You are on page 1of 13

INITIAL ENVIRONMENTAL EXAMINATION (IEE) CHECKLIST

For

MINI HYDRO POWER PLANTS

SECTION 1

1.0 GENERAL INFORMATION

1.1 Project Name/Title:


_______________________________________________
1.2 Proponent/Company: _______________________________________________

Address:
_______________________________________________
(Street/sitio, barangay, city/municipality, province)

Tel/Fax:
_______________________________________________
E-mail: _______________________________________________

1.3. Project Location:


_______________________________________________
(Street/sitio, barangay, city/municipality, province)

(Attach location maps, scale 1:25’000 and 1:10’000, with important landmarks, political
boundaries, access
points)

1.4 Scheme of Hydro Development :

Run-of-water Scheme Storage Scheme

1.5 Project Objective/s:


______________________________________________
______________________________________________
______________________________________________

1.6 Project Ownership:

Type of Owner(s): Single Proprietorship Corporation

Partnership/Joint Venture Cooperative

Others, pls. Specify: ________________________

1.7 List of Owners ( in case of partnership/corporation) :


________________________________________________________________
________________________________________________________________
________________________________________________________________

1.8 Project Cost

Total Project Cost (Range): ________________________________________

2.0 PROJECT AREA DESCRIPTION

2.1 Project Area Coverage:

Watershed area (km2):

IEE Checklist_Hydro Power Project


Page 1 of 13
Above weir/ intake: ___________________________________
Total watershed area of river: __________________________

Area of project sites (m2 or ha):

Total area: _____________


Structures: _____________ Buildings: ____ ______
Impoundment: __________ Switchyard: _______________
Others, pls. specify: __________________________________
(Attach location map(s), scale 1:10,000, showing all project sites)

2.2 General Water Appropriation:

Domestic Municipal Irrigation Power Generation

Fisheries Livestock Raising Industrial Recreational

Others, pls. specify: ______________

2.3 General Land Classification of project areas:

[ ] Public Land (ha): _____________


[ ] A ( applicable), (ha): ___________ [ ] D (disposable), (ha) : ____________

2.4 Present Land Use Classification (based on the approved land use/zoning ordinance of
the city/municipality).

[ ] Agriculture [ ] Residential [ ] Tourism


[ ] Industrial [ ] Forest Land [ ] Institutional
[ ] Commercial [ ] Open Spaces
[ ] Others, pls. Specify : ___________________________________

3.0 PROJECT COMPONENTS

3.1 Relevant Dimensions

Dimension Proposed Project


Plant Capacity MW
Max. Plant Discharge m3/s
Min Plant Discharge m3/s
Max. Headwater Level m.a.s.l
Min. Operating Headwater m.a.s.l
Level
Tailrace Water Level m.a.s.l
Estimated Net Head m.a.s.l
Total Storage Volume M3

3.2 Structures and Buildings

3.2.1 Description

Characteristics
Facility Specifications/Descrip
tions Area Length Height
[m2] [m] [m]
Weir N/A
Intake Structure N/A N/A
Headrace N/A
Surge Tank N/A
Forebay
Penstock N/A
Powerhouse N/A
Tailrace N/A
Switchyard N/A N/A
Other structures, pls.
specify

IEE Checklist_Hydro Power Project


Page 2 of 13
3.2.2 Access

Facility Access New or upgrading Access to


Project Site
Access from Distan Max. Leng Heig
(preferable main road) ce [km] allowable th ht
Weight on [m] [m]
road [t]
Weir
Headrace
Surge
Tank
Penstock
Powerhou
se
Other
structures,
pls.
specify

3.3. Transmission Line

Transmission from Switchyard to New Transmission Line


Location of next Substation/Tapping Voltage Length [km] Right-of-way [m]
Point [ V]

3.4 Resource Requirements

Water Demand:

Design Discharge (m3/s or I/s): __________________________________


Others, pls. Specify: __________________________________

Other Resource Requirements, pls. specify: __________________________

3.5 Water Treatment and Sewage Disposal

Is water used for other purpose than energy generation?


[ ] No [ ] Yes, pls. specify:

If yes, is there provision for water treatment?

[ ] No [ ] Yes, pls. describe: __________________


[ ] N/A

If sewage disposal is required, what system is used?

[ ] Individual Septic Tank [ ] communal Septic Tank


[ ] N/A

3.6 Handling and Disposal of Dangerous Substances

What kind of dangerous substances ( e.g. oil, lubricants, chemicals; pls. Specify)
are used during:

 Pre)Construction Phase:
________________________________________________________________

 Operation/Maintenance Phase:
_____________________________________________

Is an oil water separator installed?

