-site medical services for
 Regular submission of
reports to concerned agency
any emergency.

Flammable substances:


Participate in public awareness 
Others, specify

I 101 (Used oil)


programs on health and safety

Implement appropriate safety programs
for both community and workers
 Strictly comply with fire, safety and
similar regulatory requirements



Toxic substances:
✔
Others, specify Cost integrated in the budget in
the construction cost /
Collection of hazardous waste by the accredited operation cost.
D 406 (Battery) third party hauler and treater.
D 407 (Busted Bulb)


Others, specify

 Page 10 of 12
Project Name: Treatment Storage and disposal facility Category ‘F’