Professional Documents
Culture Documents
For
__________________________________________________________________
Project name or Title
Below is the IEE Report Checklist for Slaughter House Proponents. Read the
questions carefully before answering the space provided. Uses additional
sheet if necessary and indicate this in the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or ECC.
A. PROJECT DESCRIPTION
2.a Capitalization :
Authorized Paid-Up
3.a Land
3.a.1 Total Land Area, sq.m
50 meters radius
100 meters radius
200 meters radius
4. Project Description
Sewage System
______ Individual Septic Tank
______ Centralized Septic Tank
______ Communal Septic Tank
Sewage Disposal
______ Discharge to an existing public sewerage system
______ Treated in a community disposal plant or communal septic tank
______ Treatment in individual septic tank with disposal by absorption field
or leaching pH
______ Others, pls. Specify
Collection System
______ Association / Project Maintained Garbage Collection System
______ Integrated into the Municipal
______ Others, pls. Specify
1. Physical Environment
1.c Are the existing natural hazards in the area, e.g., landslides, gullying?
Subsidence. Etc.? _______
1.f Are there water bodies found inside or near the project site? __________
If yes please enumerate them: ____________________________________
2. Ecosystem Description
3. Socio-Economical Environment
3.a What is the total population of the barangay where the project is located?
3.b Are there existing settlements in the proposed slaughter house projects
that would be displaced?
_____________ household/families
_____________ legitimate landowners
_____________ tenants
_____________ informal dwellers
3.d Are there existing social infrastructures in the barangay within 200
meters radius from the project area?
________ schools
________ communications
________ health centers/clinics/hospitals
________ churches
________ transportation
________ roads
________ others, pls. Specify
Project: __________________________________________________________
_________________________________________________________
_________________________________________________________
Proponent’s Commitments
PERMITS/CLEARANCES ATTACHED?
Demolition Permit
Electrical Permit
Sanitary Permit
Building Permit
Water Rights Permit
Location Clearance / Certificate of
Locational Viability
DTI?SEC Registration
Safety (Fire) Permit
Municipal / Business Permit
Transfer Certificate of the Title
Colored photo of the site (different
perspectives)
Project Vicinity Map/Sketch
Project Lay-out Plan
Sewerage and Drainage Plan
WTP Plan
Map/delineation of primary &
secondary impact areas
Endorsement from the LGU
(Barangay Certificate)
Construction schedule in chart form
This is to certify that all the information and commitments in the Initial
environmental Examination (IEE) Report are true, accurate and complete.
Should I/we learn if any information, which would make the IEE inaccurate,
I/we shall bring the said information to attention of the Environmental
Management Bureau of DENR Regional Office.
I/we hereby bind myself/ourselves jointly and solidarily for any penalties that
may be imposed arising from and misrepresentations or failure to state
material information in the IEE.
________________________
Project Proponent
________________________
Title/Designation
________________________
Date
ACKNOWLEDGEMENT
Witness my hand and seal on the place and date above written.
Notary Public