[ ] No [ ] Yes, Location: _______________________________

IEE Checklist_Hydro Power Project


Page 3 of 13
What oil/Lubricants Collection and Disposal System is used?

Collection System: Volume of storage containers(I):__________________


Storage Location:_____________ ___________________

Disposal System:

[ ] Recycled [ ] Sold to Re-cyclers


[ ] Others, pls. Specify: _______________

3.7 Solid Waste Disposal System

Collection System:

[ ] Association/project-maintained garbage collection system


[ ] integrated into municipal garbage collection system
[ ] Others, pls. Specify: __________________

Disposal System :

[ ] Burning at open dumpsite [ ] Open dumpsite in project site


[ ] Sludge cleaning [ ] Municipality/City landfill site
[ ] Others, pls. Specify: _____________________________

Location of waste disposal site:

__________________________________________

3.8 Manpower and Employment

How many people will be employed by the proposed Mini Hydro Power Plant during:

 (Pre)Construction Phase: _______________________


 Operation and Maintenance Phase: _______________

(Attach listing of detailed manpower requirements)

3.9 Project Schedule

(Attach schedule of development activities from pre-construction, construction and


operation and operation phase)

3.10 Pictures of Project sites

(Attach schedule of project sites and its immediate vicinity looking up-and
downstream/north and south)

SECTION 2

4.0 BASELINE ENVIRONEMTAL CONDITIONS

4.1 Natural and Physical Environment

River characteristics (length of river between intake and tailrace, slope, waterfall, typical
flow depths), pls.
describe and attach maps/photographs:

_____________________________________________________________________________

_____________________________________________________________________________

IEE Checklist_Hydro Power Project


Page 4 of 13
Flood characteristics of the river:

Return Statistical flood discharge (as far as known)


Period
[Years] [m3/s]
2
5
50
100
500

Are there areas in the site where indication of soil erosion occur?

[ ] No
[ ] Yes, pls. specify and/or attach pictures: __________________________________

If yes, what causes the erosion? Pls. specify:

Have any landslide occurred or still are occurring in the project area?

[ ] No
[ ] Yes, pls. Specify and/or attach picture: _________________

What are the present used of water bodies (ground water surface water ) in the watershed
of the proposed
project area?

[ ] Washing [ ] Recreation (swimming, boating. Etc.)


[ ] Source of drinking water (body/ location / demand [I/s]):

_____________________________________________________________

Sanitation (body/location / demand [I/s]):

_____________________________________________________________

[ ] Irrigation (body/location / demand [I/s]):

[ ] Fishing(body/location / demand [I/s]):

_____________________________________________________________
_____________________________________________________________

[ ] Others, pls. Specify: ________________________________________

What is the present land use of the project wherein the structures and buildings of the
proposed mini hydro
power plant will be located?

Facility Area Present Land Use


[m2]or[h Categories see below
a]
Weir/Intake
Headrace
Surge Tank
Forebay
Penstock
Powerhouse
Tailrace
Switchyard
Others, pls.
specify
Categories:
(1) Prime agricultural land (productive/irrigated); (2) Prime agricultural land (idle/abandoned);
(3) Grassland; (4) Build-up; (5) Orchard; (6) Marshal/Mangrove; (7) Fishpond;

IEE Checklist_Hydro Power Project


Page 5 of 13
(8) Others (pls. Specify)

Was the present water quality in the river assessed?

[ ] No
[ ] Yes, pls. Insert results in table:

Parameter Sample
pH
Total Suspended ppm
Solids
Total Coliform No.
Oil and Grease Mg/l
Chlorides Mg/l
Copper Ppm
Lead Ppm
Iron Ppm
Manganese Ppm
Total Hardness Mg /l
Alkalinity Mg/l as CaCo3
Pesticides, pls.
Specify:
Pls. Describe methods and locations of sampling and attach chemical attests:
_____________________________________________________________
_____________________________________________________ ________
______________________________________________________________

4.2 Biological Environment

Are there flora and/or fauna of ecological or commercial significance to be found in the
water bodies near within
the project area that might be affected by the proposed project?

[ ] No, pls. discuss probable reasons:


___________________________________________________

____________________________________________________

____________________________________________________

[ ] Yes, pls. specify (water body/location/species/significance of the population):


____________________________________________________

____________________________________________________

What methods and data sources were used to assess the flora and fauna in the water
bodies? Pls. describe
and/or attach documents:
_______________________________________________________________________

_______________________________________________________________________

Is there flora and/or fauna of ecological or commercial significance to be found outside the
water bodies near
within the project area that might be affected by the proposed project?

