Professional Documents
Culture Documents
Projects
� Protected Areas
� Others, specify
N/A
Project Name:
Page 1 of 13
Monitoring Parameters/
Possible Preventive/ Mitigating Measures Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
� Land Tenure / Land tenure / compatibility Regularly monitor OK
compatibility issue � Obtain appropriate clearances/ permits
issues: presence/absence of
from concerned agencies: complaints
� CARP N/A
Regular coordination with
� CADC/ CADT/ CALC/ CALT LGU or appropriate
agencies
� ROW
� Others, specify
� Informal settlers
N/A
� Ecologically sensitive or
protected area � Resettlement Plan prepared
� Others, specify � Provide relocation/disturbance
N/A compensation packages
� Ensure participation of IPs in
consultations and dialogues
� MOA prepared/signed
� Provide adequate buffer
� Others, specify
N/A
� Disturbance to Existing vegetation in the area: � Comply with conditions of DENR/LGU Annual inspection of area OK
replanted/ re-vegetated
wildlife due to � Forestland SLUP, Tree Cutting Permit, ROW, PCA
vegetation clearing Permit � Others, specify
� Marshland
� Limit land clearing as much as possible
� Grassland � Provide temporary fencing for
� Mangrove vegetation that will be retained
� Promote restoration of damaged or
� Wetland
Monitoring Parameters/
Possible Preventive/ Mitigating Measures Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
� Others, specify destroyed vegetation where possible N/A OK
(e.g., tree planting);
N/A
� Provide adequate buffer zone
� Others, specify
N/A
� Change in surface Slope: Considering the natural hazards and � Regular inspection of OK
climate projections in the area:
landform/ 🗆 Flat (0-3%)
✔
N/A
Monitoring Parameters/
Possible Preventive/ Mitigating Measures Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
🗆✔
Soil/Land Existing soil type in the area: 🗆 ✔
Secondary containment (pls specify : 🗆 ✔
Monitoring of soil OK
🗆 ✔
basic
✔
Conduct of soil test/analysis
for petroleum fuel content and
other parameters relevant to
the potential source of
contamination (if
any, specify):
Building of Structure Solid Waste Management 🗆 Set-up temporary fence around the
✔
☑ Daily inspection of waste OK
and Improper solid Scheme in the area: construction area handling including
waste management ☑ Implement re-use and recycling of waste segregation in
� SLF
leading to: materials waste/recycling bins.
🗆✔
Impairment of visual � MRF ☑ Implement proper segregation, ☑ Weekly inspection of waste
aesthetics � Composting collection and disposal of domestic accumulation and disposal
wastes in designated area
🗆 ✔
Regular Collection of Solid
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
� Devaluation of land Wastes ☑ Provide receptacles / bins for solid wastes Regular inspection of
values
� Composting of Organic Wastes landscaping and other
Presence of visually significant
landforms/landscape/structures?
🗆 Coordinate with the municipal / city
✔
beautification activities
waste collectors Regular monitoring of
🗆 Yes
✔
� Engage third party company for waste buffer zones
collection
� No � Implement landscaping and other ☑ Regularly monitor
beautification measures presence/absence of
� Provide adequate buffer complaints from adjacent
property owners
� Compensate adjacent property owners
Others, specify
� Others, specify
N/A
WATER
� Increased siltation Specify nearest water body: Set up proper and adequate sanitary Regular (ocular) inspection of: Cost integrated in the
due to project
activities
RIVER
facilities
Ensure strict observance of proper waste
🗆 ✔
Drainage/canal systems construction/ operation
cost
🗆 Water quality
✔
disposal/handling and proper sanitation
🗆 ✔
Wastewater treatment
PHP 2,500.00
facility (i.e., grease trap,
degradation including by the contractor and its
septic tank, etc.)
� Others, specify workers (if any)
Regular monitoring of ambient
Provision of wastewater treatment
water for the following:
N/A Distance to nearest water body: facility (e.g., septic tank, oil and water
separator, etc.) Parameter Frequency
� 0 to less than 0.5 km � Set up silt trap/settling ponds to
🗆 ✔
0.5 to 1 km minimize downstream siltation 🗆 ✔
pH 🗆 Annual
� More than 1 km 🗆 ✔
Provide ring canals around fuelling 🗆 ✔
Semi-annual
tanks/ motor pool/ maintenance areas � Quarterly
Size of population using � Monthly
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
receiving surfac e water: � TSS
� ≤ 1,000 pe � Others, specify concentra � Annual
rsons N/A
tion
� Semi-annual
🗆 ✔
>1,000 and ≤ 5,000persons
� Quarterly
� >5,000per son � Monthly
� BOD � Annual
Classification of nearest water
body : � Semi-annual
🗆 ✔
Freshwater � Marine/ coastal
� Quarterly
water � Monthly
� AA � SA � Color � Annual
� Semi-annual
� A � SB
� Quarterly
� B � SC
� Monthly
🗆 ✔
C � SD
� Annual
� Total
� D Coliform
� Semi-annual
� Quarterly
Current Water Use:
🗆 ✔
Fishery � Monthly
� Recreation al
🗆 ✔
Semi-annual
� Quarterly
� Industrial
🗆 Agricultural
✔
� Monthly
🗆 ✔
Total
Petroleu
� Annual
� Competition in Size of population using � Implement rainwater harvesting and Regular monitoring for Cost integrated in the
water use proposed water source: presence/absence of construction/ operation
similar measures as an alternative
🗆✔
Depletion of water � ≤ 1,000 persons source of water complaints cost
resources 🗆 ✔
>1,000 and ≤ 5,000 Observe water conservation measures Regular coordination with PHP 2,500.00
🗆 ✔
Increased Is the project site located in an
area identified by MGB/
☑ Use appropriate design for project Regular monitoring for Cost integrated in the
occurrence of facilities including appropriate drainage presence/absence of construction/ operation
flooding PAG-ASA as flood prone? mechanism considering the existing complaints cost
� Yes local drainage system. Regular coordination with PHP 2,500.00
🗆 ✔
No 🗆 Regularly remove debris and other
✔ concerned agencies
materials that may obstruct water flow Regular monitor of
� Use appropriate technology (e.g., raised increased frequency of
hand-pumps) to protect drinking water flooding
from flood contamination � Others, specify
� Others, specify
N/A
N/A
AIR / NOISE
Air quality
✔ Distance to nearest community: ☑ Properly operate and maintain all emission ☑ Regular monitoring for Cost integrated in the
degradation � 0 to less than 0.5 km sources (e.g. vehicles, presence/absence of construction/ operation
� Nuisance due to pumps, generator, etc.) complaints cost
generation of 🗆✔
0.5 to 1 km
obnoxious/unpleasa nt
☑ Install appropriate air pollution control
Regular (ocular) inspection of:
PHP 2,500.00
� More than 1 km device/s:
odor Is the wind direction blowing ☑ Absence of white or black
towards the nearest community smoke from vehicles,
most of the year? generator, etc.
