This Generic IEE Checklist Report shall be used as the interim pro-forma EIA Report
requirement for projects to be located within Environmentally Critical Areas (ECA) where a
customized IEE Checklist Report Form has not yet been developed but are required IEE
Checklist Report Form or IEE Report per existing guidelines
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if any,
following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and affected
areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization Scheme
(PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO 2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces provided
or otherwise check () the appropriate boxes □ or parenthesis ( ). Boxes with check marks ()
are automatically required. Use additional sheets if necessary and indicate this in the
appropriate space.
Total Project/Building
Footprint Area _______________________________________________________
(Area actually utilized)
Project Proponent: _______________________________________________________
_______________________________________________________
Office Address:
Contact Person: _______________________________________________________
Designation: _______________________________________________________
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
See attached vicinity map/s and photographs of the project site and site development/layout plan.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum
used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
Specification/
Area (sq. m.) /
Facilities No. of Units Description /
Capacity
Remarks
Support Facilities (e.g. emergency
generators, boilers, etc.)
Admin support (e.g., canteen, office,
clinic, quarters, etc.)
Water source / supply
Drainage system
(Please list facilities by module/grouping. Use additional sheets if needed)
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Measures
Power/Electricity KWh
1.4 MANPOWER
a. Construction Phase
Manpower Requirement Expertise/Skills Total
b. Operation Phase
Manpower Requirement Expertise/Skills Total
Possible Environmental/ Baseline Environment Preventive/ Mitigating Measures Monitoring Parameters/ Cost of Mitigation/ Monitoring
Social Impacts Implementation
LAND
þ Consistency with land Current land use w/in 1km radius þ See attached proof of compatibility with
use (as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
___________________
Disturbance to wildlife Existing vegetation in the area: þ Compliance with conditions of DENR/LGU þ Annual inspection of area þ Cost integrated in the
due to vegetation Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated construction /operation cost
clearing Marshland
Permit
þ Limit land clearing as much as possible
Grassland
þ Provide temporary fencing for vegetation
Mangrove that will be retained
Wetland þ Promote restoration of damaged or
Is the project site located in an area Compliance with the DENR Administrative
identified by MGB/PAG-ASA/ Order No. 2003-30 and DENR
PHIVOLCS as hazard prone? Administrative Order No. 2000-28,
Yes Implementing Guidelines on Engineering
No Geological and Geo-hazard Assessment
(EGGA).
þ Soil/Land contamination Existing soil type in the area: þ Implementation of the Ecological Solid þ Daily inspection of þ Cost integrated in the
due to improper solid sandy Waste Management Plan (ESWMP) waste/recycling bins for construction /operation cost
waste disposal
clay Set-up temporary fence around the segregation
þ Daily inspection for presence
sandy-loam
construction area
of mixed garbage in the
þ Implement re-use and recycling of waste
Others, specify materials
facility
____________
þ Implement proper segregation, collection
þ Weekly inspection of waste
accumulated
and disposal of domestic wastes in
designated areas Others, specify
þ Provide receptacles / bins for solid wastes _____________
Coordinate with the municipal / city waste
collectors
Increased siltation due Specify nearest/receiving water þ Set-up proper and adequate sanitary Regular (ocular) inspection of: þ Cost integrated in the
to project activities
body:
____________________________
facilities Drainage / canal systems construction/ operation cost
Water quality þ Strictly require the contractor and its Water treatment facility (i.e.,
degradation Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
and proper sanitation
Others, specify body:
___________________ 0 to less than 0.5 km Strictly observe proper waste handling and Quarterly monitoring of the
disposal following:
0.5 to 1 km
þ Provision of wastewater treatment facility pH
More than 1 km (e.g. septic tank, oil and water separator, TSS concentration
etc.)
If nearest/receiving water body is
Set up silt trap/stilling ponds to minimize
BOD
fresh water, specify classification:
downstream siltation Total Coliform
AA
Provision of three-chambered septic tank Color
A for domestic sewage Oil and Grease
B Provide ring canals around fuelling tanks/
C motorpool/ maintenance areas
D Others, specify
___________
AIR / NOISE
Air quality degradation Distance to nearest community: Properly operate and maintain all emission þ Regularly monitor þ Cost integrated in the
0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km
Install when applicable, the appropriate air
Regular (ocular) inspection of:
pollution control device/s
Strictly enforce good housekeeping
Absence of white or black
smoke from vehicles,
practices heavy equipment and
Control vehicle speed to lessen generator
suspension of road dust Presence of truck cover
Conduct water spraying to suppress dust during deliveries
sources and minimize discomfort to nearby
residents
Use covered vehicles to deliver materials
that may generate dust
Other, specify
___________________
Nuisance due to noise Distance to nearest community: Properly operate and maintain all noise þ Regularly monitor þ Cost integrated in the
generation 0 to less than 0.5 km sources (e.g. vehicles, pumps, generator, presence/absence of construction/ operation cost
0.5 to 1 km etc) complaints
More than 1 km
Install when applicable, the appropriate Regular monitoring of buffer
noise control device/s (e.g., mufflers, zones
silencer, sound barriers, etc.)
Implement appropriate operating hours
Provide adequate buffer and/or planting of
trees
Others, specify
PEOPLE
Displacement of Size of population of host barangay: Provide relocation/disturbance þ Regularly monitor þ Cost integrated in the
residents in the project ≤ 1,000 persons compensation packages presence/absence of construction/ operation cost
site and within its >1,000 and ≤ 5,000persons þ Prioritize local residents for employment complaints
vicinity
þ þ Regular coordination with
Displacement of
>5,000person Promptly pay local taxes and other
LGU
financial obligations
Indigenous People
Classification of host barangay: þ Regular coordination with LGU Others, specify
Enhanced employment
Urban Prior consultation & coordination to
_________________
and/or livelihood
opportunities Rural minimize disruption on daily domestic
activities & respect for IP rights and
Reduced employment
Available services within/near the cultural practices
and/or livelihood
opportunities
host barangay: Ensure participation of IPs in consultations
LGU
school, college) Provide appropriate traffic/warning signs,
Disruption/Competition
Health facilities (e.g., clinics, lighting, etc
in delivery of public
hospitals, etc.) Others, specify
services (e.g., Peace and order (e.g., police ________________
education, peace and outpost, brgy. Tanod, etc.)
order, etc.) Recreation and sports facilities
Enhanced delivery of Others, specify
public services (e.g., _____________________
education, peace and
order, etc.)
Increase in traffic
volume and worsening
of traffic flow
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to
the best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising
from any misrepresentation or failure to state material information in this IEE
Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.