[ ] No
[ ] Yes, pls. specify (location/location/significance):
____________________________________

_____________________________________________________________________________
______

4.3 Socio-Cultural, Economic and Political Environment

Are there existing settlements in the watershed area of the proposed project?

[ ] No

IEE Checklist_Hydro Power Project


Page 6 of 13
[ ] Yes, pls. specify(location/number of households. families and population):
_______________________________________________________________________
_______________________________________________________________________

What methods and data sources were used to gain information on the existing
settlements? Pls. describe and/or
attach documents:
_______________________________________________________________________
_______________________________________________________________________

What social infrastructures are located in or near the project area? Pls. describe.

Facility Location Capacity


Number of Sufficient
persons (yes/no)
School(s)
Health
Center(s)/Clinic(s)
Hospital(s)
Others, pls. specify

Is the political situation (peace and order) stable in the near the project area?

[ ] Yes
[ ] No, pls. describe:
___________________________________________________________________

___________________________________________________________________

What are the major employment and income sources in and around the project area?

Livelihood Percentage of Population living on


Farming
Fishing
Backyard poultry and piggery
Vending/Bug and Sell
Sari-sari store
Others, pls. specify:

Are there existing local non-governmental organizations in or around the project area?

[ ] No
[ ] Yes, pls. identify:
___________________________________________________________________

___________________________________________________________________

Social acceptability of the project assessed(community, government, non-governmental


organizations)?

[ ] No
[ ] Yes, pls. describe and/ or attach documents:
___________________________________________________________________

___________________________________________________________________

SECTION 3

5.0 IMPACT ASSESSMENT / MITIGATION MEASURES

5.1 Project Location and Design

Evaluation
Impact Relevant Magnitude Mitigation Measures Responsibility
Subjects and of Impact
Parameters
Loss of species Height of the [ ] none [ ] No mitigation

IEE Checklist_Hydro Power Project


Page 7 of 13
due to weir(m):_____ [ ] low measure
obstructions to [ ] [ ] Fishway or by-
movement of moderate pass planned. Pls.
aquatic life [ ] high Describe design and
arrangement of the
proposed mitigation
facility and attach
plans:

[ ] Further measures,
pls. specify.
Fish injuries due Width of [ ] none [ ] No mitigation
to passing openings of [ ] low measure
through turbine screen or rack at [ ] [ ] Planned
or across sharp intake (mm) : moderate measures, pls. Specify:
edged weir ____ [ ] high
Design of weir
spillway
Dying out of the Minimum [ ] none How is the residual
riverbed between residual flow with [ ] low flow provided?
the intake and proposed project: [ ] [ ] With a residual flow
the outlet -In m3/s or I/s: moderate section in the weir
____ [ ] high [ ] By-pass pipeline
In % of mean [ ] Other, pls. Specify
annual flow
without proposed [ ] Other measures,
project: ___ pls. specify:

Downstream Design and [ ] none Design and


Erosion due to arrangement of [ ] low arrangement of the
reduction or the weir and the [ ] weir and the intake?
inhibition of bed intake moderate Pls. Attach drawing or
load transport [ ] high plan:
Sludge alluvial Tot. storage [ ] none [ ] No mitigation
deposits, volume (m3): [ ] low measure
increased growth ______ [ ] [ ] Planned
of algae, Tot. surface area moderate measures, pls. Specify:
Reduction of of the [ ] high
capacity for self- impoundment
cleaning of the (m2): ________
water due to the
transformation of
a stream into an
impoundment
Impairment on Architecture, size [ ] none Architecture, size and
aesthetics or and construction [ ] low construction materials
cultural heritage materials of [ ] of major buildings? Pls.
due to protruding buildings and moderate describe and attach
structures structures: [ ] high plans:
Erosion due to Maximum slope [ ] none [ ] No mitigation
building of roads at construction [ ] low measure
and/or structures site (%, N/A if [ ] [ ] Slope stabilization
on steep slopes tunnel ): moderate with methods of bio-
-Weir and intake [ ] high engineering, pls.
structure: ___ Specify :
-Headrace____ [ ] Other slope
-Surge stabilization measures,
tank/Forebay:__ pls. Specify
___
-Penstock:____ [ ] Other measures,
- pls. Specify:
Powerhouse:___
_
-Tailrace:___
-Others, pls.
Specify:
_____
______