🗆 ✔
Yes ☑ Regularly monitor for
presence/absence of
� No
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
☑ Control vehicle speed to lessen suspension complaints
of road dust ☑ Regular monitoring for
🗆 Conduct water spraying to suppress dust
✔
obnoxious odor
sources and minimize discomfort
to nearby residents
🗆 Control vehicle speed to lessen
✔
housekeeping practices
� Use of environment-friendly deodorizer or
odor masking substances
� Spraying natural / microbial
disinfectants
� Provide adequate buffer and/or planting of
trees
� Others, specify
N/A
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
🗆✔
Nuisance due to 🗆 Properly operate and maintain all noise
✔
Regular monitoring for Cost integrated in the
noise generation sources (e.g., vehicles, pumps, presence/absence of construction/ operation
generator, etc.) complaints cost
� Install, when applicable, the appropriate � Regular monitoring of PHP 2,500.00
noise control device/s (e.g., mufflers, buffer zones
silencer, sound barriers, etc.)
🗆 Implement appropriate operating hours
✔
N/A
🗆✔
Gas Emission 🗆 ✔
Regular and efficient maintenance of ✔
Monitor for gas leak OK
mechanical equipment
PEOPLE
Monitoring Parameters/
Possible Preventive/ Mitigating Measures Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
� Displacement of Size of population of host � Provide relocation/disturbance Regular monitoring for OK
residents including barangay: compensation packages presence/absence of
indigenous people (if Prioritize local residents for complaints
any) in the project � ≤ 1,000 persons employment Regular coordination with
site and within its 🗆 ✔
>1,000 and ≤ Promptly pay local taxes and other LGU
vicinity 5,000persons financial obligations
🗆✔
Enhanced � Others, specify
� >5,000person
employment and/or Regular coordination with LGU N/A
on in delivery of 🗆 ✔
Urban signs, lighting, etc.
public services � Others, specify
� Rural
(e.g., education,
peace and order, Employment/Livelihood
etc.) Opportunity within the host
🗆✔
Enhanced delivery municipality
N/A
of public services
(e.g., education,
🗆 ✔
High
� Low
peace and order, Description :
etc.)
� Increase in traffic THERE ARE MANY LIVELIHOOD
volume and OPPURTUNITY WITHIN THE HOST
worsening of traffic MUNICIPALITY BECAUSE OF THE
ASSISTANCE OF THE GOVERNMENT
flow AGENCIES (NATIONAL AND LOCAL).
N/A
� Destruction/disturban Physical Cultural resources � Implement appropriate protocols based Regular coordination with OK
ce of physical cultural within the vicinity of the project on NM, NHCP, NCAA and LGU NM, NHCP, NCAA and
resources. site: guidelines including those for chance LGU
(🗸 if project site has N/A finds (if any). Specify:
been identified to have N/A
such by NM, NHCP,
NCAA and LGUs)
Monitoring Parameters/
Possible Preventive/ Mitigating Measures
Implementation
Environmental/ Social Baseline Environment Remarks
Impacts Cost of preventive/mitigating as well as monitoring integrated in the construction /operation
cost
🗆✔
Impacts on Source of risks Regular coordination with LGU Regular monitoring for Cost integrated in the
community health presence/absence of construction/ operation
and safety
Explosive substances: 🗆 Provide appropriate warning signs,
✔
complaints cost
UNDERGROUND TANKS CONTAINING lighting and barricades, whenever � Regular monitoring of
GASOLINE. practicable buffer zones PHP 2,500.00
Safety Risks Observe proper housekeeping Regular coordination with
Fire 🗆 Provide on-site medical services for
✔
LGU
Explosion any emergency. Regular submission of
� Release of toxic
materials ☑ Flammable substances:
🗆 Participate in public awareness
✔ reports to concerned
programs on health and safety agency
� Structural failure GASOLINE ITSELF
🗆 Implement appropriate safety programs for
✔
� Others, specify
both community and workers
Strictly comply with fire, safety and
N/A
similar regulatory requirements
� Strictly comply with requirements of RA
6969
� Toxic substances � Others, specify
N/A
N/A
Oil spills
� Others, specify
N/A