IEE Checklist_Hydro Power Project


Page 8 of 13
____
Construction Phase
Construction Estimated [ ] none [ ] No mitigation
work in sensitive duration of noisy [ ] low measure
environment and dust [ ] [ ] General guidelines
provoking moderate for construction work
activities during [ ] high (safety, health, and
construction at environment ). Pls.
all major project Attach guidelines and
sites (days or implementing
months)? procedures.
[ ] Restricting of hours
Estimated during which the
duration and offending activities are
volume of major carried out. Pls.
transport traffic Specify:
to construction
sites (days and [ ] Use of blast mats
trucks per day)? [ ] Maintenance of
equipment exhaust
Kind and number system
of machinery [ ] Removing and
used at major disposal of trees and
construction any vegetation pushed
sites? or felled into
watercourses
[ ] Inhibition of illegal
settlement and housing
of wild animals as well
as logging around the
construction work
[ ] Introduction of
speed limits on access
roads
[ ] Other measures,
pls. Specify:

Contamination of Storage, [ ] none [ ] following of the


soil and water handling and [ ] low regulation of RA 6969
due to spilling of disposal of [ ] [ ] Other measures,
dangerous dangerous moderate pls. Specify:
substances (fuel, substances [ ] high
oil, lubricants,
chemicals)
Loss of habitat Volume of [ ] none [ ] No mitigation
due to excavation in or [ ] low measure
excavation work at watercourses [ ] [ ] Erosion control
in watercourses (m3):______ moderate measures with
[ ] high methods of bio-
engineering, pls.
Specify:

[ ] Other erosion
control measures, pls.
Specify:

[ ] Protection
measures for fish
populations, pls.
Specify:

[ ] Other measures,
pls. Specify:
Erosion and Estimated [ ] none [ ] No mitigation
sedimentation volumes of spoil [ ] low measure
due to disposal from excavation [ ] [ ] Disposal of spoil
of spoil from work at moderate from excavation works
excavation work construction sites [ ] high at dedicated spoil and

IEE Checklist_Hydro Power Project


Page 9 of 13
(m3): ________ stockpile location, pls.
Specify location(s):

[ ] Related measures
(drainage, re-
vegetation )at stockpile
location, pls. Specify:

[ ] Other measures,
pls. Specify:
Operation and Maintenance
Obstruction to Functionality of [ ] none [ ] No mitigation
movement of mitigation [ ] low measure
aquatic life due facilities [ ] [ ] Frequent
to insufficient moderate maintenance of
functionality of [ ] high fishway or by-pass, pls.
the migration Describe measures:
facility
[ ] Other measures,
pls. Specify:
Loss of aquatic Estimated [ ] none [ ] No mitigation
life due to surges maximum [ ] low measure
as a variation of [ ] [ ] operation
consequence of downstream moderate guidelines to limit
intermittent discharge (m3/s) [ ] high surges, pls. describe:
operation of the during normal
hydro scheme plant operation [ ] Other measures,
within a period of pls. specify:
5 Minutes: ____
10 Minutes:___
60 Minutes:___

Loss of aquatic Volume of life [ ] none [ ] No mitigation


life due to storage, that will [ ] low measure
flushing of the be maintained [ ] [ ] Flushing during
impoundment during plant moderate natural floods
operation phase [ ] high [ ] Provision and
(m3/s):____ Implementation of
flushing guidelines, pls.
specify or attach
flushing guidelines:

If flushing during
natural floods is not
successful, what other
strategies are planned
to maintain the live
storage?
[ ] Dredging
[ ] Flushing outside
natural floods
[ ] Others, pls.
specify:

Accumulation of Design of intake [ ] none [ ] No mitigation


floating debris at [ ] low measure
the intake [ ] [ ] Measures to
moderate reduce or avoid
[ ] high accumulations of
floating debris at the
intake, pls. describe:

If there will be
accumulations of
floating debris at the
intake, how will it be
disposed? Pls.
describe:

IEE Checklist_Hydro Power Project


Page 10 of 13
Loss of habitats [ ] none [ ] No mitigation
due to de- [ ] low measure
watering of [ ] [ ] Relocation of fish
basins and moderate population prior to de-
channels during [ ] high watering of basins and
revision and channels
maintenance [ ] Other measures,
work pls. specify:
Abandonment and Rehabilitation Phase

Contamination of Abandonment of [ ] none [ ] No mitigation


soil and water plant facilities [ ] low measure
due to including all [ ] moderate [ ]
abandoned equipment [ ] high Abandonment
equipment (machinery, plan including
electro- cost estimate,
mechanical pls. describe and
equipment) attach plan:

[ ] Other
measures, pls.
specify:
Flooding due to
blocking of
abandoned dam
or weir

5.2 Risk Assessment

Risk Evaluation Mitigation Responsibility


Relevant Subject Magnitude of Measures
and Parameters Impact
Downstream Dam or weir [ ] none [ ] No mitigation
flooding due to stability [ ] low measure
failure of the dam [ ] moderate necessary
or weir [ ] high [ ] Monitoring of
dam or weir
stability; pls.
include
monitoring plan
(refer to
paragraph 6.3.)
[ ] Other
measures, pls.
specify:
Upstream Maximum flood [ ] none [ ] No mitigation
flooding due to water level in [ ] low measure
high head water impoundment if [ ] moderate necessary
level sluice gate is [ ] high [ ] Restricting
blocked activities near
(m.a.s.l.): ____ impoundment,
pls. specify:

[ ] Other
measures, pls.
specify:

SECTION 4

6.0 ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN

6.1. Environmental Management and Protection Plan

Subject Activity
Watershed Management and Protection Pls. describe or attach plan:
Protection of significant flora and fauna in or Pls. describe or attach plan:
near the project area

IEE Checklist_Hydro Power Project


Page 11 of 13
6.2. Disaster Preparedness Plan

Subject Activity
Flood Alarm System Alarm System provided?
[ ] Not necessary
[ ] Yes, please describe or attach plan:
Evacuation Plan Evacuation Plan provided?
[ ] Not necessary
[ ] Yes, please describe or attach plan:
Others, pls. specify:

6.3. Monitoring Plan

Subject Parameter, Location, Responsibility Cost Estimated


Frequency of
Monitoring
Water Quality
Fish Mitigation
Soil Erosion
Dam or weir stability

Waste disposal

Others, pls. specify:

7.0 ATTACHMENT AND ANNEXES

7.1 Government Permit and clearances

(Attach Photocopies of documents)

- Barangay and Municipal/ City Endorsement


- TCT/OCT/TD
- Location Clearance from HLURB
- National Water Resources Board (NWRB) Permit
- Other Permits or Clearances, if they are required for the proposed project, pls. specify:

7.2. Required Checklist Attachments

- Location maps, scale 1:25’000 and 1:10’000, with important landmarks, political
boundaries, access points
- Location map(s), scale 1:10’000, showing all project sites
- Listing of detailed manpower requirements
- Schedule of development activities from pre-construction, construction and operation
phase
- Pictures project sites and its immediate vicinity looking up- and downstream/ north and
south

7.3 Further Attachments and Annexes

____________________________________________________________
____________________________________________________________
____________________________________________________________

PROPONENT’S COMMITMENTS

I am / We are committing to

 Comply with existing environmental rules and regulations, guidelines and criteria;
 Comply with all mitigation measures that have been identified in the report;
 Support multi-partite monitoring efforts to be organized;
 Maintain the cleanliness of the general surroundings;
 Participate or contribute towards a communal cleaning effort;
 Strictly implement a risk management plan and safety programme;
 Organize and conduct information, education and communication (IEC) activities on
environmental, health and other civic issues;
 Others, pls. specify:

IEE Checklist_Hydro Power Project


Page 12 of 13
ACCOUNTABILITY STATEMENT

This is to certify that all the information and commitments in the Initial Environmental
Examination (IEE) Report are true, accurate and complete. Should I/we learn of any
information which would make the IEE inaccurate, I/we shall bring said information to the
attention of the appropriate EMB DENR Regional Office.

I/We hereby bind myself/ourselves jointly and solidarity for any penalties that may be
imposed from any misrepresentations or failure to state material information in the IEE Report.

_____________________________________________
Project Proponent

_____________________________________________
Title/Designation

_____________________________________________
Date

ACKNOWLEDGMENT

BEFORE ME this (day) ________ of ________________19____ at


(place)__________________________, personally appeared
____________________________________with Community Tax Certificate No.
_______________________________issued on ________________ at
____________________, in his/her capacity as
______________________(designation)_________________at ___________________ and
acknowledged to me that this IEE Report is his voluntary act and deed, and the voluntary
act and deed of the entity he/she represents. This document, which consists of
__________pages, including the page of which this acknowledgment is written, is an Initial
environmental Examination Report Checklist.

Witness my hand and seal on the place and date above written.

_________
____________________________
Notary
Public

Doc. No.___________________
Page No.__________________
Book No.__________________
Series of __________________

IEE Checklist_Hydro Power Project


Page 13 of 13

You might also like